The application of linear programming to a coal-mining problem: A case study
Abstract
EconStor is a publication server for scholarly economic literature, provided as a non-commercial public service by the ZBW.
Full text
Kle ck, W. G.; Tu ne , G. M.S.
A icle
The applica ion o linea p og amming o a coal-mining
p oblem: A case s udy
Sou h A ican Jou nal o Business Managemen
P o ided in Coope a ion wi h:
Uni e si y o S ellenbosch Business School (USB), Bell ille, Sou h A ica
Sugges ed Ci a ion: Kle ck, W. G.; Tu ne , G. M.S. (1985) : The applica ion o linea p og amming
o a coal-mining p oblem: A case s udy, Sou h A ican Jou nal o Business Managemen , ISSN
2078-5976, A ican Online Scien i ic In o ma ion Sys ems (AOSIS), Cape Town, Vol. 16, Iss. 1, pp.
46-48,
h ps://doi.o g/10.4102/sajbm. 16i1.1072
This Ve sion is a ailable a :
h ps://hdl.handle.ne /10419/217887
S anda d-Nu zungsbedingungen:
Die Dokumen e au EconS o dü en zu eigenen wissenscha lichen
Zwecken und zum P i a geb auch gespeiche und kopie we den.
Sie dü en die Dokumen e nich ü ö en liche ode komme zielle
Zwecke e iel äl igen, ö en lich auss ellen, ö en lich zugänglich
machen, e eiben ode ande wei ig nu zen.
So e n die Ve asse die Dokumen e un e Open-Con en -Lizenzen
(insbesonde e CC-Lizenzen) zu Ve ügung ges ell haben soll en,
gel en abweichend on diesen Nu zungsbedingungen die in de do
genann en Lizenz gewäh en Nu zungs ech e.
Te ms o use:
Documen s in EconS o may be sa ed and copied o you pe sonal
and schola ly pu poses.
You a e no o copy documen s o public o comme cial pu poses, o
exhibi he documen s publicly, o make hem publicly a ailable on he
in e ne , o o dis ibu e o o he wise use he documen s in public.
I he documen s ha e been made a ailable unde an Open Con en
Licence (especially C ea i e Commons Licences), you may exe cise
u he usage igh s as speci ied in he indica ed licence.
h ps://c ea i ecommons.o g/licenses/by/4.0/
The
applica ion
o
linea
p og amming
o
a
coal-mining
p oblem:
A
case
s udy
W.G.
Kle ck
School o Business Leade ship, Uni e si y o Sou h A ica, P e o ia
G.M.S.
Tu ne
Consul ing enginee
This a icle desc ibes he applica ion o linea p og amming o a
p oblem aced
by
a small coal-mining company. The company
owns wo ope a ing collie ies, one supplies he gene al inland
ade ma ke while he o he supplies a powe s a ion unde a
30-yea - ied con ac . The company was awa ded
an
expo
alloca ion o a 30-yea pe iod and
as
a esul was ying o
es ablish how o supply he coal o he a ious ma ke s. Only
he collie y ha supplied he powe s a ion
had
su icien
ese es o base
an
expo con ac on. I was unde lain by wo
economically eco e able seams o coal. The quali y o he coal
ese es is, howe e , low compa ed o in e na ional s anda ds
and is he e o e unaccep able
in
i s
aw
s a e. I is, howe e ,
possible o upg ade he coal by washing i . The g ade o he
inal p oduc ( loa ) can be adjus ed by al e ing he densi y o
washing. Howe e he yield,
as
a pe cen age o he
aw
coal
eed, alls
o
apidly
as
he g ade is inc eased. Fu he mo e he
sinks can likewise
be
upg aded by washing. The company
wonde ed how hey should op imize he lowshee . How much
coal should hey mine om each o he wo seams, how much
om each sou ce should go o he powe s a ion, how much
should hey p oduce o expo , how should he upg ading
be
done, and o wha ex en . A linea p og amming model was
o mula ed o sol e he p oblem acing he company.
S.
A .
J.
Bus.
Mgm . 1985,
16:
46-
48
Hie die a ikel besk y die geb uik
an
linee e p og amme ing
om
'n
spesi ieke p obleem
an
'n klein maa skappy
in
die s een-
koolbed y op e los. Die maa skappy besi wee s eenkoolmyne;
een bedien die binnelandse ma k e wyl die ande een
'n
k ag-
s asie
an
s eenkool oo sien olgens
'n
30-jaa -kon ak.
'n
Ui oe kon ak i
'n
pe iode
an
30
jaa is
aan
die maa skappy
oeges aan
en
as
ge olg hie an moes die maa skappy ass el
op
welke wyse die onde skeie ma k e oo sien moes wo d.
Slegs die s eenkoolmyn wa die k ags asie bedien he , he
genoeg s eenkool ese wes gehad om
aan
die ui oe kon ak e
oldoen. Die myn he wee ekonomieson ginba e s eenkoollae
gehad. Die kwali ei
an
die s eenkool ese wes is eg e laag in
e gelyking me in e nasionale s andaa de
en
die s eenkool
moe ge olglik e de e we k wo d. Die e we king geskied
deu die on ginde s eenkool e was
en
sodoende die kwali ei e
e hoog. Die kwali ei
an
die inale p oduk
kan
e ande wo d
deu die dig heid
an
die wasse y e e s el. Die opb engs,
ui ged uk
as
'n
pe sen asie
an
die inse , e minde innig
as
die g aad e hoog wo d. Die a oe (a al) kan ook opgeg adee
wo d deu di e was. Die maa skappy wou ass el hoe eel
s eenkool
an
elke s eenkoollaag gemyn moe wo d, hoe eel
an
elke laag
na
die k ags asie
en
hoe eel s eenkool
an
elke
laag
na
die ui oe ma k moe gaan.
Die
maa skappy wou ook
ass el wa die om ang
an
die opg ade ing moes wees.
'n
Linee e p og amme ingsmodel is geb uik om hie die p obleme
an
die maa skappy
op
e los.
S.-A .
Tydsk . Bed y sl.
1985,
16:
46
-48
W .G.
Kle ck*
School
o
Business Leade ship, Uni e si y
o
Sou h A ica,
P.O.
Box
392, P e o ia,
0001
Republic
o
Sou h A ica
G.M.S. Tu ne
Consul ing enginee , P e o ia
*To whom co espondence should be add essed
Accep ed Sep embe
1984
In oduc ion
This a icle desc ibes a p oblem aced by a small coal-mining
company, si ua ed in he eas e n T ans aal, Sou h A ica.
The
company owns wo ope a ing collie ies. The i s has a
p esen
capaci y
o
1 million ons pe annum and supplies he
gene al
inland ade ma ke . The second collie y supplies 3,6
million
ons pe annum o powe gene a ion unde a 30-yea - ied
con ac .
The company was ecen ly awa ded an expo alloca ion
o
a mos 2 million ons pe
annum
o a 30-yea pe iod.
As a esul he company was ying o de e mine wha
he
mos e icien me hod would
be
o supply he coal o he
a ious ma ke s.
Backg ound
o
he
s udy
Bo h
o
he company's collie ies a e unde lain
by
wo
economically eco e able coal-seams, he No. 2 seam and
he
No. 4 seam. The No. 5 seam, which has me allu gical p ope -
ies
sui able o he
s eel
indus y
is
no p esen
while
he
No.
1
and No. 3 seams a e oo hin o
be
economically eco e able.
The collie y ha supplies he inland ade ma ke has
limi ed
ese es and has been uled ou by he company
as
a
p oposi ion on which o base
an
expo collie y.
The collie y ha supplies he powe s a ion has subs an ial
ese es, in excess
o
wha
is
equi ed o he powe s a ion.
The powe s a ion supply con ac s ill has 30 yea s o un,
he same pe iod as he p oposed expo p ojec . In o ma ion
on
ese es and a e
o
exploi a ion we e ob ained and a e
shown in Table
1.
In addi ion o hese ese es he company has access o a
mini-pi p oposi ion. This could, i necessa y, supply an
addi ional 0,4 million ons pe
annum
o
he No. 4 seam
o
he du a ion
o
he p ojec .
Table 1 Rese es and a e
o
exploi a ion
Remaining eco e able
ese e (million
ons)
Requi ed li e (yea s)
Maximum
a e
o
exploi-
a ion/yea
(million
ons)
Quali y o Sou h A ican coal
No.
2
seam
No. 4 seam
90
30
3,0
99
30
3,3
Sou h A ican coal ese es a e gene ally
o
low quali y
by
in e na ional s anda ds and as such a e unaccep able o
s.
A .
J.
Bus.
Mgm .
1985,
16(1)
expo in hei aw s a e. In his pa icula case he quali y
o
he No. 2 seam
is
25,5
MJ/Kg
and
ha
o
he No. 4 seam
22,0
MJ/Kg,
while he minimum in e na ional-accep able
quali y
is
27
MJ/Kg.
(MJ/Kg
o
megajoules pe kilog am
is
a measu e
o
he hea con en
o
calo i ic alue
o
he coal.
The highe he hea con en he mo e accep able he coal.)
Howe e ,
i
is
possible o upg ade he coal by washing.
The aw coal
is
c ushed
and
hen ed in o a essel con aining
a hea y liquid medium. This sepa a es he coal in o wo
s eams, wi h pa
o
he coal loa ing and pa sinking. The
coal pa icles ha loa ha e a highe calo i ic alue han he
aw-coal eed, while he pa icles ha sink a e
o
a lowe
g ade. The g ade
o
he loa s can be adjus ed by al e ing
he densi y
o
washing. Howe e he yield, as a pe cen age
o
he aw-coal eed, apidly alls
o
as he calo i ic alue
is
aised,
and
he p ocess becomes uneconomical.
An analysis was done
o
he washing cha ac e is ics
o
he
company's coal.
The
esul s showed a e y poo yield o he
No. 4 seam
and
con i med ha i was no a p oposi ion o
upg ade his yield
o
expo -quali y coal. The No. 2 seam
in
con as showed good washing cha ac e is ics. The No. 2 seam
was es ed a wo di e en densi ies, o p oduce a
27
MJ/Kg
and a
28
MJ/Kg
loa p oduc (Table
2).
The company
doub ed he economics
o
he
28
MJ/Kg
p oduc because
o
low
yield.
Table
2 Yield
o
No. 2 seam
Densi y I Densi y 2
P oduc
quali y,
MJ/Kg
27
28
P oduc
yield ( loa s),
OJo
79
68
Sinks,
OJo
21
32
Sinks
quali y,
MJ/Kg
19,5
22,3
In he same way ha aw coal can be washed, he, sinks
can be upg aded by washing a a highe densi y in a second-
s age p ocess,
o
o m a middlings p oduc . The analysis
o
he washing cha ac e is ics
o
he second s age
is
showed in
Table
3.
The quali y
o
he disca ds om he second s age would
no be accep able o use
and
would ha e o be dumped.
The washing plan has a i s -s age eed capaci y
o
2,8
million ons pe
annum
wi h a second-s age capaci y
o
1,
1
million ons pe
annum
inpu .
Table
3 Analysis
o
second-s age washing
Feed quali y, MJ/Kg
Middlings yield,
OJo
Middlings
quali y,
MJ/Kg
Disca d,
OJo
Disca d
quali y,
MJ/Kg
The
powe -s a ion con ac
Densi y I
19,5
56
23,9
44
12
Densi y 2
22,3
75
25,I
25
12
When he c.:ompany o iginally ende ed o he powe -s a ion
supply
i
IJlanned o mine he No. 2 seam and he No.
_4
seam
o his ,u pose and blend hem oge he . (Coals
o
di e en
calo i ,V.:
alues can be blended linea ly.) The company had
ende ed o a minimum calo i ic alue
o
23
MJ
/Kg o he
47
li e
o
he s a ion. The powe s a ion had acco dingly been
designed o his minimum and he company
was
con ac ually
commi ed o supply his quali y. Any de e io a ion would
se e ely a ec powe -s a ion e iciency and ou pu and could
no be con empla ed.
P oduc ion
cos s
and
sales
e enue
The No. 4 seam
is
no as ha d bu hicke han he No. 2
seam and cos s R5,30/ on o mine compa ed o R7,50/ on
o he la e . The mini-pi mining cos s had been calcula ed
a R9,30/ on, including o e land anspo .
The cos
o
ope a ing he washing plan was es ima ed a
Rl,40/ on
o
eed o he plan wi h second-s age cos s a
R0,80/ on inpu .
On he e enue side he con ac ual p ice o eed o he
powe s a ion was R9,90/ on.
Expo coal could be sold o R40/ on FOB o he
27
MJ/Kg
p oduc . A e allowing o ailage, po , and handling
cha ges
o
Rl4,40/ on, his le he company wi h an income
o
R25,60/ on. Simila ly, o a
28
MJ/Kg p oduc he income
was calcula ed a R27, 70/ on.
Issues
acing
he
company
Al hough he No. 4 seam and mini-pi we e only sui able o
powe -s a ion eed, he No. 2 seam which had adi ionally
been sen o he powe s a ion o make up he equi ed
calo i ic alue, could now be washed a ei he
o
wo densi ies
o p oduce a
27
MJ/Kg
and/o
28
MJ/Kg
o expo , as
well
as being bypassed o he powe s a ion as be o e. The sinks
om ei he
o
hese ope a ions could be sen o he powe
s a ion
o
al e na i ely could be washed
in
he second s age
o upg ade he quali y, wi h he middlings ou ed o he powe
s a ion.
The company wonde ed how hey should go abou
op imizing he low-shee . How much coal should hey mine
om each
o
he No. 2 seam, No. 4 seam, and mini-pi ? How
much om each sou ce would go di ec ly o he powe
s a ion? How much should hey p oduce o expo and wha
quali y should be p oduced? To wha ex en should hey use
he second-s age washing p ocess, conside ing i s low yield?
Rese es did no appea o be a cons ain wi h a mining
capaci y
o
6, 7 million ons pe annum. Nei he did he
capaci y
o
he mine's sha
o
5,8 million ons pe annum
appea o be a cons ain . Bu would he washing plan be
big enough?
The
model
The p oblem
was
o mula ed as a linea p og amming model.
To o mula e he model a low cha
o
he 'mining
ope a ions' was d awn. This
is
shown
in
Figu e
1.
Decision a iables
The decision a iables appea on he low cha and a e:
S1 Tons mined pe annum om he mini-pi .
S2 -Tons mined pe annum om No. 4 seam.
S3 -Tons mined pe annum om No. 2 seam.
W1 -No. 2 seam ons pe annum o powe s a ion.
W2 -No. 2 seam ons pe annum o Washing S age
1,
Densi y
1.
W3 -No. 2 seam ons pe annum o Washing S age
l,
Densi y
2.
X1 -Tons
o
27
MJ/Kg
quali y expo ed pe yea .
X2 -Tons
o
28
MJ/Kg
quali y expo ed pe yea .
Y1 -Tons sinks pe annum om Washing S age
l,
Densi y 1 o Powe S a ion.
48
s.
(22.0
MJ/Kg)
s,
(22.0
MJ/Kg)
w.
No. 4
X,
seam
Wash
s,
w,
S age 1
Collie y No. 2 Densi y 1
Seam
(25,5
MJ/Kg)
x,
Y,
Sinks
0,21
'
Y,
Y,
Sinks
Middlings
0.56
Y,
Wash
S age 2
Densi y 1
S.-A . Tydsk . Bed y sl.
1985,
16(1)
P ( o al eed)
Powe
S a ion
0.44
Y,
Middlings
Expo
Minipi Wash 0,32
w,
Y,
Wash 0,75
Y,
S age 1 S age 2
Densi y 2 Densi y 2 0,25
Y,
Figu e
1
F1ow
diag am
o
mining ope a ions.
Y2 -Tons sinks pe annum om Washing S age
l,
Densi y 1 o Washing S age 2, Densi y I.
Y3 -Tons sinks pe annum om Washing S age
l,
Densi y 2 o Powe S a ion.
Y4 -Tons sinks pe annum om Washing S age
1,
Densi y 2 o Washing S age 2, Densi y 2.
P -To al eed o he powe s a ion.
The cons ain s o his p oblem e e o he maximum a e
o
exploi a ion, sha capaci y, ail con ac , expo con ac ,
washing-plan capaci y, powe -s a ion supply, and he g ade
cons ain o he powe -s a ion supply. These cons ain s as
well
as he objec i e unc ion a e
as
ollows:
Ma e ial
balance
S3
-
Wi
-
W2
-
W3
= 0
Xi -
0,
79
W2
= 0
0,21
W2
-
Yi
-
Y2
= 0
X2
-0,68
W3
= 0
0,32
W3
-
Y3
-
Y4
= 0
Si +
S2
+
W,
+
Yi
+ 0,56
Y2
+
Y3
+ 0,
75
Y4
-P = 0
Maximum
a e
o
exploi a ion
s.
~
0,4
S2
~
3,3
S3
~
3,0
Sha
capaci y
Si
+
S3
~
5,8
Rail
con ac
Xi +
X2
e;
1,0
Expo con ac
Xi +
X2
~
2,0
Washing-plan
capaci y
W2
+
W3
~
2,8
Y2
+
Y4
~
1,1
Powe -s a ion supply
P =
3,6
G ade
cons ain
powe s a ion
To al MJ p oduced
~
23
0
To al ons p oduced - '
i.e. 22,0 S1 + 22,0
S2
+ 25,5 W, + 19,5
Yi
+ 22,3
Y3
+ 23,9 (0,56
Y2)
+
25,1
(0,75
Y4)
e;
23(3,6)
Objec i e
unc ion
Maximize -9,3
S1
-5,3
S2
-7,5
S3
-1,4
W2
-1,4
W3
-0,8 Y2 -0,8 Y4 + 9,9 P + 25,6
Xi
+ 27,7
X2
Resul s
The solu ion ob ained om he model indica es ha he
company should mine 3 million ons pe annum om he No.
2
seam
and 2,5 million ons om he No. 4
seam
pe annum.
No hing should be mined om he mini-pi .
O
he 3 million
ons mined om he No. 2 seam app oxima ely 0,5 million
ons should be sen di ec ly o he powe s a ion and 2,5
million ons o he washing plan whe e Densi y-2 washing
will
be applied. App oxima ely
1,
7 million ons
o
his 2,5
million ons
will
be expo ed, he quali y being
28
MJ/Kg.
Du ing S age 2
o
he washing plan 0,8 ons
will
be p ocessed.
O
he 0,8 ons app oxima ely 0,6 ons
will
be
ou ed o he
powe s a ion. The a e age quali y
o
he coal supplied o
he powe s a ion
is
23
MJ/Kg.
The o al yea ly income
ecei ed by ollowing his solu ion
is
R42,9 million.
Wi h he excep ion
o
he powe s a ion g ade cons ain
and he No. 2
seam
a e
o
exploi a ion cons ain all he
cons ain s ha e slack; indica ing ha he capaci ies
o
he
sha , wo king plan , e c. a e su icien .
Acco ding o he solu ion he company should supply l, 7
million
o
he 2 million ons expo con ac . The eason
being
ha he No. 2 seam maximum a e
o
exploi a ion cons ain
is
binding and he expo con ac
is
only supplied om his
seam. I he company wan s o inc ease he onnage on he
expo con ac
i
will
ha e o conside i s 'policy
on
he
maximum a e
o
exploi a ion.
Conclusion
'
'
This case s udy desc ibed he applica ion ·~ linea
p og amming o a small coal-mining p oblem and i )us a ed
how linea p og amming can assis he manageme H..
o
he
company o sol e a easonable complex p oblem.