scieee AI-readable full text Open interactive document viewer

An agile standardized work procedure for cleaning the operating room

Claudio, David,Cosgriff, Virginia,Nino, Valentina,Valladares, Leonardo

Abstract

EconStor is a publication server for scholarly economic literature, provided as a non-commercial public service by the ZBW.

Full text

Claudio, David; Cosgriff, Virginia; Nino, Valentina; Valladares, Leonardo Article An agile standardized work procedure for cleaning the operating room Journal of Industrial Engineering and Management (JIEM) Provided in Cooperation with: The School of Industrial, Aerospace and Audiovisual Engineering of Terrassa (ESEIAAT), Universitat Politècnica de Catalunya (UPC) Suggested Citation: Claudio, David; Cosgriff, Virginia; Nino, Valentina; Valladares, Leonardo (2021) : An agile standardized work procedure for cleaning the operating room, Journal of Industrial Engineering and Management (JIEM), ISSN 2013-0953, OmniaScience, Barcelona, Vol. 14, Iss. 4, pp. 701-717, https://doi.org/10.3926/jiem.3440 This Version is available at: https://hdl.handle.net/10419/261775 Standard-Nutzungsbedingungen: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Zwecken und zum Privatgebrauch gespeichert und kopiert werden. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich machen, vertreiben oder anderweitig nutzen. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, gelten abweichend von diesen Nutzungsbedingungen die in der dort genannten Lizenz gewährten Nutzungsrechte. Terms of use: Documents in EconStor may be saved and copied for your personal and scholarly purposes. You are not to copy documents for public or commercial purposes, to exhibit the documents publicly, to make them publicly available on the internet, or to distribute or otherwise use the documents in public. If the documents have been made available under an Open Content Licence (especially Creative Commons Licences), you may exercise further usage rights as specified in the indicated licence. https://creativecommons.org/licenses/by-nc/4.0/ Journal of Industrial Engineering and Management JIEM, 2021 – 14(4): 701-717 – Online ISSN: 2013-0953 – Print ISSN: 2013-8423 https://doi.org/10.3926/jiem.3440 An Agile Standardized Work Procedure for Cleaning the Operating Room David Claudio1, Virginia Cosgriff2, Valentina Nino2, Leonardo Valladares2 1University of MassachusettsLowell (United States) 2Montana State University (United States) [email protected], [email protected], [email protected], [email protected] Received: December 2020 Accepted: July 2021 Abstract: Purpose: This research aimed to reduce the turnover time (non-operative time) in the operating room (OR) at a US Northwestern hospital. Design/methodology/approach: Data collection consisted of observation and interviews of the aides, circulating nurses, and surgical techs to identify causes of delays and long turnovers. It was determined that the turnover could be divided into two stages: cleaning the room and setting up for the next surgery. The research team met with the staff (aides) to create a standard operating procedure for the cleaning stage. It was decided to create an agile standard procedure that would allow the process to be completed the same way effectively with any number of people ranging from 1 to 3. The flexibility accounts for the number of people who are to complete the procedure and considers that some of them are only available during portions of the cleaning stage due to multiple turnovers or duties. Findings: The agile cleaning procedure reduced the cleaning time by 2.2 minutes (15.7% of the total time) and the standard deviation by 3.30 minutes. A decrease in variability represents more consistent turnovers, creating more predictable times for scheduling surgeries in the future. Originality/value: This research proposes a novel approach to standardized work that quickly adapts to the number of workers available. The agile standardized work procedure (ASWP) allows the process to be completed the same way every time effectively with any number of people. Keywords: operating room, agile standardized work procedure, agile, lean healthcare, turnover To cite this article: Claudio, D., Cosgriff, V., Nino, V., & Valladares, L. (2021). An Agile Standardized Work Procedure for Cleaning the Operating Room. Journal of Industrial Engineering and Management, 14(4), 701-717. https://doi.org/10.3926/jiem.3440 1. Introduction Operating Rooms (ORs) generate the largest revenue and losses in a hospital (Cima, Brown, Hebl, Moore, Rogers, Kollengode et al., 2011; Fogliatto, Anzanello, Tonetto, Schneider & Muller Magalhães, 2020; Koyle, AlQarni, Odeh, Butt, Alkahtani, Konstant et al., 2018). Without the prompt cleaning and set-up of the operating suites, the OR would not be able to start surgeries on-time or conduct as many surgeries in its busy schedule. One aspect of OR -701- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 cost, which does not create revenue is the turnover or turnaround time. Turnover time is the time interval from when the patient exits the room until the next patient enters the room (Worley & Doolen, 2011). It includes the time it takes for cleaning and preparing a room for the next surgery. According to our partner hospital’s data, the cost of running an OR is approximately $33 per minute. When a patient is in the room, the hospital charges the patient or insurance, making up the operating costs. However, the time between surgeries is an opportunity cost translated into money not earned by the hospital. Therefore, the goal is to minimize the average time and the standard deviation for turnovers. Decreasing the turnovers could decrease time and cost and increase OR availability for additional surgeries. Simultaneously, a decrease in standard deviation is a good indicator of precision within a process. On the other hand, processes with a lack of stability are almost impossible to improve because they behave differently every day. Therefore, any representation of the process will not match the real condition (Dal Forno, Pereira, Forcellini & Kipper, 2014). Consequently, creating predictable turnovers could increase patient and staff satisfaction if everything is running on time. One way to achieve precision in processes is through the use of standardized work procedures. Standardized work can be defined in many ways; Krichbaum (2008) defines it as “a detailed and documented system in which production workers both develop and follow a repeatable sequence of tasks within a work assignment.” The standardized work sequence represents the best-known way to complete a task for the operator to follow in the completion of his/her job. Standardization is important as it serves to maintain order and consistency in operations (Freivalds, 2009). Fireman, Saurin and Formoso (2018) added that standardized work aims to reduce process variation and set the baseline for continuous improvement. Graban (2012) describes standardized work as “the current best way to safely complete an activity with the proper outcome and the highest quality, using the fewest possible resources.” Many researchers have reported the benefits of standardized work in healthcare operations (Bakken, Cimino & Hripcsak, 2004; Lehmann & Miller, 2004; Pérez & Porres, 2010; Simpson, 2009). However, Akmal, Greatbanks and Foote (2020) recently found that while many researchers have applied different Lean tools and techniques in healthcare, only 4% out of 299 articles mentioned some sort of standardization. Their findings indicate that standardized work has not been documented well in healthcare, let alone in ORs. Some researchers have argued that healthcare should create and implement more standardized procedures (Lehmann & Miller, 2004). Other benefits of standardized work include the documentation of current processes, variability reduction, training of new operators, and a baseline for improvements (Marchwinski & Shook, 2008). Lehmann and Miller (2004) state that “standardization reduces variation in clinical treatment and patient outcome and thus improves the quality of patient care, making it safer as well by reduction of potential errors.” For this research, standardized work refers to finding the optimal way to complete a task or activity each time the activity is performed. Similarly, standardization is defined in this work as the process to develop standardized work. The turnover process consists of two parts: cleaning the room and preparing it for the next surgery. This research focused on creating standardized work procedures for the cleaning portion of OR turnovers. Figure 1 presents a swim lane chart of all activities and entities involved in turning a room at the partner hospital. The times presented are averages from historical data and direct observations. The entire turnover process is encapsulated in the red dotted line while the cleaning portion is circled in a yellow line.) Figure 1. Staff interactions during a turnover -702- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 One difficulty presented in this study was the fact that OR aides, who were the people in charge of cleaning the suites, would come in and out of a room at different times. For example, three people were cleaning a room in some instances, and two would leave because another room needed cleaning. In other instances, only one person was cleaning, and a second would come in to help. Sometimes a third would join a few minutes later. This variability in the number of people at any point in time made it difficult to establish a standardized work procedure in its traditional fashion. For this reason, we decided to create a standardized work procedure that could be flexible enough to account for an unspecified number of staff members in the room. We proposed a novel approach to standardized work that quickly and easily adapts to the number of workers available. The agile standardized work procedure (ASWP), which focused on the cleaning portion of turnovers, allows the process to be completed the same way every time effectively with any number of people. Furthermore, the number of people cleaning a room can change during the process and still accomplish the same tasks, making this a novel way to look at operations. A comprehensive literature review using a strategy similar to the one presented by Vest, Gamm, Oxford, Gonzalez and Slawson (2010) was conducted to search for articles proposing anything similar to agile standardized work. The literature search, as seen in Figure 2, consisted of eleven keywords and four databases: Cinahl, Web of Science, Inspec, and Compendex. The keywords included terms such as agile standardized work, flexible standard work, dynamic standardized work, varying number of people for a standard procedure, standardized work varying people, among others. Figure 2. Agile Standardized Work Literature Search -703- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 The initial search results were reduced by only English documents, using classification codes, vocabulary, and additional keywords: procedure and healthcare. Two articles, one by de Mast, Kemper, Does, Mandjes and van der Bijl (2011) and another by Reichert, Dadam and Bauer (2004), were the closest to this type of procedure in the search performed. Both articles are simulation articles that allow for flexibility in resources and scheduling. However, de Mast et al. (2011) simulated patient flows and gave an example of the computerized tomography (CT) scan process. The simulations allow for flexibility, but not as a standardized work procedure, such as the one created in this research. Poth and Wolf (2017) talked about agile procedures, although they focus their work on the field of Agile Software Development. Recently, Agile methods have been extensively used in a wide variety of projects in many organizations since they allow organizations to be more responsive to changes and deliver products in faster, better, and cheaper ways (Carroll, Bjørnson, Dingsøyr, Rolland & Conboy, 2020; Chkouri, 2019; de Oliveira Rosa & Goldman, 2020; Dingsøyr, Dybå, Gjertsen, Jacobsen, Mathisen, Nordfjord et al., 2019; Iivari & Iivari, 2011; Jabar, Ali, Jusoh, Abdullah & Mohanarajah, 2019; Sommer, 2019). The agile way of working has been focused on accelerating digital products with some applications in product manufacturing (Kumar, Singh & Jain Sanjiv, 2019a, 2019b; Lokhande & Sarode, 2020). However, it has not explored the generation of standardized procedures that contemplated variation on the execution based on resources’ temporal availability. To the best of the authors’ knowledge, this is the first type of study that proposes an agile or flexible standard work procedure. 2. Materials and Methods The research study was performed at the OR of a medium-size hospital. The hospital is a medium volume Acute Care facility, with 86 beds and over 2,000 employees, of which 200 are physicians. The health professionals cover over 35 specialties and compose more than 20 clinics. It has seven surgical suites (6 surgery + 1 procedure room), Labor and Delivery department, Emergency Department, Diagnostic & Treatment areas, and associated on-site clinical programs. The operating rooms work five days a week from 6:30 am to 4 pm according to daily surgical schedules and have staff and doctors on call 24-7. There were five OR aides, and two pairs work together most often due to the times that they were scheduled to work. The aides worked a staggered schedule working for an 8-hour shift starting at 6:30 am, 8 am, 10 am, 12noon, and 2 pm. One type of surgery was chosen to collect accurate data for the research study. The type of surgery needed to occur often enough that it was easy to collect data. This would allow more standard observations when taking data and the opportunity to test the procedures. Orthopedic cases with total knee or hip arthroplasty (also known as totals or replacements) and revisions were chosen due to the number of instruments in use and the frequency of occurrence. These surgeries occurred at least ten times a week by five surgeons who performed these procedures, two of which performed total knee and hip procedures exclusively. Observations and analysis of the current tasks occurred during the first two months of the study. Times were taken during months three and four. According to Freivalds (2009), if the cycle time for a process is between 10-20 minutes, the recommended number of cycles for data collection is eight. Given that the length of time of the cleaning portion of the turnovers ranged from around 13.55 minutes to 25 minutes, it was decided to do 12 timed observations. Four of the five OR aides were observed cleaning and performing OR aide duties during the turnovers. The number of people in the room ranged from 1-4 depending on availability for the turnover because multiple turnovers can occur simultaneously. Spaghetti diagrams were drawn for the aides. A spaghetti diagram (SD) is a technique used to observe an object or person’s movement within a system. It is a visual representation that uses a continuous flow line tracing the person’s path or object through a process. This tool allows the process team to identify opportunities to expedite process flow and redundancies in the workflow (Gladysz, Santarek & Lysiak, 2017; Senderska, Mares & Vaclav, 2017). The processes SDs did not show as much waste. However, it did show the interaction and confusion of having too many people helping. -704- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 We also used the Critical Path Method (CPM) to find out the shortest possible time according to times taken from the observations and precedence of different activities. CPM is a project management technique that is widely used in construction projects. It breaks the project into work tasks and defines logical relationships between them. The tasks are presented in a diagram, and the project duration is calculated based on each task duration. This method defines the tasks that are critical to complete the project and identifies the longest path (the critical path) (Olivieri, Seppänen, Alves, Scala, Schiavone, Liu et al., 2019; Zareei, 2018). Prior to CPM, the prediction was that the cleaning time is best done by two people and cannot be faster than 12 minutes. In collaboration with the aides, the researchers created an agile way of cleaning, which accounted for the variability in the number of people cleaning the room. The ASWP would ideally make the time 12 minutes with two people. Each of the two people starts with specific tasks, the first done from their tasks grabs the mop, while the other will start prepping the room once they are done with their tasks. Whoever is done from the second round of tasks will take care of resetting or changing the Neptune and putting kick bucket bags. Before leaving the room, at least one of them should do the final check, if not both. Two versions of the same ASWP were created: a detailed ASWP and a concise ASWP. The detailed ASWP consisted of many pictures and a descriptive narrative of tasks in the procedure, whereas the concise ASWP contained minimal pictures and as few words/phrases as needed. An experiment to compare both ASWP was performed to determine which one was more appropriate. Metrics of interest were the cleaning completion time and adherence to the ASWP. 3. Results 3.1. Current State The cleaning process starts when a turnover is called (overhead or by a paging system) and ends when the last person cleaning leaves the room, as shown in figure 1. The researchers timed past the point when the last aide or helper left the room because sometimes, they were called back in to get something from the store or supply room. A Current State Value Stream Map (VSM) (Rother & Shook, 1999) was developed for the OR cleaning procedure (Figure 3). VSM is one of the most valuable tools to understand the current process status better and recognize opportunities for improvements (Dal Forno et al., 2014). From the Current State VSM, it can be seen that a few activities need prior activities to be completed before they can begin (precedence). It also shows that there are quite a few activities that can happen in parallel. According to the Association of Registered OR Nurses (AORN, 2012), the precedence of tasks in cleaning an OR are: 1. Nothing can be cleaned until the patient leaves the room. 2. Everything must be cleared from the bed and tables before cleaning with vindicator 3. A top-down approach must be used so that if contamination falls down, the objects below have not been sterilized yet, thus not contaminating anything else. Therefore, the lights must be cleaned before the bed and the bed and tables must be cleaned before mopping. 4. The new circuit cannot be put onto the anesthesia machine until the room is sterile. 5. Linens cannot be put onto the bed until the room is sterile to eliminate a chance of contamination. 6. Sterile supplies cannot be opened until the linens have stopped moving in case particles are in the air and contaminate the sterile field/supplies. 7. The contents of the Neptune and kick-bucket bags do not hold-up the turnover as mopping does, so they are saved for last while other activities (such as opening supplies) are happening. However, the Neptune and kick-buckets will need to be wiped off contamination during the first stage of wiping everything with vindicator. -705- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 Given the instructions recommended by the AORN and the tasks delineated by the VSM, a precedence diagram was created and analyzed using the Critical Path Method (CPM). Figure 4 presents the CPM for cleaning. The CPM shows three paths according to the fastest, average, and slowest timeseach depicted by a different color. This method showed that the fastest a room could be cleaned, on average, was 12.2 minutes. The number of paths in the CPM showed that the maximum number of people cleaning a room should not exceed three at any point in time. A modified version of the critical path for cleaning, seen in Figure 5, assumes that nothing can start until all the trash and linens are removed from the items needing to be cleaned. According to the possible paths that can be taken, the CPM shows that if four people were cleaning, there would not be enough for the fourth person to do according to tasks’ precedence. Figure 3. OR Aide Current State Value Stream Map Figure 4. CPM for the original cleaning method -706- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 Figure 5. CPM modified with trash and linens assumption 3.2. Root Cause Analysis A root cause analysis was performed with the OR aides, nurses, and staff. Figure 6 presents a fishbone diagram (Ishikawa & Loftus, 1990) created to identify reasons for the lengthy turnover times. From the figure, it can be seen that there were a lot of opportunities for improvement. Nevertheless, we decided to focus on the process category as many of the causes were triggered primarily by lack of standardization and lack of communication. We circled with a red dotted line the causes or reasons we wanted to tackle by creating a Standardized Work Procedure. As previously mentioned, the task at hand was not simplistic since the number of aides available to clean a room could change even after the cleaning process had started. Figure 6. Fishbone diagram of the OR turnover process -707- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 3.3. Countermeasure: Agile Standardized Work Procedure for Cleaning the Operating Room A team of OR aides and the research team agreed that a standardized work procedure would allow cleaning the rooms the same way every time. This would help with the lack of communication, lack of role assignment, lack of standards, and could be used as a training tool for new aides. Besides, by knowing exactly what is needed and when it is needed, the aides would reduce the number of visits to the local inventory, reducing excessive walking. However, the standardized work procedure needed to quickly and easily adapt to the number of aides available at any point in time. We organized a Kaizen Event (Gonzalez-Aleu, Van Aken-Eileen, Cross & Glover-Wiljeana, 2018; Marin-Garcia, Juarez-Tarraga & Santandreu-Mascarell, 2018) in collaboration with the aides where we created an agile way of cleaning which accounted for the unpredictable number of people available. Using the Current State VSM and the CPM diagram, the proposed ASWP was developed by clustering tasks that had precedence (serial tasks) in groups and creating parallel streams of those groups (parallel tasks) while preserving the required precedence between and within groups. Figure 7a presents the Kaizen Event intended to create the ASWP. Figure 7b presents the first iteration in which tasks were allocated to different groups while preserving the required precedence. Figure 7c presents the final iteration, which resulted in a more efficient grouping of tasks. Two aides led this last iteration. (a) (b) (c) Figure 7. a) Kaizen team working on redistribution of tasks for ASWP; b) First iteration; c) Second and final iteration The proposed ASWP would ideally reduce the cleaning time under 12 minutes with two people. Each person starts with specific tasks, the first done from their tasks grabs the mop, while the other starts prepping the room once they are done with their tasks. Whoever is done first with the second round of tasks takes care of resetting or changing the Neptune and putting kick bucket bags. Before leaving the room, at least one of them performs a final check, if not both. After the Kaizen team created the ASWP, we came up with a visual representation so that everyone could read it. Two versions of the ASWP were created, one with many pictures and a descriptive narrative of tasks in the procedure (detailed), and one with minimal pictures and few words/phrases as needed (concise). We used visual management tools such as color-coding, numbers, and a visual algorithm to denote what needs to take place next. Figures 8 and 9 present the detailed and concise ASWP, respectively. The pictures for the procedures were taken during actual turnovers. Permission was given by the OR manager and staff as long as they did not show any patient identifiers. The two procedures were designed for 11”x17” paper to allow details to be viewed. -708- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 procedure that did the same thing every time would help them create a safer environment for their patients. It wasn’t just about money anymore, like they had heard their manager discuss multiple times; they were making a difference for their patients by following this new procedure. After the implementation of the ASWP, the hospital noted a slight decrease in infection rates. We cannot claim that the ASWP directly improved the infection rates as multiple factors could influence a patient’s outcome. However, we can at least say that the ASWP did not have a negative effect on the infection rates of patients. 5. Conclusion This research looked at how an agile standardized work procedure (ASWP) for the turnover cleaning stage in the OR decreases the time and standard deviation and works across all types of surgeries’ turnovers. ASWP refers to allowing the process to be completed the same way every time effectively with any number of people ranging from 1 to 3. The flexibility not only accounts for the number of people who are to complete the procedure but also considers that some of them are only available during portions of the cleaning stage due to multiple turnovers or duties. A standard deviation decrease was the first sign of the improvements affecting everyday activities and turnover times. This means that if the standard deviation of the entire turnover can be decreased, not just the cleaning, the schedule will become more accurate because turnovers are only scheduled for specific amounts of time, depending on the surgery. The cleaning ASWP is only one step, but if the entire turnover can become predictable, new turnover times for the schedule can be made to help scheduled surgeries occur on time. This research work presents how an issue was resolved successfully for all types of surgeries at one hospital. Future research should focus on replicating an agile standardized work procedure in different contexts and comparing whether the results converge or diverge with those of this work. Declaration of Conflicting Interests The authors declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. Funding The authors received no financial support for the research, authorship, and/or publication of this article. References Akmal, A., Greatbanks, R., & Foote, J. (2020). Lean thinking in healthcare – Findings from a systematic literature network and bibliometric analysis. Health Policy, 124(6), 615-627. https://doi.org/10.1016/j.healthpol.2020.04.008 AORN (2012). 2012 Perioperative Standards and Recommended Practices: For Inpatient and Ambulatory Settings. AORN, Inc. Bakken, S., Cimino, J.J., & Hripcsak, G. (2004). Promoting Patient Safety and Enabling Evidence-Based Practice Through Informatics. Medical Care, 42(2), II-49-II-56. https://doi.org/10.1097/01.mlr.0000109125.00113.f4 Carroll, N., Bjørnson, F.O., Dingsøyr, T., Rolland, K.H., & Conboy, K. (2020). Operationalizing agile methods: examining coherence in large-scale agile transformations. Paper presented at the International Conference on Agile Software Development. https://doi.org/10.1007/978-3-030-58858-8_8 Chkouri, M.Y. (2019). Integrate and Apply the Recommendation System of Agile Methods. Paper presented at the International Conference on Advanced Intelligent Systems for Sustainable Development. Cima, R.R., Brown, M.J., Hebl, J.R., Moore, R., Rogers, J.C., Kollengode, A. et al. (2011). Use of Lean and Six Sigma Methodology to Improve Operating Room Efficiency in a High-Volume Tertiary-Care Academic Medical Center. Journal of the American College of Surgeons, 213(1), 83-92. https://doi.org/10.1016/j.jamcollsurg.2011.02.009 Dal Forno, A.J., Pereira, F.A., Forcellini, F.A., & Kipper, L.M. (2014). Value Stream Mapping: a study about the problems and challenges found in the literature from the past 15 years about application of Lean tools. The International Journal of Advanced Manufacturing Technology, 72(5-8), 779-790. https://doi.org/10.1007/s00170-014-5712-z -715- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 de Mast, J., Kemper, B., Does, R.J.M.M., Mandjes, M., & van der Bijl, Y. (2011). Process improvement in healthcare: overall resource efficiency. Quality and Reliability Engineering International, 27(8), 1095-1106. https://doi.org/10.1002/qre.1198 de Oliveira Rosa, T., & Goldman, A. (2020). Is It Possible to Apply Agile Methods to Contribute to the Linux Kernel? Paper presented at the International Conference on Agile Software Development. https://doi.org/10.1007/978-3030-58858-8_30 Dingsøyr, T., Dybå, T., Gjertsen, M., Jacobsen, A.O., Mathisen, T.E., Nordfjord, J.O. et al. (2019). Key lessons from tailoring agile methods for large-scale software development. IT Professional, 21(1), 34-41. https://doi.org/10.1109/MITP.2018.2876984 Fireman, M.C., Saurin, T.A., & Formoso, C.T. (2018). The role of slack in standardized work in construction: An exploratory study. Paper presented at the Proceedings of the 26th Annual Conference of the International Group for Lean Construction. https://doi.org/10.24928/2018/0213 Fogliatto, F.S., Anzanello, M.J., Tonetto, L.M., Schneider, D.S., & Muller Magalhães, A.M. (2020). Lean-healthcare approach to reduce costs in a sterilization plant based on surgical tray rationalization. Production Planning & Control, 31(6), 483-495. https://doi.org/10.1080/09537287.2019.1647366 Freivalds, A. (2009). Niebel’s methods, standards, and work design. Boston, MA.: McGraw-Hill Higher Education. Gladysz, B., Santarek, K., & Lysiak, C. (2017). Dynamic spaghetti diagrams. A case study of pilot RTLS implementation. Paper presented at the International Conference on Intelligent Systems in Production Engineering and Maintenance. https://doi.org/10.1007/978-3-319-64465-3_24 Gonzalez-Aleu, F., Van Aken-Eileen, M., Cross, J., & Glover-Wiljeana, J. (2018). Continuous improvement project within Kaizen: critical success factors in hospitals. The TQM Journal, 30(4), 335-355. https://doi.org/10.1108/TQM12-2017-0175 Graban, M. (2012). Lean hospitals: improving quality, patient safety, and employee engagement. CRC press. Iivari, J., & Iivari, N. (2011). The relationship between organizational culture and the deployment of agile methods. Information and Software Technology, 53(5), 509-520. https://doi.org/10.1016/j.infsof.2010.10.008 Ishikawa, K., & Loftus, J. (1990). Introduction to quality control, 3A Corporation. Tokyo, Japan. Jabar, M.A., Ali, N.M., Jusoh, Y.Y., Abdullah, S., & Mohanarajah, S. (2019). Adaptive and Dynamic Hybrid Model for Software Project Management: A Review on its Clarity and Usage to Improve Project Success. Paper presented at the Applied Mechanics and Materials. https://doi.org/10.4028/www.scientific.net/AMM.892.38 Koyle, M.A., AlQarni, N., Odeh, R., Butt, H., Alkahtani, M.M., Konstant, L. et al. (2018). Reduction and standardization of surgical instruments in pediatric inguinal hernia repair. Journal of Pediatric Urology, 14(1), 20-24. https://doi.org/10.1016/j.jpurol.2017.08.002 Krichbaum, B.D. (2008). Standardized Work: Creating Continuous Flow. Available at: www.processcoachinginc.com/Forms/Standardized%20Work.ppt Kumar, R., Singh, K., & Jain Sanjiv, K. (2019a). Agile manufacturing: a literature review and Pareto analysis. International Journal of Quality & Reliability Management, 37(2), 207-222. https://doi.org/10.1108/IJQRM-12-2018-0349 Kumar, R., Singh, K., & Jain Sanjiv, K. (2019b). Development of a framework for agile manufacturing. World Journal of Science, Technology and Sustainable Development, 16(4), 161-169. https://doi.org/10.1108/WJSTSD-05-2019-0022 Lehmann, C.U., & Miller, M.R. (2004). Standardization and the Practice of Medicine. Journal of Perinatology, 24(3), 135-136. https://doi.org/10.1038/sj.jp.7211060 Lindsay, C.F., Kumar, M., & Juleff, L. (2020). Operationalising lean in healthcare: the impact of professionalism. Production Planning & Control, 31(8), 629-643. https://doi.org/10.1080/09537287.2019.1668577 Lokhande, S.P., & Sarode, A.D. (2020). Identification & Prioritization of Agile Manufacturing Enablers for Small and Medium Scale Industries. IOP Conference Series: Materials Science and Engineering (810, 012034). https://doi.org/10.1088/1757-899X/810/1/012034 -716- Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3440 Marchwinski, C., & Shook, J. (2008). Lean lexicon: a graphical glossary for lean thinkers (4th ed.). Lean Enterprise Institute. Marin-Garcia, J.A., Juarez-Tarraga, A., & Santandreu-Mascarell, C. (2018). Kaizen philosophy: The keys of the permanent suggestion systems analyzed from the workers’ perspective. The TQM Journal, 30(4), 296-320. https://doi.org/10.1108/TQM-12-2017-0176 Nino, V., Claudio, D., Valladares, L., & Harris, S. (2020). An Enhanced Kaizen Event in a Sterile Processing Department of a Rural Hospital: A Case Study. International Journal of Environmental Research and Public Health, 17(23), 8748. https://doi.org/10.3390/ijerph17238748 Olivieri, H., Seppänen, O., Alves, T.d.C., Scala, N.M., Schiavone, V., Liu, M. et al. (2019). Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques. Journal of Construction Engineering and Management, 145(12), 04019077. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001644 Pérez, B., & Porres, I. (2010). Authoring and verification of clinical guidelines: A model driven approach. Journal of Biomedical Informatics, 43(4), 520-536. https://doi.org/10.1016/j.jbi.2010.02.009 Poth, A., & Wolf, F. (2017). Agile procedures of an automotive OEM–views from different business areas. Paper presented at the European Conference on Software Process Improvement. https://doi.org/10.1007/978-3-319-64218-5_42 Randolph, S. (2006). Developing Policies and Procedures. AAOHN Journal, 54(11), 501-504. Available at: https://search.proquest.com/docview/219334086?pq-origsite=gscholar&fromopenview=true https://doi.org/10.1177/216507990605401104 Reichert, M., Dadam, P., & Bauer, T. (2004). Dealing with forward and backward jumps in workflow management systems. Informatik Forschung und Entwicklung, 18(3-4), 132-151. https://doi.org/10.1007/s00450-004-0157-5 Rother, M., & Shook, J. (1999). Learning to See. Brookline, MA: Lean Enterprise Institute. Inc.. Senderska, K., Mares, A., & Vaclav, Š. (2017). Spaghetti Diagram Application For Workers’movement Analysis. UPB Scientific Bulletin, Series D: Mechanical Engineering, 79(1), 139-150. Simpson, K.R. (2009). Standardization. MCN: The American Journal of Maternal/Child Nursing, 34(1), 72. https://doi.org/10.1097/01.NMC.0000343877.56097.e3 Sommer, A.F. (2019). Agile Transformation at LEGO Group: Implementing Agile methods in multiple departments changed not only processes but also employees’ behavior and mindset. Research-Technology Management, 62(5), 20-29. https://doi.org/10.1080/08956308.2019.1638486 Vest, J.R., Gamm, L.D., Oxford, B.A., Gonzalez, M.I., & Slawson, K.M. (2010). Determinants of preventable readmissions in the United States: a systematic review. Implementation Science, 5(1), 88. https://doi.org/10.1186/17485908-5-88 Worley, J.M., & Doolen, T.L. (2011). Turnovers and Turnarounds in the Healthcare System. In Yih, Y. (Ed.), Handbook of healthcare delivery systems (1st ed.). Boca Raton: CRC Press. Zareei, S. (2018). Project scheduling for constructing biogas plant using critical. Renewable and Sustainable Energy Reviews, 81(1), 756-759. https://doi.org/10.1016/j.rser.2017.08.025 Journal of Industrial Engineering and Management, 2021 (www.jiem.org) Article’s contents are provided on an Attribution-Non Commercial 4.0 Creative commons International License. Readers are allowed to copy, distribute and communicate article’s contents, provided the author’s and Journal of Industrial Engineering and Management’s names are included. It must not be used for commercial purposes. To see the complete license contents, please visit https://creativecommons.org/licenses/by-nc/4.0/. -717-