A new composite heuristic to minimize the total tardiness for the single machine scheduling problem with variable and flexible maintenance
Inspired by a real-world maintenance/job scheduling issue coming from the semiconductor industry, the present paper proposes a new heuristic algorithm structure for the single machine scheduling T-problem with flexible and variable maintenance, job release dates and sequence…
DOI: 10.1016/j.cor.2024.106849