scieee AI-readable full text Open interactive document viewer

Case study comparison of maintenance approaches in three Nigerian theatres: Lessons for future design

Tuleun, Evelyn Memshima; Oluigbo, Stephen Nwabunwanne

Abstract

Performing arts theatres are vital public facilities that represent cultural identity and architectural expression. In Nigeria, however, many of such structures have sunk into neglect, especially due to poor maintenance strategies originating from oversights at the design stage. In this study, we present a comparative case analysis of three Nigerian theatres; the National Theatre Lagos, the Oba Akenzua Cultural Centre Benin, and the Aminu Isa Kontagora Theatre Makurdi, focusing on the interrelationship between decisions made at the architectural design stage and subsequent long-term maintenance outcomes. Via structured interviews, check list examinations and visual surveys, data were retrieved for variables concerning site planning, material used, spatial organization, roofing systems and accessibility.The findings indicate persistent design-related issues such as poor detailing; insufficient drainage systems; incorrect material specification; and/or inaccessibility for routine maintenance. Although the National Theatre Lagos is distressed by widespread surface weathering and complex inaccessible shapes, the Oba Akenzua Centre has better organized exterior whilst the drain and weathering issue still become a problem. Modest as it was, however, the Aminu Isa Kontagora Theatre is a poster child for adversities of critical neglect and accelerated physical decay due to lack of attention to maintainability. According to the study, maintenance-conscious designs, ranging from simple building forms, workable service areas, dataset material selection, and proper site drainage embedded in the design process can drastically limit long-term maintenance loads. The insights provide a framework for upcoming theatre design in Nigeria: through its buildings, the role of architectural decisions in ensuring sustainable building performance cannot be overemphasised.

Full text

 Corresponding author: Evelyn Memshima Tuleun Copyright © 2025 Author(s) retain the copyright of this article. This article is published under the terms of the Creative Commons Attribution Liscense 4.0. Case study comparison of maintenance approaches in three Nigerian theatres: Lessons for future design Evelyn Memshima Tuleun 1, * and Stephen Nwabunwanne Oluigbo 2 1 Department of Physical Planning, Joseph Sarwuan Tarka University, Makurdi, Nigeria. 2 Department of Architecture, Ahmadu Bello University, Zaria, Nigeria. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 Publication history: Received on 14 June 2025; revised on 26 July 2025; accepted on 29 July 2025 Article DOI: https://doi.org/10.30574/wjarr.2025.27.1.2770 Abstract Performing arts theatres are vital public facilities that represent cultural identity and architectural expression. In Nigeria, however, many of such structures have sunk into neglect, especially due to poor maintenance strategies originating from oversights at the design stage. In this study, we present a comparative case analysis of three Nigerian theatres; the National Theatre Lagos, the Oba Akenzua Cultural Centre Benin, and the Aminu Isa Kontagora Theatre Makurdi, focusing on the interrelationship between decisions made at the architectural design stage and subsequent long-term maintenance outcomes. Via structured interviews, check list examinations and visual surveys, data were retrieved for variables concerning site planning, material used, spatial organization, roofing systems and accessibility. The findings indicate persistent design-related issues such as poor detailing; insufficient drainage systems; incorrect material specification; and/or inaccessibility for routine maintenance. Although the National Theatre Lagos is distressed by widespread surface weathering and complex inaccessible shapes, the Oba Akenzua Centre has better organized exterior whilst the drain and weathering issue still become a problem. Modest as it was, however, the Aminu Isa Kontagora Theatre is a poster child for adversities of critical neglect and accelerated physical decay due to lack of attention to maintainability. According to the study, maintenance-conscious designs, ranging from simple building forms, workable service areas, dataset material selection, and proper site drainage embedded in the design process can drastically limit long-term maintenance loads. The insights provide a framework for upcoming theatre design in Nigeria: through its buildings, the role of architectural decisions in ensuring sustainable building performance cannot be overemphasised. Keywords: Building Maintenance; Public Theatres; Design Decisions; Maintainability; Case Studies; Climatic Response. 1. Introduction Theatres also serve as cultural and architectural icons that embody and showcase the artistic expression and cultural heritage of a society. In Nigeria, these structures sometimes imbued with a striking, symbolic aesthetic double as performance settings and tourism products. Now the National Theatre Lagos, Oba Akenzua Centre Benin, and Aminu Isa Kontagora Theatre Makurdi among others are in a state of significant disrepair and are thus counterproductive to their intended purpose and symbolic status [1,2]. This phenomenon of widespread degradation is also primarily attributed to maintenance practices, as well as design-related inadequacies and lack of proactive maintenance strategies, which only serve to compound the issue [3,4]. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2746 Previous studies on building maintenance in Nigeria have focused on cost-saving strategies and management practices [5]. These methods are good but generally fail to address the underlying causes of maintenance problems that tend to come from the design decisions taken during the conceptual and architectural stages [6,7]. According to [8], the design process is vital to the long-term performance and maintenance requirements of a building; material selection, construction techniques, and spatial configurations all affect a building's workflow and function. Thus, architects do have a pivotal function in the reduction of future maintenance loads through design that integrates durability, accessibility, and environmental responsiveness [9,10]. Maintenance issues such as poor detailing, incorrect material specification, and inaccessibility of structural components have often been linked to inadequate planning during the design stage [11,12]. Given the complex nature and substantial scale of theatre buildings, poor detailing can lead to significant maintenance challenges [13]. Furthermore, defects like spatial dead zones, inadequate drainage, and insufficient ventilation commonly affect user comfort and accelerate structural deterioration [14,15,16]. The case study theatres in this paper, the National Theatre Lagos, Oba Akenzua Cultural Centre Benin, and Aminu Isa Kontagora Theatre Makurdi, embody a variety of scales and maintenance contexts across Nigeria. By comparing the maintenance outcomes of these buildings, the research aims to reveal the extent to which architectural design has impacted on operational performance and to identify lessons for the impact on the planning and design of future theatres. The study proposes that for the various aspects of maintenance to be assessed, we need to conduct visual surveys, structured interviews and review of checklists, enabling an understanding of how form, materiality, site planning and functionality intersect to inform maintenance outcomes. This comparison, in the end, is meant to validate the common knowledge, however wrongly it is often perceived, that design is more than aesthetics, but a process that dictates the performance and cost of the building in the long run [17]. The results will direct architects, engineers and policymakers towards a way to reduce lifecycle costs by considering maintainability in the architectural design of public theatres from the start. 2. Literature Review 2.1. The Concept of Building Maintenance Building maintenance is an important activity in the building life cycle that focuses on improving, preserving or restoring the functionality of buildings and their appearance. According to [18] building maintenance is defined as the effort carried out to preserve the usefulness and worth of a building for its users, tenants and owners. According to [19], maintenance refers to the technical and administrative activities which are designed to enable a building to continue to perform its functions, or to restore it to an adequate condition. There are two broad categories of maintenance, referred to as planned maintenance and unplanned maintenance (BS 3811, 1984). Planned maintenance comprises preventive (time-based or condition-based) and corrective actions, whilst unplanned maintenance relates to emergency repairs which were not previously scheduled [20]. This preventive approach can help ease long term costs and keep the essence of the building intact, driving the need for a proactive estate management plan from the earliest opportunity. [21] posits that in order to maintain finishes or structural components or other installations, one must first understand the facility. Timely interventions planned out and executed in a structured manner with quality workmanship greatly prolong the life and performance of buildings. 2.2. Architectural Design and Maintenance Correlation Decisions about design made in the planning process are key to a building’s maintainability. According to [22], design quality defines post-occupancy performance, which consists of factors that may affect the quantity and quality of maintenance issues in the building. Unfortunately, the critical relationship between design and maintainability is often under-estimated, resulting in buildings that are smart and highly priced but have appalling maintainability characteristics [7,23]. Maintenance obligations are determined by key architectural topics, from building form to detailing and material selection and spatial organization to roof design. More sophisticated forms, for example, might elevate aesthetics but hinder access and reparability [24,25]. Similarly, not providing access routes to allow for maintenance, e.g. catwalks in theatres or accessible roofing systems, means that stages are simply neglected [15,26]. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2747 Clear evidence for these arguments lies in the case study salient findings from the National Theatre Lagos, Oba Akenzua Centre Benin and Aminu Isa Kontagora Theatre Makurdi. The state of disrepair of each theatre varied as a result of design flaws such as inadequate drainage, inaccessible roofing, and partial incorrect material specifications, demonstrating that designing is related to maintenance in the long term, and that architectural choices made initially must be preserved over time. 2.3. Maintenance Challenges in Nigerian Theatres Despite being iconic expressions of both culture and architecture in Nigeria, theatres have suffered from neglect, functional decay and increasing maintenance costs over the years. Due to systemic lapses in maintenance, as pointed by [2] most of these buildings are in decline, [3] ascribed the decline to negligence and indifference, as well as the absence of sustainable maintenance plans, a sentiment also expressed by [4] and Art and Culture (2012) in connection with the National Theatre Lagos. Factors contributing to maintenance issues include: • Complex Architectural Forms: Aesthetic ambitions lead to intricate designs with minimal consideration for access or long-term upkeep [13]. • Improper Material Specification: Incompatible materials with local environmental conditions deteriorate rapidly [27]. • Poor Detailing: Incomplete or unclear design documentation causes misinterpretation during construction and eventual defects [15]. • Inaccessible Design Features: Roofs, façades, and utility systems often lack provision for safe maintenance [28]. • Environmental Factors: Harsh weather, poor ventilation, and pollution accelerate material degradation [29,30]. The case studies reveal that the National Theatre Lagos suffers from ponding due to poor drainage, the Oba Akenzua Theatre faces façade and roof damage, and the Aminu Isa Kontagora Theatre shows widespread interior and structural deterioration. These findings reinforce the need for maintenance-aware design approaches tailored to Nigeria’s unique climatic, economic, and cultural conditions. 2.4. Theoretical Framework: Design for Maintainability The research is grounded in a theoretical framework based on Design for Maintainability (DfM), an approach in which design for maintainability is vividly considered from the beginning of the conceptualization phase. DfM promotes user accessibility, material durability, responsiveness to environment, and the ability to be adapted for future needs [9,10]. The proposed framework is modelled on Syce [5] and [14] studies and promotes such maintenance-optimal design solutions that favour modular systems, flexible components, and clear detailing. According to [28], the relationship between design and maintenance is inverse: as the quality of the design increases, the demand for maintenance decreases. 3. Methodology This study adopted a qualitative comparative case study approach to analyze maintenance challenges and practices in three prominent Nigerian theatres: the National Theatre Lagos, the Oba Akenzua Centre Benin, and the Aminu Isa Kontagora Theatre Makurdi. The aim was to draw lessons from their maintenance conditions to inform future design strategies that can mitigate maintenance burdens from the conceptual phase. The research was exploratory and comparative in nature, focusing on the relationship between architectural design decisions and resulting maintenance outcomes. Data was collected through a combination of field surveys, structured interviews, and checklist-based assessments. The study utilized purposive sampling to select case study sites and informants due to their significance, accessibility, and relevance to the research objectives. 3.1. Case Study Selection Criteria The selection of case studies followed purposive sampling based on the following criteria: • Functionality: All selected buildings function as performing art theatres. • Ownership: All are publicly owned and serve state or national functions. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2748 • Geographic Representation: Selected from different geopolitical zones in Nigeria (South-West, South-South, and North-Central) to capture a range of climatic, cultural, and usage conditions. • Architectural Significance: Each building holds symbolic architectural and cultural relevance in their respective regions. These criteria ensured that the theatres studied were comparable in purpose while allowing for variations in design and context that might influence maintenance dynamics. 3.2. Data Collection Methods To gain a comprehensive understanding of the maintenance issues and their links to architectural design, a triangulated data collection approach was employed. This included: 3.2.1. Visual Survey Field observations were conducted to document physical deterioration, structural inefficiencies, and visible defects. Particular attention was given to areas such as roofing systems, façade treatments, material degradation, and circulation spaces. Photographs supported these observations. 3.2.2. Checklist Assessment A structured checklist was developed to evaluate key building elements with respect to maintenance. The checklist covered: • Site planning and landscaping • Spatial organization • Structure and materials • Building aesthetics • Accessibility for maintenance This tool provided a standardized basis for comparison across the three case studies, ensuring consistency and objectivity in evaluating maintenance-related design features. 3.2.3. Structured Interviews Interviews were conducted with facility managers, technical staff, and maintenance personnel at each theatre. The interview schedule focused on: • Types and frequency of maintenance interventions • Challenges encountered in executing maintenance • Suggestions for design improvements to minimize maintenance burden • This provided experiential insight that complemented the physical assessments. 3.3. Data Analysis Procedures Analysed thematically, the data obtained were recategorized based on their similarities and to establish correlations between design choices and operational performance. Comparative analysis was used to synthesize the visual and checklist data, whilst content analysis was used to analyse and group interview responses into emergent themes. Crosscase synthesis was performed to compare and contrast the three theatres and to facilitate generalizable conclusions. Triangulation of findings allowed for the cross-checking of outcomes from observational, documentary, and interview data during the analysis process, which contributed to the robustness of our conclusions. These recommendations were phrased in terms relevant to architects such as material specification, spatial layout, construction methods, and environmental adaptability. 3.4. Case Study Analysis An investigation to study the management of theatres is imperative because across Nigeria these structures have become neglected. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2749 3.4.1. National Theatre, Lagos The National Theatre Lagos, once a classic piece of architecture, is reported to be a “symbol of decay and decadence” owing to “persistent neglect” [31]. Many of these problems have been attributed to returning to the drawing board, bad architectural/structural design, unsuitable selection of materials and difficulty in construction have been incurring charges on maintenance and depreciation in the years to come [8,5,9,10]. This section discusses the National theatre of Lagos extensively with respect to its design and maintenance results. Site Planning and Landscaping Extensive hard and soft landscaping elements were part of the National Theatre’s site planning. In a variety of access zones, compact concrete pavements and interlocking tiles were used for these parts, which marked their sustainability and minimized the need for frequent surface maintenance. However, the site displayed poor drainage as shown in Figure 1, which led to ponding, particularly after rain, contributing to the degradation of paved surfaces and increasing the cost of landscape maintenance. Figure 1 Poor drainage resulting in the separation and disjoint of access route Lawns and ornamental trees, landscaping elements, have been poorly maintained. High maintenance was attributed to the lack of simplified, low maintenance landscape design approaches such as use of gravel or limited vegetation. In addition, pedestrian routes were not always properly defined, resulting in zones of random usage and a higher degree of wear. Spatial Organization and Access The theatre adopts a radial plan consisting of a central performance zone, around which the various support spaces radiate. Although the major entrance and circulation cores were well-formed, the internal plan has several functional “dead zones”, small and poorly defined spaces that encourage neglect and probably vandalism [Figure 2]. Figure 2 Poor state of maintenance within dead zones at the National Art Theatre, Lagos. [Source: Author’s survey, 2014] World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2750 The separation of functional areas leads to limited physical and visual continuity. For example, service routes do not lead directly to mechanical and roofing components, making it difficult to perform maintenance operations. Simply accessing high ceilings and facade surfaces introduces significant routine maintenance challenges, corroborating Ramly's (2007) findings that inadequate accessibility design introduces costs for increased maintenance. Structural Design and Material Usage The National Theatre is a brutalist concrete structure best known for its floating curved roof and monolithic appearance. The materials are precast concrete panels, marble floor finishes, and wooden decorative elements. The use of concrete is, no doubt, a durable option; however, many joints are affected by water infiltration resulting from poor detailing and flat roof design, causing wear to structures and degradation of ceilings (Figure 3). Figure 3 Covering of roof felts with damp proof membrane due to high rate of leakages Ideally the roof was a high-pitch slope that would drain better [30], but instead the roof includes flat with complex profiles that collect water, causing leaks and damage. Ceiling boards and exterior paints, for example, have had to be replaced more than once owing to flaking and decay as indicated in Figure 4, which suggests either poor initial selection of materials or an environmental incompatibility. This is indicative of [27] and [32] worries on material properties not being aligned with the demands of the environment. Figure 4 Replacement of ceiling materials as a result of degradations Finally, there is no modular or flexible construction component such as bolted steel assemblies, so that repair and replacement are invasive and expensive. Key Maintenance Challenges The key challenges facing the National Theatre stem from a combination of design oversights and environmental exposure. They include: Inadequate drainage around the building and on the roof, leading to water accumulation and structural damage [Figure 5]. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2751 Figure 5 The deterioration of exterior walling material Poor accessibility to high or concealed areas for maintenance, including roof and ceiling systems. Material failures due to environmental exposure, such as sun-induced fading, rain damage, and corrosion, particularly affecting ceiling boards, external wall paint, and wooden decoration [Figure 6]. Figure 6 Damaged suspended ceiling rails with visible rust Neglect of non-utilised zones, which become dumping grounds or decay hotspots [Figure 6]. Figure 7 Poor state of maintenance within dead zones Complex roof forms that hinder maintenance and promote leakage. In summary, while the National Theatre was conceived as a symbolic structure, inadequate attention to maintainability during design has led to significant operational and financial challenges. Future designs must prioritize accessible detailing, durable and context-appropriate materials, simplified landscape strategies, and functional zoning to reduce such burdens. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2752 3.4.2. Oba Akenzua Cultural Centre, Benin Benin’s Oba Akenzua Cultural Centre is a girding cultural and artistic base in southern Nigeria. This analysis assesses the maintenance challenges and architectural effectiveness of the centre as part of a comparative case study with the National Theatre Lagos and Aminu Isa Kontagora Theatre Makurdi. Demonstrating the implication of sound in adequate integration with the environment for reduced maintenance across architectural history [1,2,4,5]. Architectural Characteristics The Oba Akenzua Cultural Centre was designed with relatively serviceable architecture; detailing of open ceilings and cantilevered facades to avoid direct solar gains (Figure 8). The spatial organization is simple, with a clear separation between service and performance areas. Yet, aspects of the centre, particularly façades and rooflines, are vulnerable to the weather, suggesting failings in climatic responsiveness, despite façade cantilevers. Figure 8 Display of some of the building materials used Unlike the National Theatre Lagos, which to some extent plays monuments in the identity formation stake as well need a headquarters, this centre dispenses a mutilated utilitarianism that, although cheaper to erect, establishes limited aesthetic value as it is devoid of cultural affinity. 3.4.3. Material Specifications and Façade Durability Oba Akenzua Cultural Centre uses standard concrete block walls, basic aluminium roofing, and minimal interior/exterior finishes. However, distress of these materials has been detected, most prominently on the outer walls and roofing elements (Figure 9). Material specification is a very crucial aspect of the maintenance profile of public buildings [27]. In this instance, the walling materials seem vulnerable to environmental degradation, suggesting a misalignment between material properties and climatic conditions in Benin. Surface flaking and discoloration has occurred, consistent with [29] on UV-related degradation and with [33] on the effects of atmospheric pollution, due to exposure to intense solar radiation and moisture. Cantilevered facades can be employed to attempt at periphery some of these effects, but the durability of the material envelope as a whole is not tight enough to ensure long-term performance in a high-humidity environment. Drainage and Roofing Conditions The Oba Akenzua Centre has faced major obstacles in drainage and roof design. Even though drainage pipes can be found at various sites, roof leakages are still significant [Figure 9], which indicates that detailing might be improper, or slope design was not sufficient, as pointed out by [3]. They avoided complex roof geometry, but even the simplified roofscape still didn’t encourage effective shedding of water. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2753 Figure 9 Deterioration of walling material These shortcomings indeed confirm the doubts mentioned by [15,28] stressing the importance of proper architectural detailing particularly roof-water discharge. Rainwater accumulation and intrusion are also strong indicators of inadequate pitch gradients or inadequate drainage. 3.4.4. Aminu Isa Kontagora Theatre, Makurdi General Design and Usage Makurdi's Aminu Isa Kontagora Theatre is a multipurpose cultural center primarily housing theatrical performances, civic events, and educational or governmental functions dotingly. The spatial plan is rather modest compared to other national theatres, illustrating its regional character. The theatre consists of a central performance area that opens out into a tiered concrete seating, as well as multi-purpose rooms that include dressing rooms and administration offices. Combining the local climatic factors, its open-air amphitheatre design has partial roofing in some parts, mostly around the stage and central entrance, in order to partially shield from direct sun rays and rain. The building maintains a simple design language and aesthetic focusing on the function. Types of materials noted included cement for walls and floors, aluminium roofing sheets, timber framing in some sections. Architectural motifs of the local neighbourhood are found in subtle detailing and in the layout and plan of the small theatre, despite its simple form Areas of Deterioration The theatre has likely experienced significant wear-and-tear over its many structural and aesthetic elements. A major concern observed is the flaking and peeling of paints on walls, especially around areas that were previously persistently leaked bout due to entry of moisture and poor waterproofing detailing as shown in Figure 10. World Journal of Advanced Research and Reviews, 2025, 27(01), 2745-2760 2760 [29] Andrady, A.L., Hamid, S. H., Hu, X. & Torikai, A. (2011). Effects of Solar UV and Climate Change on Materials. Journal of photochemistry and photobiology, 10(2): 292-300, doi: 10.1039/cOpp90038a. [30] Heath, R., Worthing, D. & Marshall, D. (2nd Ed) (2003). Understanding Housing Defects. Britain. Bell & Bain Limited. [31] Haruna, G. (2009, April 27). Nigeria: Bringing back the culture of maintenance. This Day. [32] Appleton, I. (2nd Ed) (2008). Buildings for the Performing Arts. A Design and Development Guide. United Kingdom. Elsevier Limited Publisher. [33] Butlin, R.N. (2011). Monitoring and Modelling the Deterioration of Historic Structures. In: Watt, D. (ed.) Building Pathology: Principles and Practice. 2nd ed. Wiley-Blackwell. [34] Kubba, Sam A. A. (2008). Architectural Forensics. McGraw-Hill Professional. 456 pp. [35] Liska, R. (1988) Means Facilities Maintenance Standards. R. S. Means Company Inc Lyons, A. (2007). Materials for Architects and Builders. Oxford, United Kingdom: Elsevier. [36] Ayakoroma, B. F. (2012, August 2). Revisiting status of the National Theatre Complex. Bivnze’s Space (Blog). Available at https://bivnze.wordpress.com/2012/08/02/revisiting-status-of-the-national-theatre-complex/ [37] Sani, A. S., AH, H. M. & Shahidan, S. E. (2012). A Review of the Effect of Building Design on Maintenance Management. Proceedings of ICBER'12: International conference on business and economic research, Indonesia. Pp 648-662. [38] Al-Hammad, A., Assaf, S. & Al-Shihah, M . (1997). The effect of faulty design on building maintenance. Journal of Quality in Maintenance Engineering, 3(1): 29-39.