Diagnosing Business Processes Diana Borrego and María Teresa Gómez-López 16.1 Introduction Most of the organizations related to industrial manufacturing are process-oriented. In order to facilitate their daily processes, enterprises use software, automating the execution order of their more frequent activities. Business Process Management Systems (BPMSs) have helped Industry to orchestrate their tasks and recover every used information, combining knowledge from information technology area and managementsciencetoimproveoperationalbusinessprocesses[2].BusinessProcessModels (BPMs) are formed of tasks combined by means of a workflow that lets the achievement of a particular business goal [21]. The BPMs can be enriched with rules to describe the values of the data that flows. For example, in the manufacturing process of an aerospace company, the process for aircraft assembly is able to be developed using a BPMS, because it is a frequent process where faults can turn up. BPMs can be described using different perspectives, i.e., control flow, data flow, business rules, resources, and time. BPMs can or cannot work as expected, being necessary to diagnose them. The challenge is that business processes are designed to coordinate different elements related to an organization, then several of them are possible sources of a fault. For example, diagnosis can be related to the execution order of the activities, the input data introduced, the person who executes an activity, the behavior of an activity, etc. Classical model-based diagnosis cannot be directly applied to BPMs, since they havespecialcharacteristicsthatareanalyzedinthischapter.Aspects,suchasthegreat quantity of data used, how the information is shared between different instances of a D. Borrego (B) · M. T. Gómez-López Languages and Computer Systems Department, Universidad de Sevilla, Sevilla, Spain e-mail: [email protected] M. T. Gómez-López e-mail: [email protected]
Act1 Act2 Act3 Act4 Act5 Act6 Data object Fig. 16.1 Example of business process process, or the heterogeneity of the used information or the shared resources, make necessary to tackle the diagnosis from others points of view. An example of a general business process is depicted in Fig.16.1, where a set of activities are combined to develop an objective in a company. The business process can include: who is executing an activity, what data objects are flowing in the instances, which resource is used in each activity, or the database whose data are read and written during the executions. Accordingto thebusinessprocesslife cycle(i.e., Design, Analysis, Configuration, Enactment and Evaluation [21]), Design, Analysis, and Evaluation are the most typical sources of faults, thereby where the diagnosis tends to be applied. These phases can be supported by a Process-Aware Information System (PAIS), that is, a software system that helps to manage and execute operational processes. PAISs include the possibility to model various perspectives, such as people, control flow, data layer or resources, and it is involved in every phase of the business processes. The chapter is organized as follows: Sect.16.2 introduces definitions about business processes and the main characteristics of BPMs to be diagnosed in their different phases. Section 16.3 explains the specific diagnosis techniques that can be used to tackle the challenge found in each phase of the business process life cycle. Finally, Sect.14.5 concludes the chapter. 16.2 Problem Statement Business Process Management (BPM) offers a set of mechanisms that facilitate the modeling of processes by nontechnical experts with a high level of automation [9]. Business Process Management Systems (BPMSs) are a set of software tools and methodologies focused on the management and recovery of business processes execution. The obtained information from the instantiations of the processes can be used to detect and diagnose incorrect behaviour or to improve the process executions. The use of this widespread recovery information enables enterprises to detect in a more efficient and effective way a malfunction in a system. Since BPMs combine various
systems related and choreographed, a more complete and complex diagnosis can be faced. BPM fits well with the necessities of factories [15] since every day they perform a set of well-defined processes to produce their products, where heterogeneous data are recovered. 16.2.1 Business Process Description Business processes help organizations to describe and monitor their daily activities to be improved. The most relevant definitions are shown below: Definition 16.1 (Business Process) A set of activities that are performed in coordination in an organization and technical environment. These activities jointly achieve a business goal [21]. The quality of a business process is able to be defined as both the capacity to produce quality outcomes or to produce the outcome in a quality way. Quality is usually measured by aspects, such as accuracy or security [14]. Verification and diagnosis of business processes help to ascertain the quality of the process, especially analyzing suitability and accuracy aspects in relation to the expected behaviour: •Accuracy.Thecapability ofa businessprocesstoprovidetheexpectedresultswith a certain degree of precision. The verification and diagnosis of business processes ensure obtaining the results in accordance with the expected behaviour, ensuring the attainment of the expected results. •Suitability. The capacity to provide the appropriate solution to get the specified business goals. Definition 16.2 (Business Process Model (BPM)) It is formed by a set of activities, a set of control flow gateways (AND, OR, XOR) that describes the relationship between the activities, and a set of Data Objects that flows in the business process [21]. BPMs can be activity oriented or artifact oriented. Definition 16.3 (Business Process Management) It can be considered as an extension of classical Workflow Management (WFM) that includes concepts, methods, and techniques to support the design, administration, conformance, enactment, and analysis of business processes [21]. Definition 16.4 (Business Process Management System) It is a generic software system that is driven by explicit process representations to coordinate the enactment of business processes [21]. Definition 16.5 (Business Data Constraint (BDC)) They are a subset of business compliance rules that represent the compliance relation between the values of data during a business process instance. It is a numerical constraint that involves business process variables that can be related to the data flow or the stored information. BDCs can be associated as invariant to the business process or as pre- or post-conditions [13].
16.2.2 Business Process Phases The whole business process life cycle includes various phases: In the Design phase, business processes are modeled, where typically livelock and deadlock analyses are performed [10] to avoid the incorrect synchronization of the project choreography. Also, data read and written must be analyzed, in order to avoid missing, redundant, andconflictdata[19].IntheAnalysis phase,validationandverificationbysimulating are performed. In order to cover the possible instances of a BPM, both control flow and data flow perspectives must be combined. A fully automated diagnosis of the correctness of BPMs implies to include the semantics of activities by means of business rules. What are the most relevant data to be monitored in a business process is not always a trivial problem. In the Configuration phase, the most appropriate points of monitoring are analyzed to obtain the level of diagnosability needed in each case. A correct BPM is not able to work correctly using incorrect input data. In the Enactment and Evaluation phase, processes are monitored and analyzed to evaluate and diagnose both BPMs (workflow and rules) [17] and the used data for each instance [13]. 16.2.3 Model-Based Diagnosis and Business Processes In order to diagnose if a system is working as expected, it is necessary to compare the designed model with the observations (Observational Model). 16.2.3.1 Model The model in business processes tends to be formed of two parts: Activity-oriented business model and Business Data constraints. Activity-oriented business model that tends to be described by using the standard BPMN [16] that permits the inclusion in the model of several artifacts to describe activities workflow, used data objects, choreography between processes, etc. The activity-oriented workflow describes the possible order of execution of the activities. To include in the model how the variables can evolve during the execution of business process instances, business data constraints (Definition 16.5) describe the relation between the data values during the instantiation of a process. BDCs are presented as constraints with numerical variables (integer, float, and natural) by following the next grammar [13], where it is important to highlight that the variables participating in the constraints can come from the database or from the data flow: BusinessDataConst := Atomic−Const BOOL−OP BusinessDataConst |Atomic−Const |’NOT’ Constraint BOOL−OP := ’AND’ |’OR’ |’→’ Atomic−Const := function PREDICATE function
function := Variable FUNCTION−SYMBOL function |Variable |Constant Variable := Table’.’Attribute |Attribute |DataFlowVariable | Constant PREDICATE := ’=’|’<’|’≤’|’>’|’≥’ FUNCTION−SYMBOL := ’+’|’−’|’∗’|’/’ BDCs are able to describe the pre- and post-conditions of the variables before and after an activity is executed. For example, {A−OutputSignal ≥B−InputSignal +C−InputSignal AND A−OutputSignal ≤C−InputSignal}. 16.2.3.2 Observational Model In a Process-Aware Information System (PAIS), the information is typically stored in arelational database, and therefore the tuples ofthe tables compose the Observational Model (OM). Since the variables involved in a BDC have different origins, it is possible that attributes from various tables are related in a single BDC. The location of the data in various tables is due to the necessity to follow the Normal Forms defined in relational database theory. The normalization rules are designed to prevent update anomalies and data inconsistencies. Since data is stored in various tables, to ascertain the full tuple of values for an OM, a denormalization process needs to be carried out [13]. To understand how the OM can be extracted from a relational model, the example of Fig.16.2 is used. It includes two entities (A and B) with a relation by means of a foreign key that relates each tuple of entity A with a tuple of entity B. If a join is executed between both entities, relation Entity A&B is obtained. This new relation represents three different OMs, where finally a diagnosis process can be executed. The different aspect, in this case, is that each OM is not independent of the others. For example, attributes din first and second tuples come from a single value in the original entities. It means that if d1 is an explanation of malfunction for a diagnosis, it has to cause a malfunction for the second tuple of the OM too. It is not always related to the value of the variable itself since, for example, the attribute bin the second and third tuples has the same value b2, but they represent two different variables that can take the same value. In the last case, the explanation of a malfunction in the second OM does not imply the same explanation for the last tuple. 16.2.4 Special Characteristics Business processes have special characteristics that provoke the necessity of adapting classical diagnosis techniques. Both the great amount of data generated and the multisource heterogeneous information cause the need for adaptation of the classi-
Fig. 16.2 Example of creation of OM cal diagnosis for business processes. Some of the most relevant characteristics are explained in the following: •Shared data among different process executions. Business processes tend to be modeled when a set of activities in a defined order are frequently repeated in a company. Each process execution is called instance. These instances use data that flow in the process or is stored in an external database. Derived from this external storage, the same data can be used in different instances, as explained in Sect.16.2.3.2. It gives rise to when a value of a data is determined as incorrect in a diagnosis evaluation, it is necessary to take into account that the diagnosis explanation must be conformance with every instance where the data is involved, and if the data is incorrect or correct in an instance, it must be incorrect or correct for every instances where this data participates. •Different sources of fault. Business processes are able to coordinate every participant in an organization into the same model. This has the advantage of integrating several possibilities in a diagnosis study, but also makes more complex the detection of the possible responsible for a malfunction. Several causes can be the origin: the involved persons, data, activities, resources, etc. This heterogeneity of possible faults makes more complex the isolation of the responsible for a malfunction. •Rules and structures combined. Models in business processes are formed by the activities described in the Business Process Model of Definition 16.2, and the Business Data Constraints of Definition 16.5. This causes that, when a diagnosis is done, the whole process has not been analyzed, since it depends on the point of analysis in the business process instance. •Choreography between several processes. Processes usually work in a coordinated way, although it brings about more complex models that can imply more faults. It is derived from several persons working and interacting in different parts of the models, increasing the possibilities of introducing malfunctions.
•High changeability of business rules. Business rules are frequently changed, since rules can change over time. This is because of compliance rules let business experts describe how the process works, not being necessary to modify the workflow. 16.3 Proposed Approach The mentioned characteristics affect the diagnosis in different ways according to the involved phase. In following subsections, each phase is analyzed and how the diagnosis can be tackled derived from the special characteristics is explained. 16.3.1 Design Onlya reducedpercentage ofsoftwareprojects succeed.The primaryreason forthese failures is poor conceptual modeling. To detect and avoid this, the aim of verification analysis methods is to check the correctness of BPMs, concerning the detection of syntax errors or violations in control flow and data flow perspectives. 16.3.1.1 Workflow Most modeling and verification approaches in the literature only consider the control flow perspective of BPMs. These contributions typically deal with errors in the modeling of the flow, detecting deadlocks, livelocks (infinite loops), lack of synchronization, and dangling reference, most of them checking an important correctness criterion known as the soundness property, which guarantees proper termination of the business processes. The most popular and effective notation for modeling business process at the conceptual level is the Business Process Modeling Notation (BPMN). It is a notation used to characterize the identification and the specification of the business processes. However, the general modeling includes the arbitrariness and lacks the strictness. For example, the congestion of business flows. If the congestion is not properly controlled, the software may not meet the requirements. As explained in van der Aalst in [1], process chains are considered to be sound if they fulfill a series of conditions: (i) for every process Awhich is reachable from a start process, there exists a sequence leading from process Ato the terminate process; (ii) the terminate process is the process that has no subsequent process; and (iii) for each process A, there is at least one occurrence sequence from the start process to the terminate process that involves process A. In detail, the congestion can lead to the structural problem such as livelock. A livelock problem is an infinite execution of a process. In this problem, some of the
Fig. 16.3 Livelock and deadlock example processes may run successfully but some of the processes trap in an endless loop of execution. Likewise, deadlock takes place when a business process requires the execution of previous processes to be completed, but at least one of them is never executed. Such errors inhibit the BPM to work correctly. As an example, Fig.16.3 shows a simple BP model, where two processes collaborate by means of exchanging a message (dashed arrow). Depending on the evaluation of the exclusive gateway in Process 1, different traces can be obtained, which is possible to get stuck in a livelock or a deadlock. Such possible traces are T1:(start1,start2)→(xor1,Act2)→(Act1,end2)→(xor1)→ (end1)⇒ CORRECT TRACE T2:(start1,start2)→(xor1,Act2)→(end1,Act2)→(Act2)⇒ DEADLOCK T3:(start1,start2)→(xor1,Act2)→(Act1,end2)→(xor1)→ (Act1)→(xor1) ⇒LIVELOCK 16.3.1.2 Data Flow On the other hand, besides the structural verification regarding conflicts in the control flow perspective, when the data flow perspective is not correctly designed within the BPM, it can cause errors or conflicts, referred to as data anomalies in [18], classified into three types in [19] as given below: 1. Missing data. It takes place when a data item is accessed before it is initialized, for four different causes: (i) a data is never assigned an initial value; (ii) an activity which uses a data item is executed before the activity which initializes
it; (iii) the initialization and access are performed in parallel branches, thereby the data item may not have been initialized when it is read; and (iv) the data item is used but not initialized under certain workflow routing conditions. 2. Redundant data. A data item that does not contribute to the production of the final output data of the process is produced, causing inefficiency. The main cause is that a data item is produced by an activity, but never used by any activity executed after it in the process instance. 3. Conflicting data. There exist different versions of the same data item. It is impossible to decide which version of the data item should be considered. In addition, it is necessary to consider verification of data flow errors, specifying variables read and written per activity, and even detailing the effect of each activity by means of pre- and post-conditions. 16.3.2 Analysis The verification of BPMs allows to determine the correctness of business processes, because a business process cannot be correct, if: (i) one or more of its activities can never get executed for any possible value of the data input or (ii) there is not any possible process instance for a certain value of the input data. In these cases, despite the BPM can be correct regarding the control flow perspective, it is not correct from the perspective of the data flow. In order to diagnose faults in data semantics, an effective means to express data constraints is to annotate activities in a BPM with pre- and post-conditions that specify the effect on the data state for each activity. Annotating process’ activities with pre- and post-conditions facilitates compliance checking to ensure that business processesareproperly designed. Itisan effectivemeans tocapturesuch dependencies between control flow and data flow. Moreover, pre- and post-conditions can capture requirements on the data flow that any execution of the business process has to comply with. This subsection presents an approach for diagnosing the correctness of the relationship between values in semantic BPMs, containing activities whose effects are formally specified using pre- and post-conditions. An activity can start if the execution of the BPM has reached the activity and its precondition is satisfied. Upon completion, the activity delivers data that satisfies its post-condition. An execution of the business process can reach an activity whose pre-condition is not satisfied. In that case, the execution gets stuck in the activity and fails. To detect these errors, we distinguish between two different notions of correctness to diagnose such data flow errors [5]: •May-correctness. A BPM is may-correct if every activity can be reached and executed at least once, so there is an execution in which the activity is done. The fulfillment of this correctness ensures that there is at least one valuation of the data inputs which makes an activity executable.
is minimal iff there is not a subset SS ⊂Swhere SS is a possible minimal incorrect variables set. The Max-CSP shown below is created to obtain this maximum set of variables in (1) with the value associated by the user. In order to obtain this minimal combination, reified constraints in (8) are used. A reified constraint relies on a variable that denotes its truth value. It is, therefore, necessary to add new variables to the CSP (in (2)), whose domain is reduced to values 0 (false value) and 1 (true value). The Max-CSP is type InputVar1,...,InputVarn(16.1) type InputVar Bool1,...,InputVarBooln(16.2) type DerivedVar1,...,DerivedVarm(16.3) type var Maximize (16.4) InputVar1=[min−domain1,max−domain1](16.5) ... InputVarn=[min−domainn,max−domainn] DerivedVar1=[min−domain−derived1,max−domain−derived1](16.6) ... DerivedVarm=[min−domain−derivedm,max−domain−derivedm] Business−Rule1(16.7) ... Business−Rulek Constraint1=(InputVarBool1=[InputVar1−Instance])(16.8) ... Constraintn=(InputVarBooln=[InputVarn−Instance]) var Maximize =Constraint1+...+Constraintn(16.9) maximize(var Maximize)(16.10)
16.3.4.2 Hybrid Faults in Business Process Diagnosis One of the challenges described in Sect.16.2 is the continuous evolution of the rules in a business process. This is an advantage of flexibility in the system, but it is also a potential source of faults, because business constraints can be introduced incorrectly or being inconsistent according to the legacy data. Thereby, a great quantity of data and rules can be involved in a malfunction, then several possible diagnoses can be found. In order to reduce these possibilities, it is necessary to include weights associated with the various possibilities [6]. It is even more complex because of the high quantity of information and rules evolving in the processes at runtime. Derived from this complexity, a hybrid diagnosis needs to be performed regarding the likelihood of faults in data versus business rules. In order to achieve the correct diagnosis, it is fundamental to attain the best assumption concerning the degree of likelihood. For example, if the possible minimal explanation of a fault is that one data value is incorrect or one BDC is incorrect, which is the more likely minimal diagnosis? We could consider that data are more frequently introduced, and by more nonexpert user, then probably data is the incorrect element. But in the case that the possible explanation are four variables or one BDC? It could depend on the number of introduced input data. If 2,000 input data were introduced, 4 incorrect faults are a very low percentage, but if only 5 data have been introduced, it is more likely that the BDC is the incorrect element rather than 4 out of 5 values. When both data and BDCs can be incorrect, the Max-CSP explained in the previous subsection must be adapted, since both variables and BDCs must be associated with a reified constraint that can be true or false. It is also necessary to include different likelihoods for each BDC, since it will depend on the number of variables associated to each one of them. For this case, a Min-CSP instead of a Max-CSP is needed. In order to declare the Variables of the problem, a new variable is added to the Min-CSP for each variable obtained in BDCi jas explained in Sect.16.3.4.1 following the syntax: type var1 k,…,varm k. Furthermore, in order to provide the Min-CSP with the ability to distinguish between different sources of faults (i.e., data and/or BDCs), also reified constraints are used. There are different reified constraints, some associated to each BDC (BDCi) andsomeothers toeach BDCifor each tuple j(BDCj i).TheBoolean variablerBDC i will be true to denote the correctness of BDCifor any tuple of values and rBDCj i for each different tuple. The Min-CSP has the following form: //Boolean variables associated to reified constraint to ascertain the satisfiability of each BDC: Bool rVar1 k,...,rVarm k(16.11) Bool rBDCi,rBDC1 i,...,rBDCn i(16.12) //Reified constraints to represent the correctness of the variables assignment: rVarj k=¬(var j k=value j k)(16.13)
//Variable to represent the reified BDCs for each tuple: rBDC1 i=¬(BusinessRuleiinstantiatedbytuple1)(16.14) ... rBDCn i=¬(BusinessRuleiinstantiatedbytuplen)(16.15) The reified variables are assigned to negated constraints since the objective function is to minimize the number of elements with incorrect behavior (noncompliant). To know when a fault in a BDC is less likely than in a data value, it is necessary to include in the Min-CSP the following BDCs: rBDC i=rBDC1 i+···+rBDCn i= n j rBDCj i≥minLiki(16.16) These constraints incorporate the likelihood concept into the CSP, by using the parameter minLiki. Definition 16.9 (minLiki) This is a parameter that represents the minimum number of faults (noncompliant instances of a BDCi) that is determined as the threshold to represent that there is a malfunction in a BDCi[6]. This value depends on the number of data related to each BDC. For example, if there are 5 tuples where BDCiis involved, minLikican take a value between 1 and 5. If at least the minLikithreshold number of instances is not satisfiable, then BDCi is considered as a part of the minimal diagnosis. How the values of each minLikiis determined is detailed in [6]. The Objective function to minimize is defined as follows: minimize(rVar1 k+···+rVarm k+···+rBDC 1∗minLik1+···+rBDC q∗minLikq) (16.17) EachrBDCihasaweightingthatmultipliesitthatisproportionaltoeachparameter minLiki. This objective implies finding the minimal hybrid diagnosis. Finally, it is important to include in the Min-CSP the following constraint, one for each BDCi: (rBDC1 i+···+rBDCn i=0)∨(rBDC1 i+···+rBDCn i≥minLiki)(16.18) Previous constraint contemplates two scenarios: (i) n jrBDCj iis equal to 0 being BDCicorrect for every tuple of data or (ii) n jrBDCj iis equal to or greater than minLiki,representing thattheBDCihasadefectthatis observedfortheinconsistency of some (depending on the minLik) tuples. The inclusion of ≥avoids intermediate values between 0 and minLiki. This constraint strengths that a BDCiis incorrect iff another explanation will imply that more than MinLik input data were incorrect.
16.4 Conclusions Business Process Models facilitate the description, implementation, and deployment of the activities of an organization. As other systems, both design and execution can be incorrect, being necessary the use of diagnosis techniques. Since industrial business processes have special characteristics, classic model-based diagnosis must be adapted to be applicable in this context. In this chapter, how the special characteristics can affect the most relevant business process phases have been presented, at Design, Analysis, Configuration, and Enactment and Evaluation phases. Regarding the Design and Analysis phases, both workflow and data management must be included in the business process diagnosis. In relation to the configuration phase, it is relevant to decide where a business process can be monitored to obtain the wished level of diagnosability. During enactment and evaluation phase, the model and data must be combined to detect incorrect behaviors at instantiation time. Acknowledgements This work has been partially funded by the Ministry of Science and Technology of Spain (TIN2015-63502-C3-2-R) and the European Regional Development Fund (ERDF /FEDER). We would like to thank SACU of the University of Seville for the valuable information that has contributed toward the development of the ideas in this chapter. References 1. van der Aalst, W.: Formalization and verification of event-driven process chains. Inf. Softw. Technol. 41(10), 639–650 (1999). https://doi.org/10.1016/S0950-5849(99)00016-6 2. van der Aalst, W.M.P.: Process-aware information systems: design, enactment, and analysis. Wiley Encyclopedia of Computer Science and Engineering. Wiley, New Jersey (2008) 3. Alpern, B., Wegman, M.N., Zadeck, F.K.: Detecting equality of variables in programs. In: Proceedings of the 15th ACM SIGPLAN-SIGACT Symposium on Principles of Programming Languages, pp. 1–11. San Diego, California (1988) 4. de la Banda, M.G., Stuckey, P.J., Wazny, J.: Finding all minimal unsatisfiable subsets. In: PPDP ’03: Proceedings of the 5th ACM SIGPLAN International Conference on Principles and Practice of Declaritive Programming, pp. 32–43. ACM Press (2003) 5. Borrego, D., Eshuis, R., Gómez-López, M.T.: Diagnosing correctness of semantic workflow models. Data Knowl. Eng. 87, 167–184 (2013). https://doi.org/10.1016/j.datak.2013.04.008 6. Ceballos, R., Borrego, D., Gómez-López, M.T., Gasca, R.M.: Hybrid diagnosis applied to multiple instances in business processes. In: Enterprise, Business-Process and Information Systems Modeling - 17th International Conference, BPMDS 2016, 21st International Conference, EMMSAD 2016, Held at CAiSE 2016, Ljubljana, Slovenia, 13–14 June 2016, Proceedings, pp. 212–227 (2016) 7. Ceballos, R., Gasca, R.M., Valle, C.D., Toro, M.: Max-CSP approach for software diagnosis. In: IBERAMIA, pp. 172–181 (2002) 8. Cytron, R., Ferrante, J., Rosen, B.K., Wegman, M.N., Zadeck, F.K.: Efficiently computing static single assignment form and the control dependence graph. ACM Trans. Program. Lang. Syst. 13, 451–490 (1991) 9. Dumas, M., Rosa, M.L., Mendling, J., Reijers, H.A.: Fundamentals of Business Process Management. Springer, Berlin (2013). https://doi.org/10.1007/978-3-642-33143-5
10. Falcioni, D., Polini, A., Polzonetti, A., Re, B.: Livelock and deadlock detection for pa interorganizational business processes. In: K˝o, A., Leitner, C., Leitold, H., Prosser, A. (eds.) Advancing Democracy, Government and Governance (2012) 11. Gasca, R.M., Valle, C.D., Gómez-López, M.T., Ceballos, R.: Nmus: Structural analysis for improving the derivation of all muses in overconstrained numeric csps. In: CAEPIA, pp. 160– 169 (2007) 12. Gómez-López, M.T., Borrego, D., Carmona, J., Gasca, R.M.: Computing alignments with constraint programming: The acyclic case. In: Proceedings of the International Workshop on Algorithms & Theories for the Analysis of Event Data 2016 Satellite event of the conferences: 37th International Conference on Application and Theory of Petri Nets and Concurrency Petri Nets 2016 and 16th International Conference on Application of Concurrency to System Design ACSD2016,Torun,Poland,20–21June2016,pp.96–110(2016).http://ceur-ws.org/Vol-1592/ paper07.pdf 13. Gómez-López, M.T., Gasca, R.M., Pérez-Álvarez, J.M.: Compliance validation and diagnosis of business data constraints in business processes at runtime. Inf. Syst. 48, 26–43 (2015). https://doi.org/10.1016/j.is.2014.07.007 14. Heravizadeh, M., Mendling, J., Rosemann, M.: Dimensions of business processes quality (QoBP). In: Business Process Management Workshops, BPM 2008 International Workshops, Milano, Italy, 1–4 September 2008, pp. 80–91 (2008). https://doi.org/10.1007/978-3-642- 00328-8_8 15. Kalpic, B., Bernus, P.: Business process modelling in industry - the powerful tool in enterprise management. Comput. Ind. 47(3), 299–318 (2002). https://doi.org/10.1016/S0166- 3615(01)00151-8 16. OMG: Object Management Group, Business Process Model and Notation (BPMN) Version 2.0. OMG Standard (2011) 17. Rozinat, A., van der Aalst, W.M.P.: Conformance checking of processes based on monitoring real behavior. Inf. Syst. 33(1), 64–95 (2008). https://doi.org/10.1016/j.is.2007.07.001 18. Sun, S.X., Zhao, J.L., Sheng, O.R.L.: Data flow modeling and verification in business process management. In: AMCIS Association for Information Systems (2004) 19. Sun, S.X., Zhao, J.L., Nunamaker, J.F., Sheng, O.R.L.: Formulating the data-flow perspective for business process management. Inf. Syst. Res. 17(4), 374–391 (2006) 20. Wallace, R.J.: Directed arc consistency preprocessing. In: Constraint Processing. Selected Papers, pp. 121–137. Springer, London, UK (1995) 21. Weske, M.: Business Process Management: Concepts, Languages. Architectures. Springer- Verlag New York Inc., Secaucus, NJ, USA (2007)