water Technical Note Simplified Indirect Estimation of Pump Flow Discharge: An Example from Serbia Milica Raši´c Amon 1,2 , Milan Radi´c 1, Zoran Staji´c 1,2, Dejan Brki´c 1,2,3,* and Pavel Praks 3 Citation: Raši´c Amon, M.; Radi´c, M.; Staji´c, Z.; Brki´c, D.; Praks, P. Simplified Indirect Estimation of Pump Flow Discharge: An Example from Serbia. Water 2021,13, 796. https://doi.org/10.3390/w13060796 Academic Editors: Stefano Alvisi and Helena M. Ramos Received: 17 December 2020 Accepted: 10 March 2021 Published: 14 March 2021 Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. Copyright: © 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/). 1Faculty of Electronic Engineering, University of Niš, 18000 Niš, Serbia; [email protected] (M.R.A.); [email protected] (M.R.); [email protected] (Z.S.) 2Research and Development Centre “IRC Alfatec”, 18000 Niš, Serbia 3 IT4Innovations, VSB—Technical University of Ostrava, 708 00 Ostrava, Czech Republic; [email protected] *Correspondence: [email protected] or [email protected] Abstract: In the absence of a flowmeter or due to its inaccuracy, the flow rate at the discharge section of the pipeline following the observed pump can be roughly estimated if the pressure can be measured instead. To use the proposed procedure two main conditions should be achieved: (1) a manometer should be installed at the discharge pipeline between the pump and the flow regulation valve, and (2) the actual curve that relates pressure and flow for the observed pump unit should be known in advance. The described example is from Serbia, but it is of interest for any water pumping station with a submersible pump (installed in wells or tanks) where a limited number of adequate places for the measuring of flow are available (if any are available at all), but where the pressure at the discharge pipe of the observed pump can be measured. This simplified method can find applicability in installations in remote rural regions where limited resources are available. The results show that the calculated values of the flow obtained by the presented method deviate greatly in relation to the measured values provided by the portable ultrasonic flowmeter, up to 60% at one of the measuring points. However, in relation to the measured values provided by the permanently installed flowmeter the discrepancy is significantly lower (0.6–6.8%). Keywords: pumps; pressure drop; flow estimation; accurate measurement; pipelines; waterworks; flowmeter 1. Introduction In the absence of a flowmeter or due to its inaccuracy, the flow rate at the discharge section of the pipeline following the observed pump can be roughly estimated if the water pressure can be measured instead. Very often, it is practically impossible to select an adequate place for a flowmeter due to the presence of many elements in a water pumping station, such as valves and elbows where the pipeline changes its direction. The problem of incorrect measurements of the discharge flow rate in waterworks can be easily solved if a section of the pipe with an adequate length with no flow disturbances is foreseen at the discharge side of the observed pump. To solve the problem, in this practical technical note an alternative, simplified approach is given for a rough estimation of the flow rate at the discharge section of the pipeline of those pumps where the flowmeter is absent or when the reading from an existing flowmeter is unreliable due to an unfavorable pipeline configuration or due to any other reason [ 1 – 7 ]. A pump is a machine that is used to transfer quantities of liquids from one place to another, and here its flow-pressure characteristic is used to estimate water flow rate at the discharge side of water pumping stations. The presented simplified approach can be adapted to any other liquid, including crude oil where a special application can be found in offshore installations with limited places available for measurement. In practice, there are situations when there are no flowmeters installed in pumping stations (especially in remote low-income regions), which is especially common when it Water 2021,13, 796. https://doi.org/10.3390/w13060796 https://www.mdpi.com/journal/water
Water 2021,13, 796 2 of 15 comes to pumping stations of smaller capacity. In such cases, portable flowmeters are used to estimate the flow rate, i.e., the amount of liquid pumped in a certain period of time, but choosing the place of their installation is not easy. In certain installations with pumps, to make measurements, it is easier and less costly to install only a manometer (in already existing installations, this will prevent additional cutting of the pipeline to install a flowmeter). If the place at which a flow meter should be installed is not properly chosen in the design phase properly chosen in the design phase, the problem can be solved by a radical approach, which involves the excavation of a part of the pipeline that is otherwise underground. However, this radical approach involves significant costs and carries the risk of accidents. The proposed approach for flow rate estimation has a general character and can be applied in any pumping station with a submerged pump (in a tank or a well) provided that : 1. It has a pump unit with an in-advance known actual H(Q) curve gained from laboratory testing (possible discrepancy between the design system curves available from manufacturers and the on-site one is frequent and therefore such curves from catalogues should be re-evaluated if possible), and, 2. The pressure can be measured at the dischargeside of the observed pump. Restrictions include a lack of equipment to regulate the speed of the rotors, and the use of two or more pumps in a parallel configuration, which means that their performance cannot always be determined (especially true when the non-return valves at the pumps are not fully tightened). Such a situation often occurs in small remote pumping stations where the operating regime is not fully respected (the diameter of the suction pipe is not always the same as the discharge pipe diameter when, due to the risk of cavitation, a larger diameter of the suction pipe is usually used). In the absence of permanent measurements of flow in waterworks, or where accuracy is doubtful, the most commonly used practice is to compare the results that can be obtained from several different portable control meters (these are, as a rule, portable ultrasonic meters) [ 8 – 16 ]. We will also test our approach in this manner. As it will be presented, the results estimated following the recommendation from this practical technical note are more reliable compared to those obtained using portable flowmeters in systems with a complex geometry of pipeline following the pump [17–21]. Based on one practical example from Serbia, the theoretical background will be presented further in the text. This simplified method can find application in installations in remote, low-income regions where limited places for measurement are available (if any are available at all). Similar rough approximate methods for estimation of water flow using local pressure loss measurements are not known to the authors, but inaccuracies of flowmeters are not rare [22,23]. 2. The Description of the Proposed Approach To apply the simplified approach proposed in this work for flow-rate estimation, it is necessary to have a pump with in-advance precisely determined H(Q) curve and to have a manometer installed at the discharge side of the pump before the valve for flow regulation [ 24 , 25 ]. It is not advisable to rely on the catalogued characteristics of the pump, especially for older pump models. Even with the pump units of the same type and manufactured in the same year, the operating characteristics will not be the same and will depend on their real condition such as the number of operating hours, the wear of impellers, the condition of bearings, the number of overhauls and losses in electric motors, etc. Figure 1shows a general arrangement of elements required for the application of the proposed indirect flow rate estimation in a pump station with submersible pumps (the flowmeters depicted in red are not present at all or are possibly inaccurate due to the unsuitable place of placement in a complex pipeline configuration). The example of the placement of a portable flowmeter shown in Figure 1is a typical example of an
Water 2021,13, 796 3 of 15 inappropriate position in which a significant error in flow measurement occurs (high measurement uncertainty). Water 2021, 13, x FOR PEER REVIEW 3 of 16 flowmeters depicted in red are not present at all or are possibly inaccurate due to the unsuitable place of placement in a complex pipeline configuration). The example of the placement of a portable flowmeter shown in Figure 1 is a typical example of an inappropriate position in which a significant error in flow measurement occurs (high measurement uncertainty). Figure 1. The layout of the elements required for flow rate estimation. Regarding the scheme from Figure 1, one should not forget about the pressure loss in the vertical section of the pipeline—the pressure measured at its top is lower than at the pump head. Taking into account the complexity of the pipeline, the equivalent characteristics of the pump should be evaluated through the analysis of the individual system of pipes on which the pump is installed. In such a case, it is difficult to talk about the compliance or noncompliance of the measured characteristics to those given by the pump manufacturer. In practice, there are situations where flowmeters are not installed in pumping stations, which is especially common when it comes to pumping stations of smaller capacity (usually with two pump units that do not work in a parallel configuration, but where one of them is used as a backup pump). In such cases, portable flowmeters are used to estimate the flow rate, i.e., the amount of liquid pumped in a certain period, while the choice of the position of their installation is not easy. If there are no manholes prepared in advance, it is necessary to excavate the ground around the pipeline. In such situations, this is not a common practice, but rather the flowmeter is placed in any accessible place. For the flow-rate estimation, the pressure can be expressed in [Pa] (in [bar], where 1 bar = 105 Pa) or as a pressure head in a unit of length [m], where these two forms are related as 𝑝 =𝜌·𝑔·𝐻, where 𝑝 is pressure [Pa] measured by the manometer at the discharge side (exactly above the pump), 𝜌 is the density of the water ~1000 kg/m3, g is gravitational constant ~9.81 m/sec2, while 𝐻 is pressure head [m]. 𝐻 is the correction in [m], which depends on the height difference between the position of the manometer and the water level in the tank. If the water level in the tank is constant during the experiment, the velocity at the suction side is 𝑉 =0 [m/s]. The velocity at the discharge side 𝑉 depends on the pipeline diameter and the flow rate, which are unknown variables at the beginning. This problem can be solved either by the implementation of iterative analysis, or by proper choice of the position of the manometer (as it is shown in Section 3.2.1). Neglecting local losses from the point of fluid suction to the point of pressure measurement, total head H in [m] can be estimated using Equation (1): Figure 1. The layout of the elements required for flow rate estimation. Regarding the scheme from Figure 1, one should not forget about the pressure loss in the vertical section of the pipeline—the pressure measured at its top is lower than at the pump head. Taking into account the complexity of the pipeline, the equivalent characteristics of the pump should be evaluated through the analysis of the individual system of pipes on which the pump is installed. In such a case, it is difficult to talk about the compliance or noncompliance of the measured characteristics to those given by the pump manufacturer. In practice, there are situations where flowmeters are not installed in pumping stations, which is especially common when it comes to pumping stations of smaller capacity (usually with two pump units that do not work in a parallel configuration, but where one of them is used as a backup pump). In such cases, portable flowmeters are used to estimate the flow rate, i.e., the amount of liquid pumped in a certain period, while the choice of the position of their installation is not easy. If there are no manholes prepared in advance, it is necessary to excavate the ground around the pipeline. In such situations, this is not a common practice, but rather the flowmeter is placed in any accessible place. For the flow-rate estimation, the pressure can be expressed in [Pa] (in [bar], where 1 bar = 10 5 Pa) or as a pressure head in a unit of length [m], where these two forms are related as pdis =ρ·g·H , where pdis is pressure [Pa] measured by the manometer at the discharge side (exactly above the pump), ρ is the density of the water ~1000 kg/m 3 ,gis gravitational constant ~9.81 m/sec 2 , while H is pressure head [m]. Hg is the correction in [m], which depends on the height difference between the position of the manometer and the water level in the tank. If the water level in the tank is constant during the experiment, the velocity at the suction side is Vsuc = 0 [m/s]. The velocity at the discharge side Vdis depends on the pipeline diameter and the flow rate, which are unknown variables at the beginning. This problem can be solved either by the implementation of iterative analysis, or by proper choice of the position of the manometer (as it is shown in Section 3.2.1). Neglecting local losses from the point of fluid suction to the point of pressure measurement, total head Htin [m] can be estimated using Equation (1): Ht=pdis ρ·g+Hg+V2 dis 2·g(1)
Water 2021,13, 796 4 of 15 To test the approach for indirect estimation of pump flow discharge proposed here, the valve at the discharge side of the pump should be fully open. Further, the valve needs to be gradually closed in discrete steps, which changes the values of the flow and subsequently of the pressure. Therefore, for each achieved stationary operating point, the values of the pressure pdis from the manometer should be recorded. Based on Equation (1) and graph in Figure 2, it is possible to estimate the flow rate Qest at the discharge side of the observed pump. The curve in Figure 2relates the total head Ht and the flow rate Q and has to be obtained from the manufacturer’s catalogue or preferably from a laboratory test in advance. The possibility of discrepancy between the laboratory characteristics and characteristics from the catalogue is something that exists in reality, especially for an older pump, which has been in service for a long period of time and has been defined by valid technical standards (such as [ 26 ]). Depending on the type of pump required, minor or major deviations from the factory characteristic are permitted. The technical standard, EN ISO 9906:2012 [ 26 ], allows relatively large discrepancies between the operating characteristics of the pumps the catalogue characteristics. Water 2021, 13, x FOR PEER REVIEW 4 of 16 𝐻=𝑝 𝜌·𝑔+𝐻+𝑉 2·𝑔 (1) To test the approach for indirect estimation of pump flow discharge proposed here, the valve at the discharge side of the pump should be fully open. Further, the valve needs to be gradually closed in discrete steps, which changes the values of the flow and subsequently of the pressure. Therefore, for each achieved stationary operating point, the values of the pressure 𝑝 from the manometer should be recorded. Based on Equation (1) and graph in Figure 2, it is possible to estimate the flow rate 𝑄 at the discharge side of the observed pump. The curve in Figure 2 relates the total head 𝐻 and the flow rate 𝑄 and has to be obtained from the manufacturer’s catalogue or preferably from a laboratory test in advance. The possibility of discrepancy between the laboratory characteristics and characteristics from the catalogue is something that exists in reality, especially for an older pump, which has been in service for a long period of time and has been defined by valid technical standards (such as [26]). Depending on the type of pump required, minor or major deviations from the factory characteristic are permitted. The technical standard, EN ISO 9906:2012 [26], allows relatively large discrepancies between the operating characteristics of the pumps the catalogue characteristics. Figure 2. Indirect determination of flow 𝑄 at the measuring point based on the curve, which relates total head 𝐻 and flow 𝑄. Therefore, the corresponding flow 𝑄 can be determined indirectly for each measuring point from the known 𝐻(𝑄) curve, (with satisfactory measurement uncertainty) for each measuring point of the pressure 𝑝 obtained from the manometer, as shown in Figure 2 (recalculated to 𝐻). Figure 2. Indirect determination of flow Qest at the measuring point based on the curve, which relates total head Ht and flow Q. Therefore, the corresponding flow Qest can be determined indirectly for each measuring point from the known H(Q) curve, (with satisfactory measurement uncertainty) for each measuring point of the pressure pdis obtained from the manometer, as shown in Figure 2(recalculated to H). The following simple algorithm, shown in Figure 3, should be used to estimate the flow rate using the proposed approach.
Water 2021,13, 796 5 of 15 Water 2021, 13, x FOR PEER REVIEW 5 of 16 The following simple algorithm, shown in Figure 3, should be used to estimate the flow rate using the proposed approach. Figure 3. A simple algorithm for estimation of discharge flow. 3. A Practical Example The pumping station observed in which the method has been tested has had a long history of questionable measurements of flow due to the complex geometry of the pipeline with an insufficient length of pipe where a flowmeter can be installed. Simplified diagram of the measuring pump station is shown in Figure 4 (the top view). Figure 4. Simplified diagram of the pump station. Due to a serious mistake during the construction process, the main discharge pipeline made of steel DN700 is not in accordance with the original project and has three elbows at short distances. Pumps are submersed in the water tank, which is placed beneath the floor of the pump station. The water level in the tank is held at a constant value. During the modernization of the pump station that has been carried out recently, the old pumps were taken out and replaced with two new submersible pumps (Grundfos SP 270-3A G). Figure 3. A simple algorithm for estimation of discharge flow. 3. A Practical Example The pumping station observed in which the method has been tested has had a long history of questionable measurements of flow due to the complex geometry of the pipeline with an insufficient length of pipe where a flowmeter can be installed. Simplified diagram of the measuring pump station is shown in Figure 4(the top view). Water 2021, 13, x FOR PEER REVIEW 5 of 16 The following simple algorithm, shown in Figure 3, should be used to estimate the flow rate using the proposed approach. Figure 3. A simple algorithm for estimation of discharge flow. 3. A Practical Example The pumping station observed in which the method has been tested has had a long history of questionable measurements of flow due to the complex geometry of the pipeline with an insufficient length of pipe where a flowmeter can be installed. Simplified diagram of the measuring pump station is shown in Figure 4 (the top view). Figure 4. Simplified diagram of the pump station. Due to a serious mistake during the construction process, the main discharge pipeline made of steel DN700 is not in accordance with the original project and has three elbows at short distances. Pumps are submersed in the water tank, which is placed beneath the floor of the pump station. The water level in the tank is held at a constant value. During the modernization of the pump station that has been carried out recently, the old pumps were taken out and replaced with two new submersible pumps (Grundfos SP 270-3A G). Figure 4. Simplified diagram of the pump station. Due to a serious mistake during the construction process, the main discharge pipeline made of steel DN700 is not in accordance with the original project and has three elbows at short distances. Pumps are submersed in the water tank, which is placed beneath the floor of the pump station. The water level in the tank is held at a constant value. During the modernization of the pump station that has been carried out recently, the old pumps were taken out and replaced with two new submersible pumps (Grundfos SP 270-3A G). Before the installation, one of the new pumps, marked as P1 in Figure 4, had been additionally tested by the manufacturer’s laboratory.
Water 2021,13, 796 6 of 15 To verify the accuracy of the simplified approach proposed here in practice, flow measurements in the observed pumping station using flowmeters were performed (in further text Qmes ) and then those measured values were compared to the estimated values (in further text Qest ). Besides, the exact curve of the observed Grundfos SP 270-3A G, which relates total head Ht and flow Q was determined in the manufacturer’s laboratory (the testing of the pump in the manufacturer’s facility is shown in Figure 5, while the results are shown in Table 1). In the specific situation presented in this paper, the real characteristics of the pump recorded in the laboratory differ from those from the manufacturer’s catalogue. Furthermore, sometimes it is not possible to have a stable frequency of 50 Hz, so the actual curve from the laboratory, which relates the total head Ht and the flow Q should be recalculated for the actual conditions in the observed water pumping station [ 27 ]. As we will show in the following case, the operating frequency was set to 49 Hz, to show how to recalculate a curve designed for 50 Hz. Water 2021, 13, x FOR PEER REVIEW 6 of 16 Before the installation, one of the new pumps, marked as P1 in Figure 4, had been additionally tested by the manufacturer’s laboratory. To verify the accuracy of the simplified approach proposed here in practice, flow measurements in the observed pumping station using flowmeters were performed (in further text 𝑄) and then those measured values were compared to the estimated values (in further text 𝑄). Besides, the exact curve of the observed Grundfos SP 270-3A G, which relates total head 𝐻 and flow 𝑄 was determined in the manufacturer’s laboratory (the testing of the pump in the manufacturer’s facility is shown in Figure 5, while the results are shown in Table 1). In the specific situation presented in this paper, the real characteristics of the pump recorded in the laboratory differ from those from the manufacturer’s catalogue. Furthermore, sometimes it is not possible to have a stable frequency of 50 Hz, so the actual curve from the laboratory, which relates the total head 𝐻 and the flow 𝑄 should be recalculated for the actual conditions in the observed water pumping station [27]. As we will show in the following case, the operating frequency was set to 49 Hz, to show how to recalculate a curve designed for 50 Hz. Figure 5. Testing of SP 270-3A G pump in the laboratory. Table 1. Values for the curve that relates total head and flow of the SP 270-3A G pump measured in the laboratory at 50 Hz and recalculated for 49 Hz. 50 Hz 𝑄 [dm3/s] 0 11.67 59.88 75.84 90.08 𝐻 [m] 145.38 138.89 97.47 86.2 71.96 49 Hz 𝑄 [dm3/s] 0 11.44 58.68 74.32 88.28 𝐻 [m] 139.62 133.39 93.61 82.79 69.11 The following equipment was used for the test in the pumping station: 1. A submersible pumping unit Grundfos SP 270-3A G with a rated power of 110 kW, Figure 5. Testing of SP 270-3A G pump in the laboratory. Table 1. Values for the curve that relates total head and flow of the SP 270-3A G pump measured in the laboratory at 50 Hz and recalculated for 49 Hz. 50 Hz Q[dm3/s] 0 11.67 59.88 75.84 90.08 H[m] 145.38 138.89 97.47 86.2 71.96 49 Hz Q[dm3/s] 0 11.44 58.68 74.32 88.28 H[m] 139.62 133.39 93.61 82.79 69.11 The following equipment was used for the test in the pumping station: 1. A submersible pumping unit Grundfos SP 270-3A G with a rated power of 110 kW, 2. The flow was measured using a permanently installed ultrasonic flowmeter Siemens SITRANS F at the main discharge pipeline atthe observed pump station (additionally a portable ultrasonic flowmeter TDSH100 was used),
Water 2021,13, 796 7 of 15 3. The pressure was measured using an IDROSCAN digital manometer which was installed on the discharge side of the pump (additionally, an analogue manometer was installed), 4. The frequency of the power supply tothe drive motor was regulated using a Mitsubishi F740 regulator, and 5. The flow was regulated using the valve installed at the steel discharge pipe DN 200 after the pump P1. All equipment used in our experiments has been properly tested using all common technical norms and standards required for such devices [28]. 3.1. Determination of Substitute Characteristics The purpose of this subsection is to show how the accurate H(Q) curve of the observed Grundfos SP 270-3A G was determined. 3.1.1. Measuring in the Manufacturer’s Laboratory and the Recalculation for the Actual Frequency of Power Supply The measuring in the manufacturer’s laboratory: The actual H(Q) curve of the observed pump SP 270-3A G was determined experimentally in the manufacturer’s laboratory and the results are valid for power supply frequency of 50 Hz (related flows and the pressure obtained in discrete steps, which have been used to construct the curve are given in Table 1). Laboratory tests are expensive, but they are not mandatory and do not represent what the authors suggest in every situation. In certain situations, especially when it comes to pumping units of higher power, the price of such tests may be negligible when compared to the possibilities that the user can get with the help of such tests. The fact is that pump manufacturers usually do not agree to prove the performance of pumping units at the installation sites of such pumps, because they cannot guarantee the accuracy of the measuring equipment in the pumping stations where the observed pumps have been installed. Instead, they prefer testing in an independent or the manufacturer’s laboratory. Also, the characteristics of pump units change during service life. In situations where there are flowmeters installed in pumping stations, it is not complicated to periodically perform measurements at the installation site to check and/or correct the operating characteristics of pumping units. This can usually be done as a part of planned maintenance activities in the pumping stations so that it does not increase running costs. This way, the degree of deterioration of the operating characteristics of the pumping units can be monitored. This is particularly important because their efficiency can be reduced to such an extent that it would be necessary to repair and/or to replace them. The observed pumping station in which the method was tested has had a long history of questionable measuring of flow due to the complex geometry of the pipeline with insufficient length of pipe where a flowmeter could be installed. The installed pumps are old and due to hard exploitation, their characteristics were altered compared to those from the catalogue. Therefore, the old pumps were taken out and replaced with new pumps which have been additionally tested by the manufacturer’s laboratory (testing of the pump in the manufacturer’s facility is shown in Figure 5, while the results are shown in Table 1). Recalculation for the actual frequency of the power supply: For an illustration of the proposed estimation of the flow in general conditions, during the test in the water pumping station where the pump has been installed, the frequency has been set to 49 Hz using a Mitsubishi F740 regulator and consequently, the curve, which relates total head Ht and flow Q for such conditions has been recalculated. The corrected values have been calculated using Equation (2) and are also presented graphically in Figure 6(based on the data points from Table 1). H49 =49 50 2·H50 Q49 =49 50 ·Q50 ), (2)
Water 2021,13, 796 8 of 15 Water 2021, 13, x FOR PEER REVIEW 8 of 16 calculated using Equation (2) and are also presented graphically in Figure 6 (based on the data points from Table 1). 𝐻 =49 50·𝐻 𝑄 =49 50·𝑄 ⎭ ⎬ ⎫ , (2) Statistical calculations in the shown case are based on a limited number of measurement points from Table 1. Although this may be insufficient for a thorough analysis where the number of these points should be increased, for practical analyses, five points can be sufficient especially in cases where more data is not available such as in this case. Figure 6. The experimentally determined curve which relates pressure head and flow of the SP 270-3A G pump recalculated for 49 Hz. 3.1.2. Regression Model and Statistical Analysis To facilitate the use of the data from Table 1, the total head and the flow of the pump SP 270-3A G in our experiment can be presented graphically as given in Figure 6. The corrected graph for 49 Hz is also given in Figure 6, while the related curve based on regression analysis is given in Equation (3). To avoid reading from the curve presented in Figure 6, it is better to use the regression formula as given in Equation (3), which gives the flow as the function of the total head for the observed pump; the data from the laboratory for 50 Hz and recalculated values for 49 Hz are in Table 1. 𝑄 =−0.0018·𝐻−0.8643·𝐻+156.77 (3) The data from the measurement that was used for producing of Equation (3) is given in Table 1. The relation based on the input data of Table 1 was fitted by regression analysis using Statgraphics Centurion, a statistical statistics package that performs and explains, in plain language, both basic and highly advanced statistical functions. We have tried several regression models, and we tested them using Pearson correlation and R-Squared value coefficient of determination [29,30]: Figure 6. The experimentally determined curve which relates pressure head and flow of the SP 270-3A G pump recalculated for 49 Hz. Statistical calculations in the shown case are based on a limited number of measurement points from Table 1. Although this may be insufficient for a thorough analysis where the number of these points should be increased, for practical analyses, five points can be sufficient especially in cases where more data is not available such as in this case. 3.1.2. Regression Model and Statistical Analysis To facilitate the use of the data from Table 1, the total head and the flow of the pump SP 270-3A G in our experiment can be presented graphically as given in Figure 6. The corrected graph for 49 Hz is also given in Figure 6, while the related curve based on regression analysis is given in Equation (3). To avoid reading from the curve presented in Figure 6, it is better to use the regression formula as given in Equation (3), which gives the flow as the function of the total head for the observed pump; the data from the laboratory for 50 Hz and recalculated values for 49 Hz are in Table 1. Qest−49 =−0.0018·H2−0.8643·H+156.77 (3) The data from the measurement that was used for producing of Equation (3) is given in Table 1. The relation based on the input data of Table 1was fitted by regression analysis using Statgraphics Centurion, a statistical statistics package that performs and explains, in plain language, both basic and highly advanced statistical functions. We have tried several regression models, and we tested them using Pearson correlation and R-Squared value coefficient of determination [29,30]: • The coefficient of determination R-Squared value denoted as R 2 equals to 1.0 would indicate a perfect fit, while an R-Squared value of 0.0 would indicate the opposite case; • The Pearson correlation coefficient is a statistic that measures the linear correlation between two variables and has a value between +1 and − 1, where a value of +1 is a total positive linear correlation, 0 is no linear correlation, and − 1 is total negative linear correlation.
Water 2021,13, 796 9 of 15 In our particular case, a linear model is slightly more suitable for the points from Table 1, but we use the squared model because it is more general and suitable for most cases. For example, the linear model Qest−49 = 180.147 − 1.26628 ·Ht , shows the Intercept 180.147 and the Slope − 1.26628 as predictors. These variables are statistically significant because their p-values equal 0.000, which are < 0.05. It also means that there is a statistically significant correlation between Qest−49 and Ht at the 95% confidence level (details of the statistical analysis are given in Table 2). Table 2. Comparison of alternative models obtained by the Statgraphics Centurion software using Pearson correlation and R-Squared value coefficient of determination. Model Correlation R-Squared Linear −0.9991 99.82% Squared-Ht−0.9980 99.60% Squared-Qest−49 reciprocal-Ht0.9978 99.56% Square root-Ht−0.9977 99.53% Logarithmic-Ht−0.9945 98.91% Squared-Qest−49 logarithmic-Ht−0.9920 98.41% Squared-Qest−49 square root-Ht−0.9866 97.34% Reciprocal-Ht0.9822 96.47% Squared-Qest−49 −0.9799 96.03% Square root-Qest−49 squared-Ht−0.9760 95.26% Square root-Qest−49 −0.9663 93.37% Double squared −0.9643 92.98% Double square root −0.9592 92.01% Square root-Qest−49 logarithmic-Ht−0.9504 90.33% Square root-Qest−49 reciprocal-Ht−0.9269 85.92% Besides, it is possible to use the points from Figure 6and Table 1valid for the frequency of power supply of 50 Hz to construct the curve and the related function, while in that case the values of the measured flow and the pressure from the next two subsections where the frequency was 49 Hz, should be recalculated for 50 Hz, see Equation (2). 3.2. Measurement in the Observed Pumping Station The measurements in the observed pumping station were performed for comparison with the estimated values obtained using the shown simplified method. The pressure measurement in this subsection is used as one of the input parameters and is essential for the method of flow estimation described in this technical note. However, flow measurements in this subsection are used only for comparison. The frequency of the power supply during the measurement at the water pumping station was set to 49 Hz. 3.2.1. Pressure Measurement The pressure change, in the section between the pump and the valve for the regulation of flow, was monitored by IDROSCAN digital manometer with measuring range 0–50 bar (with a reading resolution of 0.01 bar and with a declared nonlinearity ± 0.2%). The IDROSCAN digital manometer was placed directly on the discharge side of the pump, together with the analogue manometer (Figure 7). Because of the position of the manometers, some undesirable variation of flow can occur which can introduce a certain error of pressure measurement due to incompletely stabilized flow. However, both manometers showed the identical values of the measured pressure. It should be mentioned that due to the specific placement of the manometer (it is mounted in a special socket on the elbow of the discharge pipeline, exactly above the pump), the water velocity at the point of measuring is locally considered to be Vdis ≈ 0 [m/s]. Thus, the measured pressure is somewhat higher than the real static pressure and includes the dynamic pressure. Due to the height difference between the position of the manometer and the water level in the tank during our experiment, correction Hg = 1.6 m (related to Figure 1) is introduced into Equation (1).