Corresponding author: Sundus Alfaitouri Copyright © 2025 Author(s) retain the copyright of this article. This article is published under the terms of the Creative Commons Attribution Liscense 4.0. Comparative Analysis of Heuristic Rules for Flow Shop Scheduling Using ANOVA Sundus Alfaitouri Department of Industrial and Manufacturing System Engineering, Faculty of Engineering, University of Benghazi, Benghazi, Libya. World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 Publication history: Received on 18 July 2025; revised on 26 August 2025; accepted on 28 August 2025 Article DOI: https://doi.org/10.30574/wjarr.2025.27.2.3048 Abstract This paper compares the performance of five heuristic rules with the objective of minimizing the makespan time. The selected heuristics are namely SAI, Palmer, Gupta, RA and CDS. The heuristics are tested on twelve flow shop problems of different sizes using a MATLAB program. The comparison was made by using the Analysis of Variance (ANOVA) under Completely Randomized Block Design (CRBD), where the problem size was considered as a blocking factor and the heuristic rule as the main factor. Makespan time was used as the response variable, with a significance level of α = 0.05. The findings indicated significant differences between the CDS, SAI, and Palmer heuristics, as the mean makespan achieved by the CDS heuristic is lower than that of the SAI and Palmer heuristics, while its performance was not significantly different from that of RA and Gupta. Keywords: Flow shop scheduling; Heuristics; Makespan; ANOVA 1. Introduction Production Scheduling is a fundamental decision-making process in manufacturing and operations management. It involves allocating available resources (machines, workers, materials) over time to perform a collection of tasks (jobs, operations) to optimize one or more objectives while satisfying constraints [ .1 ] Scheduling problems are characterized by machine layouts: single machine, identical parallel machines, flow shops and job shops [.2 ] Flow Shop Scheduling (FSS) represents one of the most important and widely studied machine environments within production scheduling. It models production systems where a set of n jobs must be processed sequentially on a set of m machines (or stages) in the same technological order [ .3 ] Generally, there are two classes of methods for solving flow shop scheduling problem (FSSP); exact and heuristic methods. The first-class methods include: integer programming, dynamic programming, branch and bound, etc. Another class is called heuristic algorithms such as Gupta, Palmer, CDS, RA, SAI, etc. Although those methods do not guarantee the finding of an optimal solution, those have been reported useful in solving many challenging optimization problems within a reasonable computational time. The main objective of FSSP is to determine the best machine schedule to do all job with the best objective value, i.e., minimizing makespan (Cmax), mean flow time, mean tardiness, earliness, maximum lateness, etc. For solving FSSP with the objective of minimizing makespan, several researchers have reported the robustness of heuristic methods. These include Gupta and Ali [4], Gupta and Chauhan [5], Syarif et. al. [3], Sule [6], Dannenbring [7],
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2085 Nawaz et al. [8], Gupta [9] and so on. Despite these interests, however, no researcher said the best method to solve FSSP all-time optimally. This fact shows that researches on the performance evaluation of the heuristic rules for FSSP are very crucial. Previous research has consistently compared heuristic performance for flow shop scheduling. For instance, Hossain S. et al. [10] applied the Palmer, CDS, and NEH heuristics to a 4-job and 10-machine problem aimed at makespan minimization. Interestingly, all three methods yielded identical results for this specific instance. In a more targeted comparison of small-scale problems (5 jobs, 5 machines), Rayhan and Chakma [11] found that the NEH heuristic outperformed both Palmer's and CDS's methods by a margin of 3–5%. Scaling up the analysis, Gupta & Chauhan [5] developed a weightage-based heuristic tested on large-scale Taillard benchmarks (up to 500 jobs). Their approach reduced the average makespan gap to best-known solutions by 8%, demonstrating superior performance over the Palmer, CDS, and RA heuristics. While these studies provide valuable pairwise comparisons, a significant gap remains in the application of robust statistical methods for multi-heuristic evaluation. This paper is motivated by the notable absence of Analysis of Variance (ANOVA) in this context. ANOVA offers a critical advantage: it efficiently manages comparisons across multiple heuristics while accounting for the inherent variability introduced by different problem instances. This methodology controls statistical error rates and, when combined with post-hoc tests, provides a rigorous foundation for identifying truly superior algorithms. We argue that this leads to more reliable, objective, and insightful conclusions on algorithmic performance, which are essential for both advancing research and guiding practical implementation. 1.1. Problem Statement The assumptions regarding FSSP in this study are general and common in nature. The same are adapted from Baker [12], Ruiz and Maroto [13] and others. • Each job i can be processed at most on one machine j at the same time. • Each machine m can process only one job i at a time. • No preemption is allowed, i.e. the processing of a job i on a machine j cannot be interrupted. • All jobs are independent and are available for processing at time 0. • The set-up times of the jobs on machines are already included within the processing times. • The machines are continuously available. • In-process inventory is allowed. If the next machine on the sequence needed by a job is not available, the job can wait and joins the queue at that machine. • All machines process jobs in the same order (permutation flow shops). 2. Heuristic Rules for FSSP In this section, the selected heuristic algorithms for solving flow shop scheduling problem are presented. 2.1. SAI Heuristic SAI method is used to frame a sequence of jobs for processing the n-jobs on m-machines in such a way that the total elapsed time is minimized. The steps of this method, as stated by Gupta and Ali [4], are as follow: • Step 1: Examine the jobs and select the least job processing time among all n jobs for each machine and then marked it with (−) sign • Step 2: Similarly, select the least processing time among all m machines for each job and then marked it with (+) sign . • Step 3: Again, examine the rows and columns of table, select the cell with (∓) sign and is placed in the optimal job sequence . • Step 4: Step 1 to 3 are repeated until all the jobs are placed in the optimal job sequence . There may be a situation where a tie has occurred : • If (∓) occurs at more than one place, then the job with least processing time is selected and is placed in the optimal job sequence .
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2086 • If (∓) occurs at more than one place and the processing time for the allocated jobs is same. Then the job which will process on the lower order positional machine is selected that is by ignoring the other higher order of machines . Step 5: Lastly, we calculate the ideal time and total elapsed time of machines. 2.2. Palmer’s Heuristic To minimize the makespan in static flow shop, palmer has developed a heuristic which is known as the Palmer’s Heuristic. This heuristic rule sometimes gives optimal solution (Makespan) but not guarantee to give optimal solution for all the time. Palmer has developed a concept of slope to compute the optimum makespan and job sequence in flow shop. Based on this slope (Aj), this heuristic can evaluate only one optimal sequence of job. Palmer heuristics comprises two following steps (Syarif et. al. [3]): Step1: If the number of jobs is n and machine is m, then the slope Aj for jth job is computed as follows; 𝐴𝑗=∑{𝑚−(2𝑖−1)}𝑃𝑖𝑗 𝑚 𝑖=1 Where, 𝑃𝑖𝑗 denotes the processing time of the job. Step 2: Jobs are arranged in the sequence according to their descending (decreasing) order of slope Aj value. 2.3. CDS Heuristic The method generates m - 1 sequences, one for each value of I, where i = 1,2,...m-1. from which the best is chosen. The sequence number 1 is constructed by solving a two-machine problem using Johnson's rule where the two pseudo factors Ail and Bil are generated using the following expressions (Sule [6]): 𝐴𝑖𝑙 =∑𝑃𝑖.𝑗 𝑙 𝑗=1 , 𝐵𝑖𝑙 =∑𝑃𝑖,𝑚−𝑗+1 𝑙 𝑗=1 𝐴𝑖𝑙: The sum of processing times for job 𝑖 on machines from 1 to j. 𝑃𝑖.𝑗 : is the processing time of job 𝑖 on machine j. 𝐵𝑖𝑙: The sum of processing times for job 𝑖 on machines from 𝑚 down to 𝑚 – j +1. 𝑃𝑖,𝑚−𝑗+1 ∶ is the processing time of job 𝑖 on machine 𝑚 – j +1 counted in reverse order. The steps of Johnson's rule are described as following (Johnson [14]): Step 1: First of all, the different processing times for all different jobs are assigned to both machines. Step 2: The least/smallest processing times of each job from all the jobs is noticed and if the minimum processing time of the particular job is on machine 1, then the job is put into the first sequence otherwise if the minimum processing time is on machine 2, then it is put into the last place of the sequence. Step 3: The selected job is then removed from the sequence. Step 4: Then again, the minimum processing time of any job from the list of jobs is detected and if the least processing time is on machine 1, and then it is put accordingly in the second position if the previous job is in fist position or in the first position if the previous job is in last position. While if the least processing Ume is on machine 2, then it is put accordingly in the last position if the previous Job is in the first position otherwise in the second last position. Step 5: Accordingly, all the jobs are sequenced in the above-mentioned procedure.
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2087 2.4. Gupta’s Heuristic Gupta thought a transitive job ordering in the form of follows that would produce good schedules (Gupta [9]). Where m > 3, arrange the jobs in descending order of the Sj. Where: tjm is the processing time of job j on machine m. 2.5. Rapid Access (RA) Heuristic The Rapid Access Procedure (RA), as presented by Dannenbring [7], uses a weighting scheme similar to that for the Slope Order and Campbell, Dudek and Smith methods. A single, two-machine subproblem is formed where the processing times are determined from the weighting scheme, and the subproblem is solved using Johnson’s twomachine algorithm. The weighting scheme chosen was selected for its simplicity. Where 𝑡𝑖𝑗 is the processing time for the 𝑖𝑡ℎ job on the 𝑗𝑡ℎ machine in the main problem, and 𝑝𝑖𝑗 is the subproblem processing time for the 𝑖𝑡ℎ job on the 𝑗𝑡ℎ machine (𝑖 = 1, 2, ..., n and j = 1, 2). 𝑃𝑖1 =∑(𝑚−𝑗+1)𝑡𝑖𝑗′ 𝑝𝑖2 = ∑(𝑗)𝑡𝑖𝑗 𝑚 𝑗=1 𝑚 𝑗=1 . Step 1: Calculate U = { i│Pi1’ < Pi2’ } and V = { i│Pi1’ ≥ Pi2’ } Step 2: Sort jobs in U with ascending order of Pil’. Step 3: Sort jobs in V with descending order of Pil’. Step 4: Optimal sequence is obtained as schedule S by U and V. S={U,V} 3. Results 3.1. Computational Results To evaluate and compare the performance of heuristic rules, twelve FSSP (from table1 to table 12), were solved by using five heuristics namely SAI, Palmer, Gupta, RA and CDS. Table 13 summarizes the results by presenting the makespan (Cmax) for each problem by using the selected heuristic rules. Table 1 Problem 1 (3jobs and 3machines) MC/Jobs 1 2 3 M1 4 3 6 M2 6 7 2 M3 2 1 5
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2088 Table 2 Problem 2 (4jobs and 3machines) MC/ Jobs 1 2 3 4 M1 6 8 3 4 M2 5 1 5 4 M3 4 4 4 2 Table 3 Problem 3 (5jobs and 3machines) MC/Jobs 1 2 3 4 5 M1 3 8 7 5 2 M2 3 4 2 1 5 M3 5 8 10 7 6 Table 4 Problem 4 (3jobs and 4machines) MC / Jobs 1 2 3 M1 20 19 20 M2 20 19 20 M3 5 1 5 M4 5 2 5 Table 5 Problem 5 (4jobs and 4machines) MC / Jobs 1 2 3 4 M1 20 17 21 25 M2 10 7 8 5 M3 9 15 10 9 M4 20 17 21 25 Table 6 Problem 6 (5jobs and 4machines) MC / Jobs 1 2 3 4 5 M1 7 11 2 14 18 M2 15 18 13 4 11 M3 14 18 11 27 32 M4 21 6 16 14 16 Table 7 Problem 7 (3jobs and 5machines) MC/Job 1 2 3 M1 6 5 4 M2 4 5 3 M3 1 3 4
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2089 M4 2 4 5 M5 8 9 7 Table 8 Problem 8 (4jobs and 5machines) MC/Job 1 2 3 4 M1 6 5 4 7 M2 4 5 3 2 M3 1 3 4 2 M4 2 4 5 1 M5 8 9 7 5 Table 9 Problem 9 (5jobs and 5machines) MC/Job 1 2 3 4 5 M1 5 9 9 4 3 M2 9 3 4 8 5 M3 8 10 5 8 6 M4 10 1 8 7 3 M5 1 8 6 2 7 Table 10 Problem 10 (4jobs and 6machines) MC/Job 1 2 3 4 M1 15 17 21 18 M2 8 7 7 6 M3 6 9 12 11 M4 14 10 9 12 M5 6 15 11 14 M6 26 22 19 17 Table 11 Problem 11 (5jobs and 6machines) MC/Job 1 2 3 4 5 M1 1 5 5 1 1 M2 5 75 75 5 5 M3 5 1 5 5 5 M4 5 1 5 5 5 M5 1 5 2 1 1 M6 2 3 3 1 1
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2090 Table 12 Problem 12 (6jobs and 6machines) MC/ Job 1 2 3 4 5 6 M1 12 25 10 15 20 18 M2 18 10 20 12 15 22 M3 22 14 25 30 10 12 M4 15 30 12 20 25 10 M5 20 12 18 10 15 25 M6 10 18 15 25 12 20 Table 13 Comparative results of the makespan. Problem size (n*m) Algorithm 3*3 4*3 5*3 3*4 4*4 5*4 3*5 4*5 5*5 4*6 5*6 6*6 SAI 23 30 42 89 122 133 38 45 65 134 181 213 Palmer 24 26 43 82 122 130 39 45 61 133 181 223 Gupta 24 26 42 82 122 127 38 43 64 133 178 216 RA 24 27 42 82 122 127 38 43 58 133 182 214 CDS 23 26 42 82 122 123 38 43 59 133 176 212 It can be noticed that the minimum makespan can be achieved by more than one heuristic rule. Also, CDS produced the minimum makespan for almost all the problems, but it could not be considered as the best heuristic until a statistical test was made to ensure that the differences between the heuristics are statistically significant and not from a chance or random error. 3.2. The Analysis of Variance 3.2.1. The statistical model and hypothesis Randomized Complete Block Design (RCBD) was used to compare the performance of the selected heuristics by considering the size of problems used in the test as a blocking factor. That would separate the variance between different problems' size (blocking effect) from the variance between heuristics. This reduces noise and provides a clearer picture of true heuristics differences. The statistical model for the RCBD can be written in several ways. The traditional model is an effects model: yij = µ + τi + βj + ɛij Where µ is an overall mean, τi is the effect of the ith heuristic algorithm, βj is the effect of the jth problem instance, and ɛij is the usual NID (0, σ2) random error term. [i=1,2,…,5 and j=1,2,….,12]. In RCBD, we are interested in testing the equality of the treatment means. Thus, the hypotheses of interest are: H0: µ1 = µ2 = µ3 = µ4 = µ5 H1: at least one µi ≠ µj 3.2.2. Model adequacy checking The use of ANOVA requires that certain assumptions be satisfied. Specifically, these assumptions are that the observations are adequately described by the model and that the errors are normally and independently distributed with mean zero and constant but unknown variance. If these assumptions are valid, the analysis of the variance procedure is an exact test of the hypothesis of no difference in treatment means.
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2091 In order to check these assumptions, plots of residuals are constructed using Minitab17. Figure 1 shows the normal probability plot of these residuals. The general impression from examining this display is that the error distribution is approximately normal. A plot of residuals versus heuristic rules is shown in Figure 2. There is no reason to suspect any violation of the independence or constant variance assumptions (see figures 2 and 3). Figure 1 Normal probability plot of residual. Figure 2 Plot of residual versus heuristic algorithm.
World Journal of Advanced Research and Reviews, 2025, 27(02), 2084-2094 2092 Figure 3 Plot of residual versus observation order. 3.2.3. Results of ANOVA Table 14 presents the results of the analysis of variance, from these results it can be concluded that there is a significant difference between the heuristic rules covered by this study, since the mean makespan of these heuristics differ significantly (p-value = 0.003 less than 0.05). Table 14 The results of ANOVA. Source of variation Degrees of freedom Sum of squares Mean of squares F0 P-value Heuristic rule 4 63 15.4 4.62 0.003 Problem size 11 221274 20115.8 6018.33 Error 44 147 3.3 Total 59 221483 A post-hoc analysis (Tukey’s test) was conducted to determine which heuristics differed from each other. The findings indicated that the CDS heuristics is significantly different from the SAI and Palmer heuristics but does not differ significantly from the RA and Gupta heuristics (see Table 15). Table 15 Grouping information using the Tukey method and 95% confidence. Heuristic algorithm N Mean Grouping SAI 12 92.91 A Palmer 12 92.17 A Gupta 12 91.25 A B RA 12 91.00 A B CDS 12 89.91 B 4. Discussion Results of the present study provide a statistically sound comparison between five heuristic rules (SAI, Palmer, Gupta, RA and CDS) for flow shop makespan. Based on the findings that the CDS heuristics is significantly different from the SAI and Palmer heuristics but do not differ significantly from the RA and Gupta heuristics. While the present study reveals significant performance variations, earlier research by Hossain et.al. [10] found Palmer, CDS, and NEH equally