1 CALL Ministry of University and Research (MUR), Directorate - General for Internaonalizaon and Communicaon, Noce D.D. 3264 dated 28/12/2021. Mission 4 "Educaon and Research" - Component 2 "From research to enterprise" - Investment Line 3.1 "Fund for the realizaon of an integrated system of research and innovaon infrastructure", Acon 3.1.1 "Creaon of new IRs or strengthening of exisng ones that contribute to Horizon Europe's Scienfic Excellence objecves and networking" PROJECT TITLE Humanies and cultural Heritage Open Science Cloud PROJECT ACRONYM H2IOSC PROJECT ID IR0000029 PROJECT WEBSITE hps://www.h2iosc.cnr.it CUP B63C22000730005 WP WP1 “Project and Financial Management, Quality Assurance” OU OU 1 OVI-CNR DELIVERABLE NUMBER 1.5 DELIVERABLE TITLE H2IOSC Forum Report EXPECTED DELIVERY DATE 3 0 / 04 /202 5 ACTUAL DELIVERY DATE 31/10/2025 This project is funded by the European Union - NextGeneraonEU. The views and opinions expressed are only those of the authors and do not necessarily reflect those of the European Union or the European Commission. Neither the European Union nor the European Commission can be held responsible for them.
2 AUTHOR(s) Organizaon Name Contact informaon CNR - OVI Emiliano Degl’Innocen emiliano.deglinnocen@cnr.it CNR - ISP C Veronica Colau veronica.colau@cnr.it CNR - OVI Alessia Spadi
[email protected] CNR - OVI Irene Falini i
[email protected] CNR - ISPC Crisna Massi Benede crisna.massibenede@cnr.it ABSTRACT D1.5 is a praccal resource to understand and consolidate the project’s acquired knowledge, offering valuable support to the Project decision-making structure in achieving project objecves. The primary objecve of D1.5 is to assess the implementaon condions of the H2IOSC project across various themac issues, including: i) acvies of the RIs nodes; ii) connecon and effecve implementaon of policies and guidelines defined by the federaon; iii) synergies with other relevant actors; iv) coordinaon and management of facilies, tools and services; v) definion and implementaon of strategic documents (business models, networking acvies, technology and skills transfer, outreach); vi) monitoring and evaluaon acvies. This version provides an updated state of the art of the Project as well as the outline of the KPIs defined for each dashboard so to have a complete view of H2IOSC implementaon condions.
3 TABLE OF CONTENTS LIST OF ACRONYMS LIST OF FIGURES LIST OF TABLES 1. INTRODUCTION 1.1 Background and Project Overview 1.2 Parcipang Infrastructures 1.3 Building the H2IOSC Federaon 1.4 Project Structure 1.5 H2IOSC Shared Goals: Key Acvies, Key Exploitable Results 1.6 Purpose and Objecves of the Deliverable 2. METHODOLOGY 2.1 Approach and framework for assessing implementaon condions 2.2 Data collecon and analysis methods 3. PROPOSED SOLUTIONS 3.1 Overview of proposed soluons and strategies to address idenfied issues 3.1.1 Infrastructure Node Performance Dashboard 3.1.2 Policy and Guideline Compliance Dashboard 3.1.3 Partnership and Networking Performance Dashboard 3.1.4 Facilies, tools and Services Management Dashboard 3.1.5 Strategic Development and Collaboraon Dashboard 3.1.6 Performance Measurement and Assessment Dashboard 3.2 Descripon of actors involved and the expected impact on implementaon condions 4. CONCLUSIONS AND RECOMMENDATIONS 5. UPDATES AND CONTINUOUS MONITORING
4 LIST OF ACRONYMS A Acvity CNR Consiglio Nazionale delle Ricerche CLARIN Common Language Resources and Technology Infrastructure D Deliverable DARIAH Digital Research Infrastructure for the Arts and Humanies EOSC European Open Science Cloud ERIC European Research Infrastructure Consorum ERA European Research Area ESFRI European Strategy Forum on Research Infrastructures EU European Union E - RIHS European R esearch I nfrastructure for H eritage S cience FAIR Findable, Accessible, Interoperable and Reusable FOE Fondo Ordinario per gli En e le istuzioni di ricerca GLAMs Galleries, Libraries, Archives, and Museums H2IOSC Humanies and cultural Heritage Italian Open Science Cloud ICT Informaon and communicaons technology IPR Intellectual Property Rights KA Key Acvies KER Key Exploitable Results KPI Key Performance Indicators MUR Ministero dell'università e della ricerca OPERAS Open scholarly communicaon in the European research area for social sciences and humanies OU Operaonal unit OVI Opera del Vocabolario Italiano PNIR Piano Nazionale per le Infrastruure di Ricerca PNR Piano Nazionale della Ricerca PNRR Piano Nazionale di Ripresa e Resilienza
5 RI Research Infrastructure SSH Social Sciences & Humanies SSHOC Social Sciences & Humanies Open Cloud TRL Technology Readiness Level WP Work Package
6 LIST OF FIGURES Figure number Figure name 1 H2IOSC Territorial Nodes (DCs) 2 WPs Interrelaons 3 Shared O bjecves, Key Exploitable Results, Key Acvies LIST OF TABLES Table number Table name 1 Targeted Research Infrastructures (RIs)
7 1. INTRODUCTION 1.1 Background and Project Overview H2IOSC (Humanies and cultural Heritage Italian Open Science Cloud1) is a project coordinated by the Italian Consiglio Nazionale delle Ricerche and designed to create a federated and inclusive cluster of 4 Research Infrastructures (RIs) in the ESFRI domain of Social and Cultural Innovaon, to enable researchers from various disciplines in the fields of humanies, language technologies and cultural heritage to collaborate in research by sharing tools, services and data. 1.2 Parcipang Infrastructures H2IOSC foresees the collaboraon of the Italian nodes of 3 ESFRI Landmarks in Social and Cultural Innovaon CLARIN2 , DARIAH3, E-RIHS4 and the project OPERAS5 In the table below a brief descripon of each parcipang RI is provided, according to Part 3 of the ESFRI Roadmap 20216: RI Name ESFRI Roadmap Descripon CLARIN The Common Language Resources and Technology Infrastructure (CLARIN) is a distributed Research Infrastructure that provides easy and sustainable access for scholars in the Humanies and Social Sciences to FAIR digital language data − in wrien, spoken or mulmodal form − and advanced tools to discover, explore, exploit, annotate, analyze or combine them, independent of their locaon. CLARIN is building a networked federaon of language data repositories, service centres and centres of experse, with single sign-on access for all members of the academic community in all parcipang countries. Tools and data from different centres are interoperable, so that data collecons can be combined and tools from different sources can be chained to perform complex operaons to support researchers in their work. Entered in the ESFRI Roadmap 2016, CLARIN became a European Research Infrastructure Consorum (ERIC) in 2012. Since several countries have joined either as full Member, or as Observer. The ulmate goal is to include all European countries as well as any interested third countries in or outside Europe. Most operaons, services and centres of the CLARIN infrastructure are provided and funded by CLARIN Members (and Observers). They set up a naonal consorum, typically consisng of universies, research instuons, libraries and public archives, of which at least one has the status of CLARIN Centre which is expected to create and provide access to digital language data collecons, and digital tools and experse for researchers to work with them. DARIAH The Digital Research Infrastructure for the Arts and Humanies (DARIAH) is a distributed Research Infrastructure to enhance and support digitally enabled 1 See: hps://www.h2iosc.cnr.it (last checked 27.02.2024) 2 See: hps://www.clarin.eu/ (last checked 27.02.2024) 3 See hps://www.dariah.eu/ (last checked 27.02.2024) 4 See: hps://www.e-rihs.eu/ (last checked 27.02.2024) 5 See: hps://operas-eu.org/ (last checked 27.02.2024) 6 See: hps://roadmap2021.esfri.eu/ (last checked 27.02.2024)
8 research and teaching for Arts and Humanies. DARIAH is a network of people, experse, informaon, knowledge, content, methods, tools and technologies from its member countries. It develops, maintains and operates an Infrastructure that sustains researchers in building, analyzing and interpreng digital resources. By working with communies of pracce, DARIAH brings together state-of-the-art digital arts and humanies acvies and scales their results to a European level. It preserves, provides access to and disseminates research that stems from these collaboraons and ensures that best pracces, methodological and technical standards are followed. Entered in the ESFRI Roadmap 2006, DARIAH was established as a European Research Infrastructure Consorum (ERIC) in 2014. DARIAH was awarded Landmark Status in 2016 as a Research Infrastructure that reached its Implementaon Phase and was considered a pan-European hub of scienfic excellence. Currently, DARIAH has 20 Members, one Observer and several Cooperang Partners in six non-member countries. Structurally, DARIAH operates through the Europe-wide networks of the Virtual Competency Centres (VCCs) and their constuent Working Groups. Each of the four VCCs is cross-disciplinary, mul- instuonal, internaonal and centred on a specific area of experse. Within this structure, DARIAH has over 20 dynamic Working Groups to integrate naonal services under specific operaonal categories. E-RIHS The European Research Infrastructure for Heritage Science (E - RIHS) is a distributed Research Infrastructure to support research on heritage interpretaon, preservaon, documentaon and management. E-RIHS delivers integrated access to experse, data and technologies through a standardized approach, and integrate world-leading European facilies into an organizaon with a clear identy and a strong cohesive role within the global heritage science community. Through interdisciplinary access to the four plaorms – E-RIHS ARCHLAB, E-RIHS DIGILAB, E-RIHS FIXLAB, E-RIHS MOLAB – E-RIHS supports a wide variety of research, from smaller object-focused case studies to largescale and longer-term collaborave projects, and smulates innovaon in instrumentaon, portable technologies and data science. The long--term tradion of this field of research, the ability to combine science with innovaon, and the support provided by EU-funded projects and integrang acvies such as EUARTECH, CHARISMA, IPERION CH and IPERION HS in conservaon science, and ARIADNE in archaeology, represent the background of E-RIHS. Entered in the ESFRI Roadmap 2016, E-RIHS was established as a European Research Infrastructure Consorum (ERIC) in 2025. It offers access to a wide range of fixed and mobile instruments in naonal facilies of recognized excellence, physically accessible collecons/archives and virtually accessible heritage repositories for standardized data storage, analysis and interpretaon. OPERAS The OPen scholarly communicaon in the European Research Area for Social Sciences and Humanies (OPERAS) is a distributed RI to enable Open Science and upgrade scholarly communicaon pracces in the Social Sciences and Humanies in line with the EOSC. OPERAS pools resources and offers services to enable all SSH stakeholders to streamline their acvies and maximize the
9 societal impact, in an interdisciplinary, mission - driven approach. OPERAS fosters the co-creaon and adopon of scholarly communicaon services addressing research needs in terms of discovery, content creaon, quality assurance, disseminaon, outreach, and evaluaon of outputs. It catalyses knowledge and know-how sharing, pracces adopon, and increases return on socio-economic investments. The OPERAS Concept and Design Phase dates back to 20122018 when the coordinated acons to establish the network and shaping the project began. This effort leads to the recognion of OPERAS as a project addressing High strategic potenal area for research in SCI in the ESFRI Roadmap 2018. OPERAS started its Preparaon Phase in 2019 by developing the business plan and governance model and promong services creaon and alignment for EOSC catalogue and transnaonal access. In 2019, OPERAS established the status of Internaonal non-profit Associaon under Belgian law (AISBL). Entered the ESFRI Roadmap 2021, OPERAS is striving to efficiently guarantee an efficient move to the Operaon Phase with a coherent approach to technical, administrave, and financial issues and the establishment of OPERAS ERIC. Table 1. Targeted Research Infrastructures (RIs) The acvies of the Italian naonal nodes for the above RIs are coordinated by CNR instutes, namely: CNR-OVI (DARIAH), CNR-ISPC (E-RIHS), CNR-ILC (CLARIN) and CNR-ILIESI (OPERAS). The strategic role of each naonal node is represented by the “High Priority” label awarded by the Italian Ministry for University and Research (MUR) in the context of the Italian Naonal Roadmap for Research Infrastructures (Piano Nazionale per le Infrastruure di Ricerca – PNIR). The PNIR is the Italian strategic program aimed at promong the creaon, expansion, and enhancement of research infrastructures in the country. PNIR is managed by the Ministry of University and Research (MUR) and aims to improve the accessibility and quality of Italian research infrastructures, fostering collaboraon between instuons and promong internaonal parcipaon. PNIR focuses on various research areas, including humanies and social sciences and aims to provide the scienfic communies of reference with advanced equipment, such as laboratories, high-performance compung centers, specialized research facilies, scienfic data archives, and other resources necessary to conduct high-quality research. Through PNIR, the Italian government seeks to promote compeveness and excellence in naonal research, as well as aract and retain talented researchers. The program also supports collaboraon between public and private research instutes, universies, businesses, and other stakeholders in the scienfic and technological sector. PNIR is a long-term iniave that involves planning, resource allocaon, and monitoring of research infrastructures in Italy. The goal is to create an environment conducive to internaonally recognized research and contribute to the country's economic growth and scienfic advancement. The daily operaons of the said naonal nodes are supported by specific funding measures granted annually to CNR by MUR (Fondo Ordinario per gli En e le istuzioni di ricerca – FOE).
16 Key Acvies: Design and development of scalable and extendable pilot plaorms, integraon of services and interfaces, accommodaon of new resources and data. Key Exploitable Result: Scienfic pilot plaorms that bring together domainspecific services and interfaces, supporng researchers in execung specific scienfic workflows and facilitang collaboraon across disciplines. 6. Shared Goal: Training resources and plaorms for FAIR and Open Science principles. Key Acvies: Development of online learning environments, creaon of training materials and modules, customizaon for different disciplines and experse levels. Key Exploitable Result: Training plaorms that provide researchers with access to educaonal resources and courses on FAIR and Open Science principles, promong the adopon of best pracces and enhancing users' skills and competencies. In a nutshell, the path from Shared Goals to Key Exploitable Results involves defining Key Acvies that lead to the execuon of specific acons within the project. These acvies ulmately generate tangible results that align with the Shared Goals and have the potenal for further exploitaon, creang economic or societal value. This enre process is at the core of the H2IOSC operaon and implementaon condions and will eventually impact the definion of a sound strategy (among other things) for the project’s Value Proposion and Sustainability. For this reason is crucial to monitor the process with specific tools, such as Dashboards (see below, Secon 1.6 Purpose and Objecves of the Deliverable) and other tools tracking progress, evaluang performance, facilitang decision-making, promong transparency, managing risks, and ensuring effecve documentaon and reporng. These tools should provide a comprehensive and visual overview of the project's implementaon, enabling stakeholders to opmize resource allocaon, address challenges, and ulmately maximize the project's value proposion and sustainability. 1.6 Purpose and Objecves of the Deliverable According to the Technical Annex: “D1.5 is the output of A1.5 and will consist of a set of documents assessing the implementaon condions of the H2IOSC project, providing to the Project Manager and the decision-making structure insights related to different themac issues that may represent a boleneck as well as suggesng pragmac soluons to deliver on me and within budget”. Based on the context described in the previous secons, “the path from Shared Goals to Key Exploitable Results”, is “at the core of the H2IOSC operaon and implementaon condions” and should be carefully monitored, using specific tools. As described in D1.1 and further explained in the following paragraphs (see, Secon 2.1, point 6, Monitoring and Evaluaon) H2IOSC is already using a number of tools for monitoring and reporng, which, however, should be integrated to fully exploit the potenal of the acquired knowledge, and offer support to the Project decision-making structure in achieving the scienfic objecves set out in technical annex (i.e. the Shared Goals). Thus D1.5 plays a vital role in the H2IOSC project. It encompasses a comprehensive set of recommendaons that will help and support the evaluaon of the project’s implementaon
17 condions. The primary objecve of D1.5 is to provide the Project decision-making structure with valuable insights concerning themac issues that may pose bolenecks to the progress towards the Shared Goals, including, but not limited to: - Overseeing the operaons of the RIs nodes; - Ensuring the adherence and successful execuon of policies and guidelines set by the federaon; - Facilitang collaboraon with other pernent stakeholders; - Streamlining coordinaon and management of facility, tool, and service development or enhancement; - Providing assistance in defining and implemenng business models, while encouraging networking, outreach, and technology and skills sharing; - Assisng in the monitoring and evaluaon of acvies. Furthermore, this deliverable supports the elaboraon of possible pragmac soluons aimed at ensuring the achievement of the project objecves (i.e. the Shared Goals) organized in dashboards, with the following focuses: - Infrastructure Node Performance Dashboard - Policy and Guideline Compliance Dashboard - Partnership and Networking Performance Dashboard - Facilies, tools and Services Management Dashboard - Strategic Development and Collaboraon Dashboard - Performance Measurement and Assessment Dashboard A dashboard is a visual interface that provides an overview of relevant informaon and key performance indicators in a clear and concise manner, allowing users to monitor and track specific aspects of a system or process. The dashboards menoned work by aggregang and displaying real-me data and insights related to the respecve acvies (i.e. Key Acvies). They present metrics, trends, and visualizaons that enable users to assess the performance, compliance, partnerships, management, strategic development, and overall effecveness of the corresponding areas within the federaon. Users are able to access and interpret the informaon presented on the dashboards to make informed decisions, idenfy areas of improvement, and ensure efficient and effecve operaons towards the achievement of the Shared Goals and the actual delivery of the Key Exploitable Results. 2. Methodology 2.1 Approach and framework for assessing implementaon condions As stated before WP1 "Project and Financial Management, Quality Assurance" is primarily focused on ensuring the successful achievement of the Project’s objecves, milestones, and deliverables while maintaining adherence to budget constraints. It also plays a crucial role in establishing effecve communicaon channels and managing external interacons between the Project and various stakeholders, parcularly the Ministry of University and Research (MUR). One of the key responsibilies of WP1 is to establish project agreements and ensure
18 compliance with the rules and reporng requirements set by the ministry and PNRR (Naonal Recovery and Resilience Plan). A significant objecve of WP1 is the establishment of a decision-making framework, as detailed in Secon 4 (Decision Making) of D1.1 (Quality assurance plan, guidelines, project handbook)8. This framework is designed to facilitate prompt and coordinated communicaon between the actors involved in H2IOSC, as described in Secon 3 of D1.19, including Operave Units (OUs) and Research Infrastructures (IRs), enabling efficient decision-making processes within the project to ensure the achievement of the Shared Goals. Moreover, WP1 takes on the responsibility of clearly defining accountability across all levels of the project. This ensures that everyone involved in the project understands their specific roles and responsibilies, promong efficient collaboraon and effecve execuon of tasks. A shared governance structure is crucial to ensure the achievement of Shared Goals and facilitate the path from Shared Goals to Key Exploitable Results. It promotes alignment, collaboraon, strategic decision-making, resource mobilizaon, monitoring, accountability, stakeholder engagement, and long-term sustainability. A well-funconing shared governance structure enhances the project's effecveness, relevance, and overall impact. In this context Task 1.5 "Forum: promong shared governance for the H2IOSC federaon", plays a crucial role in seng up the opmal condions to provide praccal assistance to the decision-making structure of the H2IOSC project. This task encompasses several key responsibilies, including: 1) Monitoring RIs Acvies: Task 1.5 involves monitoring the acvies of the Research Infrastructures (RIs) nodes within the project. This includes tracking their progress, ensuring compliance with project guidelines, and idenfying any potenal issues or obstacles. This acvity is undertaken (inially) in close collaboraon with WP4 which is the responsible for seng up the H2IOSC territorial nodes, and then extended to other WPs, to include and represent all the relevant Key Exploitable Results (see above, Secon 1.5: H2IOSC Shared Goals: Key Acvies, Key Exploitable Results). 2) Implementaon of Policies and Guidelines: It is responsible for ensuring the connecon and effecve implementaon of policies and guidelines established by the federaon. This helps maintain consistency and coherence across the project, promong unified decision-making processes. This acvity is undertaken in close collaboraon with WP3 which is the responsible for seng up the H2IOSC digital resources alignment and policies framework, and then extended to the other WPs (i.e. WP2, WP4, WP5, WP6, WP8) to include all the relevant frameworks and policies elaborated by the federaon. 3) Synergies with Relevant Actors: Task 1.5 promotes synergies with other relevant actors in the field. This involves establishing collaboraons and partnerships with external enes to leverage their experse, resources, and networks for the benefit of 8 Cfr.: D1.1 Quality assurance plan, guidelines, project handbook, pp. 15-17. 9 Cfr.: D1.1 Quality assurance plan, guidelines, project handbook, pp. 11-13.
19 the H2IOSC project. This includes strengthening collaboraons (i.e.: the ITSERR10 and FOSSR11 PNRR-IR projects, presented within the same call and the CHANGES12 project, presented within the Extended Partnerships call n.5) as well as other collaboraons (i.e. the FAIR13 project, presented within the Extended Partnerships call n. 1), to improve the synergisc acon between H2IOSC and its parcipang RIs and other actors and provide infrastructural support for the planned research and innovaon acons (i.e. in the case of PE5, CHANGES). 4) Coordinaon and Management of Facilies, Tools, and Services: It facilitates the coordinaon and management of the development or upgrade of facilies, tools, and services within the project. This ensures smooth integraon and operaon of various components required for the project's success. Leveraging on the work being done for point 1) Monitoring RIs Acvies, several key sub-tasks and responsibilies are planned and undertaken to achieve the desired outcomes: i) Facility Development and Upgrades: this sub-task involves planning, coordinang, and overseeing the development or upgrade of facilies required for the H2IOSC project. It includes idenfying the infrastructure needs, ensuring compliance with relevant regulaons and standards, and managing the construcon or modificaon process; ii) Tool Development and Enhancement: this sub-task focuses on the coordinaon and management of the development or enhancement of tools necessary for the project's implementaon. It includes idenfying the specific requirements, collaborang with relevant stakeholders, managing the development process, and ensuring the integraon of the tools into the project workflow; iii) Service Provision and Management: this sub-task involves the coordinaon and management of the services provided within the H2IOSC project. It includes defining service requirements, establishing service-level agreements, monitoring service delivery, and addressing any issues or challenges that may arise; iv) Integraon and Interoperability: this sub-task focuses on ensuring the smooth integraon and interoperability of various components within the project. It entails idenfying interfaces and integraon points, coordinang communicaon and data exchange between different systems, and resolving any compability issues; v) Operaonal Efficiency and Opmizaon: this subtask aims to improve the operaonal efficiency of facilies, tools, and services within the project. It involves implemenng best pracces, streamlining processes, opmizing resource ulizaon, and connuously monitoring performance to idenfy areas for improvement. 5) Business Models and Networking: Task 1.5 supports business models within the project (D1.4 Sustainability Financial Plan). It also encourages the development of networking acvies, outreach iniaves, and technology and skills transfer to foster collaboraons and maximize the impact of the project. This acvity is crucial for 10 Cfr.: hps://www.itserr.it/ 11 Cfr.: hp://www.fossr.eu/ 12 Cfr.: hps://sites.google.com/uniroma1.it/changes/home 13 Cfr.: hps://www.fondazione-fair.it/
20 elaborang the value proposion of the project (i.e.: elements represenng the unique added value of the H2IOSC cluster) and facilitang its long-term success and support the creaon of a sustainable and profitable framework to capitalize on the project's outcomes, technologies, and experse. Outreach acvies are also essenal for raising awareness about the H2IOSC cluster and its value proposion. By engaging with potenal customers (users), both from the public and private sectors, WP Leaders contribute to idenfying the target audience for each key acvity. This understanding helps tailor the services and offerings to meet specific needs and interests, ensuring a customer-centric approach. Leveraging on the work being done for point 1) Monitoring RIs Acvies, in the preparaon of a comprehensive list of possible acvies and services that the H2IOSC cluster can offer to third pares (i.e. the Key Exploitable Results), this process also involves idenfying potenal sources of revenue, exploring regional/naonal and internaonal contribuons, as well as considering fees for the services provided (where possible and within the borders set up by the naonal and internaonal rules and regulaons). Researchers and key personnel are involved in the analysis of possible revenues, ensuring a thorough assessment of the financial aspects included in H2IOSC Deliverable 1.4 Sustainability Financial Plan. 6) Monitoring and Evaluaon: This sub-task provides support for monitoring and evaluaon acvies within the H2IOSC project, as described in secons 5 (Monitoring) and 6 (Reporng) of D1.114. This includes assessing the progress, idenfying potenal challenges, and collecng valuable data to inform decision-making processes. According to D1.1 Secon 5 (Monitoring) in consideraon of the Project’s ambions and arculaon and due to the short me range available for its implementaon “the integraon of different monitoring acvies” is required “for the successful execuon of the H2IOSC acvies plan”15. Thus this sub-task is the most suitable to host acvies linked to integraon of exisng tools and elaboraon of means to provide “an overview of relevant informaon and key performance indicators in a clear and concise manner, allowing users to monitor and track specific aspects of a system or process” (i.e.: Dashboards). Task 1.5 thus designs a centralized data plaorm, providing real-me insights into various aspects of the project's implementaon and outcomes, allowing stakeholders, including the Project decision-making structure, to monitor the project's performance against predetermined targets (i.e.: Shared Goals). The plaorm is fed with informaon gathered in the above sub-tasks, that will be captured (see the secon on data collecon for further details) and integrated to provide representaons presenng the data in a user-friendly and easily understandable format. 14 Cfr.: D1.1 Quality assurance plan, guidelines, project handbook, pp. 19-31. 15 Cfr. D1.1 Quality assurance plan, guidelines, project handbook, p. 19.
21 2.2 Data collecon and analysis methods In consideraon of the project’s Shared Goals, Key Acvies and Key Exploitable Results, to collect the necessary informaon within H2IOSC, the project's internal organizaon and the parcipang Research Infrastructures (RIs) development agenda has been leveraged. This involves the following steps: a. Data requirements idenficaon: Within each Work Package, the project team idenfies the specific data and informaon needed to monitor and evaluate the progress and performance of the Key Acvies related to that package. This could include key performance indicators (KPIs) and metrics that are used to measure success. b. Data collecon mechanisms: The project team collaborates with the parcipang RIs to establish data collecon mechanisms. This may involve seng up data reporng processes, implemenng data tracking systems, or leveraging exisng data management (or reporng) systems within the RIs. The goal is to ensure the regular and systemac collecon of relevant data points. c. Integraon of development agenda: The project team aligns the data collecon efforts with the parcipang RIs' development agenda. This means integrang the monitoring and reporng requirements into the RIs' ongoing acvies and processes. The development agenda of the RIs serves as a framework for defining the specific data points and indicators that need to be collected. d. Data analysis and reporng: The collected data are analyzed and processed to generate meaningful insights and reports. This analysis helps in assessing the performance, compliance, and progress of the acvies within the project and the parcipang RIs towards the achievement of the Shared Goals. The results are presented through the dashboards menoned earlier, providing a clear overview of the project's status and highlighng areas that require aenon or improvement.
22 3. Proposed Soluons With the aim of designing and implemenng specific tools (i.e. Dashboards) to monitor “the path from Shared Goals to Key Exploitable Results”, leveraging on exisng monitoring and reporng tools, processes and systems and reducing the fragmentaon of the current situaons, we proposed a methodology to assess H2IOSC implementaon condions (i.e.: “the path from Shared Goals to Key Exploitable Results”, see Secon 2.1 above) and a process to collect and analyze the collected data (Secon 2.2 above), both within the context of Task 1.5 acvies. In the following paragraphs we provide an overview of possible specific tools (i.e.: Dashboards) to monitor and assess the project’s performance. The proposed dashboards, described in the following paragraphs, should be considered as examples and their coverage and scope should be refined through collaborave design within the project. Furthermore, the implementaon of the dashboards should be considered a mid to long term goal for the project rather than a short-term endeavor. There are several reasons why this implementaon requires adequate me and planning. First and foremost, since developing a comprehensive set of dashboards integrang data from various sources and systems within the project involves having clear requirements and data collecon mechanisms already in place. This requires a thorough understanding of the data landscape, data mapping, and data integraon processes. It may involve consolidang data from disparate systems, ensuring data quality and consistency, and establishing robust data pipelines. This integraon process can be complex and me-consuming, requiring careful planning and coordinaon. Considering these factors, the implementaon of the dashboards should be viewed as a mid to long term goal for the project. Adequate me should be allocated for planning, development, stakeholder engagement, data integraon, and iterave refinement. By taking a comprehensive and phased approach, the project can ensure the successful implementaon and adopon of the dashboards, ulmately enhancing project management, decision-making, and the overall success of the H2IOSC project. 3.1 Overview of proposed soluons and strategies to address idenfied issues 3.1.1 Infrastructure Node Performance Dashboard The Infrastructure Node Performance Dashboard is a specialized tool designed to monitor and assess the performance of the Research Infrastructures (RIs) nodes involved in the H2IOSC project. It serves as a centralized plaorm that provides comprehensive insights into the acvies, achievements, and challenges of each RI node within the project. This dashboard enables stakeholders, project management, RIs coordinators, and decisionmaking structure, to track and evaluate the performance of individual RI nodes against predefined benchmarks and key performance indicators (KPIs). It offers a holisc view of the nodes' contribuons to research and innovaon, their collaborave efforts, and their adherence to project objecves (i.e.: § 1.5 “H2IOSC Shared Goals: Key Acvies, Key Exploitable Results”). Furthermore, the Infrastructure Node Performance Dashboard facilitates collaboraon and knowledge exchange among the nodes. It highlights successful partnerships, joint research endeavors, and shared resources, enabling stakeholders to idenfy and leverage synergies
23 between the nodes. This promotes collaboraon and enhances the overall impact of the project. Through the dashboard, stakeholders can assess not only operaonal performance but also the broader effecveness and impact of the acvies carried out by each RI node. The dashboard also helps idenfy challenges and areas for improvement within each RI node. It allows stakeholders to idenfy potenal bolenecks, resource allocaon issues, or capacity gaps that may hinder the node's performance. By providing clear insights into these challenges, stakeholders can take proacve measures to address them and opmize the performance of each node. Overall, the Infrastructure Node Performance Dashboard plays a vital role in monitoring, evaluang, and opmizing the performance of the RI nodes within the H2IOSC project. It offers stakeholders a comprehensive overview of each node's acvies, achievements, and challenges, facilitang evidence-based decision-making and ensuring the successful implementaon of the project. Through this dashboard, stakeholders can effecvely assess the progress and impact of the RI nodes, foster collaboraon, and drive connuous improvement in research and innovaon within the field of humanies and cultural heritage. Key Performance Indicators: KPI Number of users served by each RI node Indicator Number of users served by each RI node Definion(s) This KPI measures the total number of user access events associated with the services offered by each RI node. Raonale The KPI monitors the ulizaon of services and how access is distributed across different modes of interacon Assumpons It is assumed that all services are clearly mapped and categorized by the RI nodes, and that access to each service can be recorded consistently. Data/informaon needs and resources This KPI is informed by structured service mapping acvies conducted within the project. How is the KPI calculaon carried out The total number of access events to services is aggregated from the available datasets. Access events are reported separately by category, allowing for analysis by type of user interacon. Who is providing this informaon Provided by RI s Sources internal service usage records; project logs Unit of measure Number The measured KPI values are reported below.
24 The invesgated data concerns the number of accesses given on an annual basis (2024) by the nodes for the services foreseen in WP6 and the number of accesses given as H2IOSC cluster, for the same services, through the TNA/NA calls (1-2-3) for which details are available at the following link: hps://www.h2iosc.cnr.it/tna-na-calls/ Service name node name a ccess number (per node) a ccess number (TNA calls H2IOSC) ATON (WebXR services for HS) E-RIHS.it 15300 (public accesses worldwid e in 2024) 9 Kapto (capture services) E - RIHS .it 440 (naonal ) 1 SENSE - Wireless sensor networks for cultural heritage conservaon and monitoring E - RIHS .it 0 2 GATTO DARIAH - IT 2000 NA TIGRO DARIAH - IT 2000 1 MFE: MetaFAIR Ecosystem DARIAH - IT 100 1 DPH - Digital Philology Hub DARIAH-IT 100 NA LexO ItAnt CLARIN-IT 4 (linked to EpiLexO ItAnt) NA CASH ItAnt CLARIN - IT 4 (linked to EpiLexO ItAnt) NA SKOSMOS Vocabulary Service CLARIN-IT 0 1 EpiLexO Editor ItAnt CLARIN-IT 50 18 eScriptorium CLARIN - IT 100 13 EpiLexO Editor CLARIN - IT 4 NA Federated Content Search CLARIN - IT 300 NA It is also important to consider the role of the H2IOSC Marketplace. As the Marketplace will become fully operaonal only at the end of the project, it is not possible to provide meaningful
25 data on user access through this plaorm, the figures available at this stage would be not representave of its actual use. Once the Marketplace is fully funconal, the corresponding KPI should include access events both through the Marketplace and directly via the individual Research Infrastructures (RIs). KPI Research Output Efficiency Indicator Research Output Efficiency Definion(s) Indicates the level of research acvity and the volume of scienfic output generated within the H2IOSC Federaon by the 4 RIs Raonale For the purposes of this KPI, a publicaon is defined as any formally shared research output that contributes to the disseminaon of knowledge and results arising from the use of Research Infrastructure (i.e.: arcles featured in scienfic journals but also publicaons on Zenodo). The meframe to be considered is the duraon of the project. Publicaons produced within the meframe of the project but not yet published by its end can also be considered if properly mapped in the project logs (e.g: arcle accepted by a journal which will be published aer the end of the project) Assumpons R esearch outputs have been mapped throughout the project Data/informaon needs and resources To compute this KPI, each RI node must collect metadata on research outputs How is the KPI calculaon carried out The KPI is calculated by counng the research output produced within each RI node. Who is providing this informaon Provided by RIs Sources Deliverables ; Project logs Unit of measure Number The measured KPI values are reported below. The data invesgated concern the number of publicaons carried out from the beginning of the project unl 31 October 2025, prepared by the individual nodes and the H2IOSC cluster, including for example deliverables, arcles, conference proceedings (conference presentaons, proceedings and conference proceedings arcle), handbooks (guidelines and manuals), papers (such as journal arcles, contribuons to volumes).
32 Count how many were submied by the defined deadline (aer the project extension). Calculate the percentage of on-me submission Who is providing this informaon Provided by RIs and GEA Sources Deliverables, logs by coordinaon team Unit of measure Percentage The measured KPI values and some concluding comments are reported below. TYPE PERCENTAGE (%) Technical reports 47 Deliverables 27 IO - Civil Infrastructures 0 IO - Public call for applicaons for the compeve selecon procedure for Temporary personnel 62 IO - Open Access, Transnaonal Access, FAIR principle implementaon 0 IO - Public tender for scienfic instrumentaon and technological equipment acquision 0 IO – Training/Phd 0 IO - Training and engagement Plan Developed 0 Regarding Technical Reports, it should be noted that the percentage was calculated based on 17 technical reports submied as of the date of this document. The first four reports were submied in the following bimesters pending the resoluon of some bugs in the GEA ministerial plaorm. The last four reports were submied in the bimester following the one scheduled, pending receipt of all documentaon relang to the DNSH forms associated with the relevant two-month period's acquisions. The remaining eight were submied by the scheduled deadline. Regarding Deliverables, please note that the percentage was calculated based on 30 deliverables submied as of the date of this document, of which 8 were submied by the scheduled deadline. The delay for the other deliverables was primarily due to the fact that for most WPs, the expected staff was recruited later than expected, given the meframes associated with selecon procedures and some unsuccessful selecons. This resulted in a delay of several months in the execuon of acvies and the subsequent preparaon of the deliverables related to those acvies. Furthermore, the project was extended by 6 months from the originally planned 30, which resulted in a different rescheduling of the deadlines for intermediate deliverables. In any case, at the end of October 2025, only the deliverables scheduled for the end of the project remain to be submied, therefore the delay was made up without affecng the regular progress of the project.
33 Regarding the intermediate objecve "civil infrastructures" it should be noted that the indicator used to verify its achievement is "N. of Civil Infrastructures related Public tenders published." Of a total of 16 tenders, most were published in bimester 7. The delay compared to the expected bimester 1 was due both to the delay in staff recruitment, as previously menoned, and to the complexity of these tenders and the ming of their publicaon. In any case, by bimester 15, the objecve was fully achieved. Regarding the intermediate objecve "Public call for applicaons for the compeve selecon procedure for Temporary personnel " it should be noted that the indicator used to verify its achievement is "N. of Public calls for applicaons for the compeve selecon procedure for Temporary personnel published." 62% of the 81 posions were published in the expected bimester 2, the remaining ones fully completed few months later (bimester 4) due to the number of the procedures and the concerned meframe. Regarding the intermediate objecve "Open Access, Transnaonal Access, FAIR principle implementaon" it should be noted that the indicator used to verify its achievement is "N. of Open Access, Transnaonal Access, FAIR principle implementaon Public tenders awarded." Of a total of 42 tenders, most were awarded in bimester 7. The delay compared to the expected bimester 2 was due both to the delay in staff recruitment, as previously menoned, and to the complexity of these tenders and the ming of their compleon. In any case, by bimester 15, the objecve was fully achieved. Regarding the intermediate objecve "Public tender for scienfic instrumentaon and technological equipment acquision" it should be noted that the indicator used to verify its achievement is "N. of Public tenders (above-threshold procedures) for scienfic instrumentaon and technological equipment acquision published". The objecve was fully achieved in bimester 7. The delay compared to the expected bimester 3 was due to the same reason reported for the above-menoned IOs. Regarding the intermediate objecve "Training – PhD " it should be noted that the indicator used to verify its achievement for training is "N. of Training acvies related Public tenders awarded" and for Phd is "N. of PhDs acvated." Of a total of 34 training tenders, most were awarded in bimester 7. The delay compared to the expected bimester 3 was due both to the delay in staff recruitment, as previously menoned and to the ming of the procedures compleon. In any case, by bimester 13, the objecve was fully achieved for training acvies. Of a total of 11 Phds, most were acvated in bimester 7. The delay compared to the expected bimester 3 was due to the interacons with Universies which took more me than expected. In any case, by bimester 8, all Phds were acvated. Regarding the intermediate objecve "Training and engagement Plan Developed " it should be noted that the indicator used to verify its achievement is "Training and engagement plan delivered". The Objecve was achieved in bimester 6 instead of 5. KPI Technological maturity monitoring Indicator Technological m aturity monitoring Definion(s) This KPI measures the technological maturity of the services and pilots developed or adopted by each RI, using the TRL scale (from TRL 1: basic principles observed, to TRL 9: actual system proven in operaonal environment). The average TRL score per
34 node reflects the overall readiness of services to be used reliably by the research community. Raonale This KPI provides insight into the project’s technical progress. Assumpons TRL values are assigned using a standardized and consistent methodology; TRLs reflect realisc development stages at given milestones. Data/informaon needs and resources TRL assessments per service and per milestone; technical documentaon How is the KPI calculaon carried out extracng the detected TRL for each service Who is providing this informaon RI service coordinators and technical leads Sources Deliverables, TRL tracking logs Unit of measure Average TRL score (numeric, 1 to 9) The measured KPI values are reported below. The compilaon of the Technological Maturity Monitoring KPI table is primarily based on the work carried out by WP3 on the assessment of the Technology Readiness Level (TRL) of services and pilots developed within H2IOSC. Specifically, the table draws directly from the dataset produced by WP3, which systemacally tracks the evoluon of technological maturity across the federaon. From this reference table, we extracted three key fields: Research Infrastructure, Service, and TRL value corresponding to the most up-to-date TRL value, as of 31 October 2025, recorded in the WP3 dataset. Service Node Name Final TRL detected at 31/10/2025 [E-RIHS] GRAVIFIX tool E-RIHS.it 8 [E - RIHS] 3D ANNOTATION tool E-RIHS.it 8 [E-RIHS] SimilarityLib E-RIHS.it 8 [E-RIHS] AI/ML soluons for Mulmodal Datasets E-RIHS.it 8 [E - RIHS] Mulmodal datasets visualizaon tool E-RIHS.it 8 [E-RIHS] HyMolab E-RIHS.it 8 [E-RIHS] ATON (WebXR services for HS) E-RIHS.it 8 [E - RIHS] Kapto E - RIHS.it 8
35 [E-RIHS] SENNSE – Spaal Heritage Science Data Management - WSN Editor E - RIHS.it 8 [E-RIHS] Digital Fabricaon Laboratory Virtual Access E-RIHS.it 8 [E-RIHS] Remozaon for Digital Twins E-RIHS.it 8 [E - RIHS] STONEVERSE E - RIHS.it 8 [DARIAH] TIGRO - Tesoro Italiano delle Origini, gestore ricerche DARIAH - IT 8 [DARIAH] EVT - Edion Visualizaon Technology DARIAH - IT 8 [DARIAH] RAISE - Restore dAta Integraon SuitE DARIAH-IT 8 [DARIAH] MFE - MetaFAIR Ecosystem DARIAH - IT 8 [OPERAS] Remote Open Access to content-based services and resources. A pluggable distribuon system that will ensure the remote use of the resources, services and hubs implemented by OPERAS within the H2IOSC project and, more generally, their remote, non real- me and possibly disconnected use 6.10 OPERAS - IT 8 [CLARIN - IT] LexO ItAnt CLARIN - IT 8 [CLARIN-IT] CASH ItAnt CLARIN - IT 8 [CLARIN-IT] SKOSMOS Vocabulary Service CLARIN - IT 8 [CLARIN-IT] Triple Store (GraphDB) CLARIN - IT 8 [CLARIN-IT] ILC PI - EpiLexO ItAnt CLARIN-IT 8 [CLARIN-IT] Stanza NLP Chain CLARIN - IT 8 [CLARIN-IT] ILC PI - Stanza NLP Chain for ParlaMint Data CLARIN-IT 8 [CLARIN - IT] ILC PI - EpiLexO Editor CLARIN - IT 8 [CLARIN-IT] UDPipe CLARIN - IT 9 [CLARIN - IT] Named Enty Recognion (NameTag) CLARIN - IT 9 [CLARIN - IT] Federated Content Search (FCS) CLARIN - IT 8 [CLARIN - IT] TEI Publisher + eXist - db CLARIN - IT 8 [CLARIN - IT] eScriptorium CLARIN - IT 8
36 PILOT RATIO - FAST (Fairness ASsessment Tool) OPERAS - IT 8 PILOT RATIO - CONNECT (CollecONs maiNtanencE and produCTion) OPERAS - IT 8 PILOT NEST - New Science in Transion OPERAS - IT 8 PILOT OSTGL - Open Scholarly and Technical Grey Literature Plaorm OPERAS - IT 8 PILOT Interlumo E-RIHS.it 8 PILOT Illuminated manuscript HUB E-RIHS.it 8 PILOT HeriVerse-Heritage Science Metaverse E-RIHS.it 8 PILOT SENNSE - Spaal hEritage scieNce oNline Sensor Environment E - RIHS .it 8 PILOT Open Digital Archaeology Hub E - RIHS.it 9 PILOT Open Digital Epigraphy Hub E - RIHS.it 9 PILOT Scienfic Digital Hub for Painng Collecons E - RIHS.it 8 PILOT Prototyping plaorm for Virtual / Physical Exhibions E-RIHS.it 7 PILOT Scienfic digital hub for metal artworks E-RIHS.it 8 PILOT Digital Philology Hub DARIAH - IT 8 PILOT Digital Heritage and Memory Hub DARIAH - IT 8 PILOT Archivio Vi.Vo. (Oral Data Plaorm) CLARIN - IT 8 PILOT Linguisc Linked Open Data (LLOD) Plaorm CLARIN - IT 8 PILOT TaskLet (Framework for Psycholinguisc Tasks) CLARIN - IT 8 Data Collecon and Analysis: The data for these KPIs can be gathered through project deliverables, and technical reports. The analysis should focus on idenfying trends, paerns, and potenal risk areas.
37 The findings should be used to connuously improve the compliance process and minimize risks. 3.1.3 Partnership and Networking Performance Dashboard The Partnership and Networking Performance Dashboard is a dynamic tool to monitor and assess the effecveness of partnerships and networking acvies. It serves as a centralized plaorm that enables stakeholders to evaluate the collaborave efforts and synergies established with relevant actors in the field of research and innovaon. This dashboard consolidates data from various sources, including possible agreements, joint iniaves, and networking events. It provides stakeholders with a comprehensive view of the project's partnership landscape and the impact of these collaboraons on the project's outcomes. Through the Partnership and Networking Performance Dashboard, stakeholders can assess the quality and quanty of partnerships established within the project. It provides insights into the diversity of stakeholders involved, and the alignment of partners' experse and resources with the project's objecves. Stakeholders can evaluate the success of partnerships in terms of joint research endeavors, knowledge exchange, technology transfer, and possible industry engagement. The dashboard facilitates the monitoring of networking acvies carried out by the project, such as workshops, conferences, and seminars. It provides informaon on the number of events organized, parcipant engagement, and the disseminaon of project results. By tracking these networking acvies, stakeholders can gauge the level of visibility, reach, and impact achieved through these iniaves. Furthermore, the Partnership and Networking Performance Dashboard enables stakeholders to assess the outcomes and impact of collaboraons. It tracks (for example) metrics such as publicaons, joint projects resulng from partnerships established within the project. This helps stakeholders understand the tangible benefits and contribuons of partnerships to the project's overall objecves and outcomes. The dashboard also serves as a tool for idenfying potenal areas of partnership opportunies. It can highlight gaps in collaboraons or sectors that require more engagement. By idenfying these areas, stakeholders can take proacve measures to foster new partnerships, strengthen exisng relaonships, and leverage the experse and resources of relevant actors. Overall, the Partnership and Networking Performance Dashboard plays a crucial role in facilitang effecve collaboraon and maximizing the impact of the H2IOSC project. It provides stakeholders with a comprehensive overview of partnership efforts, enables datadriven decision-making, and promotes evidence-based intervenons to enhance networking acvies. Through this dashboard, the project can build robust partnerships, foster knowledge exchange, and drive innovaon within the field of humanies and cultural heritage research.
38 Key Performance Indicators: KPI - Number of networking events organized Indicator Number of networking events organised Definition(s) The KPI refers to the count of formal or informal events specifically designed to bring together stakeholders, professionals or participants with the primary goal of facilitating connections, partnerships, knowledge sharing or collaboration. Rationale Networking events foster partnerships and inter - organizational cooperation; they can lead to new business opportunities or strategic alliances; they are useful for management to track stakeholder engagement activities; they reflect how actively the project promotes interaction and growth, technology transfer. Assumptions Events are organized intentionally for networking; events have a clear objective related to stakeholder interaction, professional relationship building, or collaboration; only distinct events are counted. Data/information needs and resources Event Name/Title; Date(s) of the Event; Event Objective; Type of Event; Location or Mode (physical/virtual). How is the KPI calculation carried out Sum of events of this type. Who is providing this information Provided by the project governance or CNR Sources Webpage Unit of measure Number The measured KPI values are reported below.
39 The analyzed data concerns the number of events from the start of the project unl 31 October 2025, which saw the parcipaon of individual nodes and the H2IOSC cluster. Event type node name event number (per node) Event number (H2IOSC) General Meeng 1 Fesval 1 Workshop 2 Conference CLARIN-IT 13 Conference DARIAH - IT 7 Conference E - RIHS .it 4 1 Conference OPERAS - IT 3 Conference and workshop DARIAH - IT 1 Conference and workshop OPERAS-IT 1 Event CLARIN-IT 1 Event DARIAH - IT 5 Event E - RIHS .it 3 Event and workshop E - RIHS .it 1 Exhibion E - RIHS .it 1 Expo E - RIHS .it 4 Meeng CLARIN - I T 1 Round table E-RIHS.it 3 Seminar including a webinar CLARIN-IT 8 Study day CLARIN - IT 2 Study day E - RIHS .it 1 Symposium E - RIHS .it 2 Talk CLARIN-IT 4 Training School ( including a Summer School) CLARIN-IT 3 Tutorial CLARIN - IT 1 Workshop CLARIN - IT 2 Workshop DARIAH - IT 1
40 Workshop E - RIHS - IT 10 Workshop OPERAS - IT 1 KPI - Number of publications on the same thematic area Indicator Number of publications on the same thematic area Definition(s) It refers to the count of publications that fall within a defined thematic or disciplinary area (Delibera CNR n. 126/2024). Rationale Evaluate the research productivity in a specific field. Assess the specialization or focus of a research group. Track trends in research output in specific subject areas. Assumptions Publications reflect research activity and output. Thematic areas are defined consistently usingrecognized classification systems (following Delibera CNR n. 126/2024). Databases and sources provide accurate and comprehensive coverage of relevant publications. Authorship and attribution are correctly assigned. Data/information needs and resources A reliable bibliographic database (zenodo) How is the KPI calculation carried out Sum of publications per area Who is providing this information Provided by the project governance or CNR Sources Database Unit of measure Number The measured KPI values are reported below.
41 The data investigated concern the number of publications, per thematic area (Delibera CNR n. 126/2024), carried out from the beginning of the project until 31 October 2025, prepared by the individual nodes and the H2IOSC cluster, Themac area of the publicaon node name publicaon number (per node) publicaon number (H2IOSC) PE4_2 Spectroscopic and spectrometric techniques CLARIN - IT 1 PE4_2 Spectroscopic and spectrometric techniques E-RIHS.it 1 PE6_7 Arficial intelligence, intelligent systems, natural language processing DARIAH - IT 2 PE6_7 Arficial intelligence, intelligent systems, natural language processing OPERAS - IT 1 PE6_8 Computer graphics, computer vision, mulmedia, computer games E - RIHS .it 1 PE6_9 Human computer interacon and interface, visualisaon E-RIHS.it 6 PE6_10 Web and informaon systems, data management systems, informaon retrieval and digital libraries, data fusion CLARIN - IT 1 PE6_10 Web and informaon systems, data management systems, informaon retrieval and digital libraries, data fusion E-RIHS.it 5 PE6_10 Web and informaon systems, data management systems, informaon retrieval and digital libraries, data fusion OPERAS - IT 1 PE6_11 Machine learning, stascal data processing and applicaons using signal processing (e.g. speech, image, video) DARIAH - IT 2 PE6_11 Machine learning, stascal data processing and E - RIHS .it 1
48 Indicator Value proposition of H2IOSC Definition(s) The KPI describes the unique value that H2IOSC delivers. It answers: What problem is being solved? Who will benefit and how? Rationale The rationale provides the justification for undertaking the project: What are the strategic goals? What is the impact of not doing the cluster? What competitive advantage or operational eiciency will be gained? Assumptions The target user needs or wants the solution. The costs are predictable and controllable. Stakeholders will support H2IOSC also in the future. Technology or resources will be available and suicient. Data/information needs and resources To develop and support the value proposition, the following data is needed: Market data (demand, competition), Financial data (cost estimates, revenues), Stakeholder feedback (needs, expectations, pain points), Risk assessments (potential roadblocks, mitigation). Resources: mainly, technological and human resources. How is the KPI calculation carried out Stakeholder and service providers interviews; User journey mapping; Competitive analysis. Who is providing this information Stakeholder, project community, service providers, users, suppliers. Sources Survey Unit of measure Descriptive field Below is a description of the H2IOSC Value proposition investigated. The value proposition was explored within the cluster from various perspectives. First, it was surveyed of the project community at large, as stakeholders but also users of the infrastructure facilities participating in H2IOSC and their services (recurring responses: “More opportunities for collaboration between researchers and infrastructure” and “Simplified and shared access to research resources and data”). It was then strategically explored with the coordinators of the four national infrastructure nodes (some responses: “Extended partnership”, “Developing attractive and innovative services/new technologies”). It was then analyzed through surveys with the scientific community using
49 the services (some responses: “Updating on available resources “, “Complete and useful metadata for research purposes “) and with users of the services included in the TNA/NA calls (recurring responses: “Enabled access to advanced and reliable digital tools/resources provided by research infrastructures” and “Improved the quality or eiciency of our research processes and data with the help of H2IOSC technologies and expertise”). For a detailed analysis of the results, please refer to deliverable 1.4, which specifically addresses this aspect. However, it is the intention of the cluster management to maintain focus on this aspect by repeating questionnaires so as not to lose touch with the stakeholders' strategic vision and the needs of scientific and non-scientific users. KPI – Key services Indicator Key services Definition(s) Key services of H2IOSC are the essential activities and supports it provides to enable, enhance, or facilitate research. Rationale Enable external researchers and industry to use the infrastructure, often via open access or peer review. Assumptions Access must be equitable and transparent. H2IOSC can support external demand without disrupting internal research. Data/information needs and resources Category of services. Type of services free (standard services) and paid (value added services). Possible users, partners, competitors. Possible services request. Costs for equipment and dedicated sta. Possible fee for value added services. How is the KPI calculation carried out Service providers interviews; User/partner mapping; Competitive analysis. Who is providing this information Project community, service providers, users, suppliers. Industry. Sources Survey, benchmark analysis, network events. Unit of measure Descriptive field
50 Below is a description of H2IOSC Key Services. The following are the macro categories of services of the H2IOSC cluster catalogue. Technical services: digital infrastructures essential for research and data management, including solutions for secure storage, high-performance computing, AI-powered content analysis, and advanced ICT services to support processing, sharing, and interoperability of data within virtual and collaborative research environments. Data & Digital services: software, tools, datasets, and pilot projects addressing the needs of those involved in the study, management, and valorization of cultural, linguistic, and historical heritage, including tools for remote monitoring, diagnostics, data extraction and analysis, and digital fabrication. Research services: access to platforms (physical, digital, etc.) for carrying out scientific experiments/use of cutting-edge tools and equipment to support scientific excellence. Innovation services: synergies of existing tools and new innovative research capabilities. Training services: free self-paced courses and platforms for sharing and downloading open-access training materials, tailored for people involved in the humanities, social sciences, and heritage science, to strengthen interdisciplinary skills and the use of Research Infrastructures. With regard to the methods of access to H2IOSC services: Open access resources: access to these resources is free-of-charge. Value-added resources: for added-value resources and services (i.e.: services for scientific research and access to the technological infrastructure) a flexible model is used that considers dierent categories of users: 1. Users of the scientific network: access, granted on the basis of scientific excellence and the potential impact of the proposed research project, involving a selection process, requires the payment of a contribution to cover the costs of providing the service. 2. Private users: access is guaranteed by paying a fee required for the use of specific services or features that enrich the basic oer of the infrastructure, such as advanced features, specialized support or customized solutions that meet specific needs. The fees help to cover the costs of development, maintenance, support and provision of these services. Further details on these services, their potential partners/users/competitors, and access policies are provided in deliverable 1.4. It is important to note that the service categorization is the one identified in the project context. During the cluster's full operational phase, it may undergo changes both in the
51 type and number of services oered and in their possible combination, with a view to responding increasingly eiciently to interested parties' requests. KPI – Cost analysis Indicator Cost analysis Definition(s) Cost analysis refers to the identification, quantification, and evaluation of all cost elements related to the lifecycle of the H2IOSC. It includes capital investments, operational expenses, personnel costs, R&D and indirect costs, with the aim to ensure eicient resource allocation and long-term sustainability. Rationale Budget planning and allocation: Helps funders and managers understand the true cost of the cluster. Sustainability assessment: Ensures the cluster can operate long-term without financial risk. Decision support: Informs strategic choices. Eiciency monitoring: Identifies cost drivers and potential savings. Funding applications: Required by governments and institutions for justifying investment. Assumptions Cost analyses usually rely on a few key assumptions: Useful life of infrastructures (e.g., 20 years). Utilization rates of the infrastructure (how intensively it's used). Technological stability (i.e., pace of obsolescence). Staing models. Maintenance and replacement schedules for equipment. Data/information needs and resources Capital costs (investment done and to be done); Operating costs (Personnel, utilities, consumables, maintenance); Indirect costs. How is the KPI calculation carried out Data centers/platforms referents interviews, suppliers interviews. Who is providing this information Data centers/platforms referents, suppliers. Sources Survey
52 Unit of measure Number The values of the cost analysis are reported below. Cost categories Description Value 2026-2035 (kEuro) Investment costs The amount was esmated considering the 5 - year life cycle of the hardware (data center) equipment acquired with NRPP funds, in order to maintain the cluster's highperformance and cung-edge capabilies. For the data centers, it was therefore esmated that the same level of investment would be sustained at the end of the 5 years. For the plaorms acquired with NRPP funds, a diversified valuaon was applied, taking into account their complexity and technical specificies. 15.682 Running costs The amount was esmated considering the potenal maintenance and consumables costs, as well as ulies, for the first five years and ten years of the data centers, taking into account that these data centers (may) also consist of equipment previously acquired with non-NRPP funds, but whose maintenance was necessarily considered, for technical and funconal reasons, in conjuncon with the equipment acquired with project funds. The amount also includes technical support costs for the plaorms over the same period and, finally, the maintenance and consumables costs associated with the services listed in the catalogue. 27.396 R&D costs costs for research and development acvies that are planned to be outsourced to suppliers in order to ensure the efficiency and performance standards required of H2IOSC plaorms and services. Research and development acvies related to the data centers and most of the plaorms used are carried out by cluster 2.902
53 personnel, the cost of which is reported under "manpower costs" item. Manpower costs The amount was esmated based on an analysis of the manpower requirements for the cluster's management and operaons in the coming years. The analysis specifically considered the manpower required for the proper funconing of the data centers and plaorms used for the purposes of the H2IOSC cluster, as well as for the proper provision of the services listed in the catalogue. It takes into account permanent staff already employed in the aforemenoned acvies and temporary staff who may be hired to upgrade certain services, based on the projects won. 23.890 Overheads calculated as 7% of direct costs previous listed, to use the same percentage applied under the NRRP-funded project. 4.891 KPI – Revenues Indicator Revenues Definition(s) It refers to the income generated by the cluster from its operations, services, and other funding sources. Rationale Assess its financial sustainability. Inform policy decisions and funding strategies. Measure its economic impact and return on investment. Improve eiciency and planning for future development. Justify public funding by showing value generated. Assumptions Revenue includes public and private contributions, grants, and service fees. The cluster provides valuable outputs (data, technology, knowledge) that others are willing to pay for or support. Revenue generation does not necessarily imply profit motive.
54 Data/information needs and resources Revenue from services or user fees, National/international grants, Institutional funding How is the KPI calculation carried out Sum of the relevant sources Who is providing this information Management of the project Sources Annual financial statements, project budget allocation Unit of measure Number The values of the revenues and some concluding comments are reported below. Revenue categories Description Value 2026-2035 (kEuro) National Nodes Core budget This is constuted by Ordinary government funding (FOE). To be understood as financing of the "FOE a valenza internazionale", which is expected to be (partly) allocated for the reference period. This Core Budget serves the basic funding for H2IOSC operaon, ensuring the connuous funconing of its Nodes. Indeed, H2IOSC is sustained through indirect funding mechanisms, with financial resources provided via the naonal nodes, rather than through direct centralised allocaons. 3.400 EU research and naonal projects income To be understood as an esmated value based on the projects financed in the last 5 years (2019-2024), taking into account the fact that the trend of projects won in the recent period is confirmed. European research and naonal grants will provide addional funding for the development of specific H2IOSC acvies and/or services, and for future investments, both at the cluster level and at the Nodes level. 8.690 Service fee Forecast based on expected requests for access to technical, training and digital added-value services for which the payment of a contribuon or fee is expected, calculated taking into account the analysis of the 2.051
55 demand for services and the trend of services already operaonal requested. The contribuons and fees are requested to cover mainly the costs associated with making the same services available. Other revenues In order to ensure full coverage of the costs associated with the correct operaon of the naonal Nodes. Specifically, these funds include the FOE (Instuonal Fund) to cover the cost of permanent staff and ulies costs, as well as a revenue forecast for public-private partnerships that are planned to be acvated in the long term and for which networking acvies have been iniated during the project's life cycle. 60.620 Further details on costs, revenues and financial sustainability are provided in deliverable 1.4. It is important to take into account the assumptions made in the mentioned deliverable and the fact that the forecasts will necessarily have to be monitored and updated based on the progress of the cluster's activities, its services, and other contingent situations. 3.1.6 Performance Measurement and Assessment Dashboard The Performance Measurement and Assessment Dashboard is a comprehensive tool designed to track and evaluate the progress, performance, and impact of the H2IOSC project. It serves as a centralized plaorm that provides real-me insights into various aspects of the project's implementaon and outcomes. The dashboard incorporates key performance indicators (KPIs) and metrics aligned with the project's objecves, considering those defined by the project technical sheet, allowing stakeholders, including the Project decision-making structure, to monitor the project's performance against predetermined targets. Through the Performance Measurement and Assessment Dashboard, stakeholders can assess the effecveness and efficiency of the project’s acvies, idenfying areas of success and areas that require improvement. The Performance Measurement and Assessment Dashboard serves as a valuable decisionmaking tool, supporng stakeholders in making informed choices to ensure the project's success. It facilitates data-driven discussions, enables the idenficaon of trends and paerns, and provides a basis for evidence-based intervenons and adjustments to project implementaon strategies.
56 Overall, the Performance Measurement and Assessment Dashboard acts as a praccal resource, consolidang project knowledge and offering valuable support to stakeholders. It provides a comprehensive assessment of the project's implementaon condions, offering insights into its achievements, challenges, and areas for improvement. By leveraging the dashboard's funconalies, stakeholders can effecvely monitor and evaluate the H2IOSC project's progress, facilitang the aainment of project objecves and maximizing its impact in the field of humanies and cultural heritage research and innovaon. With the aim to support monitoring and evaluaon acvies within the H2IOSC project, as described in secons 5 (Monitoring) and 6 (Reporng) of D1.1, we report in the following the relevant Key indicators found for both procedural and financial progress of the project. KPI – Procedural progress of the project Indicator Number of days to fill in and sign checklist for recruitment (checklist 6) and for procurement (checklist 7); Number of days to upload checklist 6 and 7 on OwnCloud signed by the Director. Definition(s) They assess through the implementation of self - monitoring reviews for recruitment and procurement procedures have been completed at a given point in time, compared to a baseline or timeline. Rationale Ensure timely implementation of project activities. Monitor workflow, task completion, and administrative processes. Identify delays or deviations early for corrective action. Promote accountability among teams and stakeholders. Support resource planning and decision-making during project execution. Assumptions A clearly defined work plan or project schedule exists. Tasks and milestones are well-defined with assigned responsibilities. Delays and deviations can be quantified and investigated. Data/information needs and resources Project work plan and activity schedule, Milestone definitions and due dates. Records of task completions (checklists).
57 How is the KPI calculation carried out Use of tracking tools for data entry and monitoring. Who is providing this information Management and administrative sta. Sources CNR Owncloud and Sharepoint Workbook Unit of measure Number The values of the identified KPIs and some concluding comments are reported below. Procedural indicators (Number of days) BIM 4 BIM5 BIM6 BIM7 BIM8 BIM9 BIM10 BIM11 BIM12 BIM13 BIM14 BIM15 Procedural indicators for recruitment : Number of days for fill out and signature of the checklist 6 38,88 61,66 62,93 - Procedural indicators for procurement : Number of days for fill out and signature of the checklist 7 85,69 153,74 192,10 83,44 Procedural indicators: Number of days for fill out and signature of the checklist 6 and 7 BIM4 BIM5 BIM6 BIM7 BIM8 BIM9 BIM10 BIM11 BIM12 BIM13 BIM14 BIM15 Procedural indicators for recruitment : Number days to update checklist 6 in OwnCloud aer Director's signature 2,92 2,11 0,00 - Procedural indicators for procurement: Number days to update checklist 7 in OwnCloud aer Director's signature 1,67 0,00 0,00 0,00 As described in secon 6 (Reporng) of D1.1 and set out in the Procedural and Financial workflows, the checklists “Annex 6 for recruitment procedures” and “Annex 7 for procurement procedures” draed by the Ministry, were shared by the H2IOSC Financial Manager with the UOs. All the Instutes considered that the implementaon of self-monitoring reviews for recruitment and procurement procedures through the checklists was a valid tool. The Instutes considered this process essenal in order to ensure that the informaon and documentaon required for all procedures carried out was consistent and complete. However, the implementaon of self-assessment process required more me than expected,