scieee Open visual document viewer

Integrating wooden altarpieces into H-BIM: Geometric profiling, complex artworks, and digital heritage mapping

Moyano, Juan; Martínez Pérez, Eva; Nieto Julián, Juan Enrique; Fernández Alconchel, María

Abstract

In the study and conservation of Cultural Heritage, various disciplines contribute to the research aimed at extracting information from both historical objects and heritage buildings. The contribution of this work is part of an interdisciplinary process to model, register, and evaluate complex models of knowledge. Evaluate a complex model, where there are works of art made of wood, painting, and sculpture. The results demonstrate a process of analysis and geometric characterisation of the shapes, in which most of the profiles are worked with a new methodology of the Best Fit Model (BFMP), and in which its analysis represents a deviation between a range of 7 and 9 mm. The development of low-relief models is based on the Poisson reconstruction equation, applied through a variable workflow using multiple software tools. Furthermore, an Entity Information Matrix (EIM) is introduced, enhancing the exchange and classification of architectural data. This study supports the integration of real-world 3D scans into BIM environments, providing a replicable model particularly suited for the digitization of altarpieces and façades.

Full text

In eg a ing wooden al a pieces in o H-BIM: Geome ic p o iling, complex a wo ks, and digi al he i age mapping Juan Moyano * , E a Ma ínez, Juan E. Nie o-Juli´ an, Ma ía Fe n´ andez-Alconchel Uni e si y o Se ille, Depa men o G aphical Exp ession and Building Enginee ing, A e.Reina Me cedes, 4A, 41012 Se ille, Spain ARTICLE INFO Keywo ds: HBIM Pho og amme y TLS Ba oque al a piece Mesh o BIM Geome ics su aces Pa ame ic ools ABSTRACT In he s udy and conse a ion o Cul u al He i age, a ious disciplines con ibu e o he esea ch aimed a ex ac ing in o ma ion om bo h his o ical objec s and he i age buildings. The con ibu ion o his wo k is pa o an in e disciplina y p ocess o model, egis e , and e alua e complex models o knowledge. E alua e a complex model, whe e he e a e wo ks o a made o wood, pain ing, and sculp u e. The esul s demons a e a p ocess o analysis and geome ic cha ac e isa ion o he shapes, in which mos o he p o iles a e wo ked wi h a new me hodology o he Bes Fi Model (BFMP), and in which i s analysis ep esen s a de ia ion be ween a ange o 7 and 9 mm. The de elopmen o low- elie models is based on he Poisson econs uc ion equa ion, applied h ough a a iable wo k low using mul iple so wa e ools. Fu he mo e, an En i y In o ma ion Ma ix (EIM) is in oduced, enhancing he exchange and classi ica ion o a chi ec u al da a. This s udy suppo s he in eg a ion o eal-wo ld 3D scans in o BIM en i onmen s, p o iding a eplicable model pa icula ly sui ed o he digi i- za ion o al a pieces and açades. 1. In oduc ion The In he conse a ion o Cul u al He i age, a ious disciplines con e ge o ex ac aluable in o ma ion om his o ical objec s and he i age buildings. Wi hin he b oade con ex o e i o ial, social, and cul u al de elopmen — he h ee main pilla s suppo ing buil he - i age— he Fou h Indus ial Re olu ion is eme ging, ma ked by ans- o ma i e in elligen manu ac u ing p ocesses and digi aliza ion. This ans o ma ion is d i en by he in eg a ion o new echnologies such as he In e ne o Things, big da a, e e se enginee ing, and a i icial in elligence. The objec i e goes beyond he me e c ea ion o 3D digi al eplicas; he ue alue lies in in eg a ing es o a ion p ojec s—such as al a pie- ces—in o BIM models, wi h he goal o ein o cing cul u al iden i y and os e ing new spaces o de elopmen . Re e se enginee ing and he Scan- o-BIM me hodology p esen mul iple challenges, posi ioning cu en ad ancemen s in He i age Building In o ma ion Modelling (HBIM) a he cen e o he cul u al and scien i ic discou se. 1.1. In oduc ion gene al The complexi y o he p ocess in he conse a ion o cul u al asse s means ha new pe spec i es o s udies and implemen a ions a e cons an ly being o mula ed o achie e UNESCO ecommenda ions; o p o ec landscapes, na u al and man-made en i onmen s, ha a e o cul u al o aes he ic in e es o ha o m a ha monious na u al whole [1]. All hese ecommenda ions a e made wi h he pe ec echnique o achie e he p oposed objec i es, namely ha Cul u al He i age (CH) is a a subs an ial and dynamic knowledge deposi , conside ed a unique and i eplaceable sou ce o aes he ic, his o ical, and cul u al alues [2] and a communi y mission ha should he e o e be documen ed o a oid he loss o objec s and hei his o y. Consequen ly, he wo ks inse ed in an a chi ec u al con ex a e ecognized as a wo ld ca ego y and cons i u e in hemsel es ields o wo k o uni e sal alue. The a chi ec u al he i age made up o buildings, ci il s uc u es, and objec s ha a e pa o hese s uc u es is pa o his unique alue by na u e. The e a e h ee de e mining ac o s o es ablish whe he a cul- u al asse is wo hy o being classi ied as he i age; i s he his o ical, aes he ic, and a chi ec u al impo ance [3], al hough in o he scien i ic eadings he e a e o he s a emen s ha es ablish in eg i y and con ex , * Co esponding au ho . E-mail add esses: [email p o ec ed] (J. Moyano), [email p o ec ed] (E. Ma ínez), [email p o ec ed] (J.E. Nie o-Juli´ an), [email p o ec ed] (M. Fe n´ andez- Alconchel). Con en s lis s a ailable a ScienceDi ec Au oma ion in Cons uc ion jou nal homepage: www.else ie .com/loca e/au con h ps://doi.o g/10.1016/j.au con.2025.106213 Recei ed 4 Janua y 2024; Recei ed in e ised o m 14 Ap il 2025; Accep ed 15 Ap il 2025 Au oma ion in Cons uc ion 175 (2025) 106213 A ailable online 23 Ap il 2025 0926-5805/© 2025 The Au ho s. Published by Else ie B.V. This is an open access a icle unde he CC BY license ( h p://c ea i ecommons.o g/licenses/by/4.0/ ). as addi ional ele an ac o s. In his ield, he conse a ion o A chi- ec u al He i age (AH) is a p ocess o knowledge, managemen and imp o emen o p ese e his o ical complex buildings [4]. Gene ally, bo h low- and high- elie sculp u es (low elie e e s o igu es ha p o ude sligh ly om he su ace o he backg ound, while high elie e e s o igu es ha p ojec conside ably ou wa ds), as well as pic o ial elemen s, a e inse ed in ha a chi ec u al con ex , o example, ombs, al a pieces, and iezes among o he a is ic wo ks. The e a e wo impo an ac o s in he scien i ic ecogni ion o a wo k o a , i) geo- me ic documen a ion conside ed an essen ial ool o a chaeologis s and his o ians, since i e lec s he dimensional eali y o he objec a le els o millime ic p ecision, and ii) he mechanisms o ca aloguing cul u al goods. The basic ope a ional ins umen o acqui ing knowl- edge o he i age is he in en o y, a mechanism ha acili a es he managemen and p o ec ion o cul u al asse s [5]. Fo hei pa , ca a- logues equi e a highe le el o knowledge since hey imply esea ch, an elemen ha begins wi h he de elopmen o he in en o y. Geome ic in o ma ion is acqui ed wi h Massi e Da a Cap u e Techniques (MDCS) using opog aphic ins umen s. The 3D digi al econs uc ion is acqui ed h ough he so wa e ha implemen s he geode ic measu emen s and p ocesses he digi al models. The impo an ques ion is he uni ica ion be ween ca aloguing p ocedu es and hei in eg a ion in o digi al eplicas o wo ks o a . Mul imedia echnologies de eloped a he end o he 1980s ha e a ou ed he cons uc ion o digi al models, bo h o a chaeology and a chi ec u e, and ha e bene i ed om hese digi al esou ces o imp o e he i age managemen and dissemina ion p ocesses. One o he main applica ions o mul i- media echnologies is 3D eco ding as a documen a ion mechanism. In ac , he e a e ins i u ions a he Eu opean le el such as DIGI- TALEUROPE [6] ha en husias ically welcome ha , in he planning p ocess o he i age wo ks, a digi al e sion o he p ojec should be deli e ed be o e i is buil and he physical a e ac mus be a Digi al Twin (DT). In his con ex , he meaning o he e m Digi al Twin has o do wi h a geome ic eplica whe e i s po en ial deals wi h he moni- o ing and con ol o asse s wi h seman ic model s uc u es. Le us no o ge ha he main componen s o he DT a e conside ed o be; physical componen s, i ual models, and he da a ha connec hem [7]. The usion o DT is o p edic and op imize pe o mance and o his, simu- la ion me hods o da a-based me hods can be used [8]. The connec ion be ween BIM and DT could ocus on he abili y o BIM o s uc u e i sel in seman ic models. This posi ion opens a new scena io when i comes o wo king wi h he i age objec s, wi h an app oach om cons uc ion in he a ea o ehabili a ion, a chi ec u al and sculp u al es o a ion o indus y spaces ha espond o a new knowledge gap. 1.2. S a e o he a in digi al echnologies o al a pieces P o ec ion and conse a ion a e wo se s o ac ions ha aim a he sus ainabili y and du abili y o cul u al asse s. The 2030 Agenda o Sus ainable De elopmen cons i u es an ac ion plan in i s h ee di- mensions: economic, social, and en i onmen al. Cul u al he i age ac- co ding o UNESCO’s speci ica ions can con ibu e o his sus ainable de elopmen . Bo h monumen s and cul u al asse s iden i y socie y, explaining i s his o ical ajec o y [9] and ecognising he he i age o i s gene a ions. In his way, wi hin he conse a ion p ocess, geome ic analysis plays a key ole in p o ec ing his o ic eal es a e asse s. Fo example, in he case o pain ed aul s, hei mo phology and i s ch o- ma ic cha ac e isa ion a e essen ial o es o a ion [10]. The o he aspec is o documen cul u al asse s in such a way ha hey endu e o e ime. Digi isa ion is becoming one o he mos impo an ehicles o p ese ing and p o ec ing he i age asse s. To his ques ion, UNESCO [11] de ines he e m digi al he i age as he se o compu e ma e ials o las ing alue ha mus be p ese ed o u u e gene a ions. Howe e , in he ield o p ac ice, we mus conside ha digi al echnologies do no ha e he sole objec i e o documen ing buildings. The applica ion o He i age Building In o ma ion Modelling (HBIM) p ocesses p o ides an addi ional elemen compa ed o docu- men a ion alone, ha is, he abili y o ollow an asse in con inuous e olu ion and a he same ime suppo in e en ions on i . Digi al echnologies help in hei a ious ields o su ey, diagnose, and dissemina e a chi ec u al he i age. F om his, he essence o digi al wo ks ha also ela e o he i age asse s mus also be p ese ed. We e e o he impo ance o ob aining eco ds h ough poin clouds a e he agic acciden a No e Dame Ca hed al, whe e And ew Tallon wo ked as a p o esso o medie al a documen ing he con en o he same wo k [12]. Thus, emo e sensing echniques such as he Ligh De ec ion and Ranging (LiDAR) sys em and S uc u e om Mo ion (S M) image cap u e echniques allow he su ace o eali y o be cap u ed exhaus i ely and accu a ely. F om he o e iew es ablished by emo e sensing echniques ca ied ou by Bassie e al. [13]. A case s udy in he Bijloke chu ch combined he echnique o Te es ial Lase Scanning (TLS) and S M o documen he pain ings and o namen s o an al a piece. In addi ion, Can os Ma ínez e al. [14] used pho og amme y as a da a acquisi ion echnique o documen and p ojec he a is ic wo k. Likewise, D´ a ila [15] wo ked on pho og am- me ic es i u ion and an app oxima ion o he digi al image o al a - pieces, speci ically in he Chu ch o San Jacin o (Venezuela). On he o he hand, Hanke e al. [16] om an expe imen al campaign by TLS wo ked on he geome ic p ojec ions o an al a o e i y he con ou s o he elemen s and made a simpli ica ion o he al a piece s uc u es in 3D. In his line, mos o he implemen a ion wo ks ha ha e o do wi h Building In o ma ion Modelling (BIM) applied o he i age use LiDAR echniques o cap u e he geome y. The e m “Scan o BIM” has been widely used, o gene a e aul s uc u es [17], o o documen s uc u al analysis e alua ions using ini e elemen models [18]. This e m has a speci ic meaning o he applicabili y o geome ic shapes o he BIM pla o m, in he case o manual use [19,20], whe e no ype o segmen a ion algo i hm is applied, o ano he o m called semi-au oma ic, ocused on ob aining objec sin a chi ec u e [21] o enginee ing [22] o wi h algo i hm p o- cedu es compa ible wi h BIM pla o ms such as A chiCAD+G asshoppe [23]. The concep be ween LiDAR-BIM, is also ano he e m ha uni es he p ecise da a echniques wi h 3D econs uc ion modelling and hen expo s hem o Re i so wa e [18]. In his con ex , esea che s a e g owing in e es ed in add essing digi al ools h ough me hodologies ha implemen e e se enginee ing in his o ic buildings. Fo angible and a chi ec u al cul u al asse s, Mu phy e al. [24] ca ied ou he i s in es iga ions on he in o ma ion modelling o his o ical buildings om a chi ec u al pa e ns, wi h he cons uc ion o pa ame ic objec s. O eni e al. [25] de eloped wi h a da abase o chu ch objec s such as s one aul s and wooden oo s uc u es. In eali y, ew wo ks a e dedica ed o showing in a comp ehensi e way he p ocesses ha a eal es a e (such as an al a piece) has o go h ough un il a 3D model can be ob ained wi h seman ic in o ma ion abou he es o a ion unde gone in cu en imes. The dissemina ion o accu ace models allows knowledge o he objec o s udy, hus Ga cía- Le´ on e al. [26] expe imen ed wi h a ba oque al a piece in he chapel o Ou Fa he Jesus Naza ene o Ca agena applying mul imedia ech- niques o 3D isualisa ion, he main objec i e being o combine ech- niques o ob ain eliable documen a ion. Ins ead, Nie o e al. [27] wo ked on a TeamWo k implemen a ion p ojec o he managemen and sus ainabili y o eal es a e. Speci ically, he a iabili y o pain ings ha appea in he sac is y o he Chu ch o he Company o Jesus in Qui o is labelled. Bu un il now he e is a o al absence o s udies dedica ed o s uc u ing wo k on mo able p ope y using BIM echnol- ogy. The impo ance o al a pieces as mo able objec s is based on he ac ha hey appea con igu ed as a chi ec u al s uc u es, and as con aine s o impo an a is ic wo ks o pic o ial, sculp u al s yle in a ious modali ies, ha is, in low, medium, and high elie , and he ma e ials used in hem a e gene ally cons uc i e pieces o wood. The 3D modelling o hese s uc u es on a BIM pla o m is a challenge in he ield o a chi ec u al and a chaeological he i age esea ch. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 2 1.3. Objec i es. The challenge o b inging o BIM, al a piece eal es a e The al a pieces a e a chi ec u al s uc u es ha ha e occupied a s age assembly space o su p ise he ai h ul on hei isi o eligious emples. Thei ex ension was gi en especially in he Ba oque e a when he economic esou ces o he chu ch gua an eed an a is ic wo k o his high le el. The de o ion o eligious images occupied a p io i y se ing in s a egic places in he emple, such as he side chapels, he main al a , and annexes o he chu ches. Mos o hese a is ic wo ks we e designed by olde a chi ec s and mas e s, al hough in o he cases, such as ha o he pain e Claudio Coello in he wo k o he Ma y dom o Sain S e- phen, hey collabo a ed in he layou o he al a piece o namen s [28]. B inging hese s uc u es o BIM is an impo an challenge, since i is necessa y o s uc u e he p e ious wo k on geome y modelling and da a acquisi ion echniques and hen ain ope a o s o become amilia wi h BIM pla o ms. To p o ide a de ailed desc ip ion o Scan o BIM p ocedu es in his sec o , i mus be said ha he objec i e essen ially sough by poin cloud p ocessing is he quali y o he geome ic p ecision o he pu - poses o 3D econs uc ion. On he one hand, he quali y o he poin cloud mus be e alua ed, bu on he o he hand, he quali y o he BIM geome y c ea ed mus be e alua ed. The i s pa is de eloped in Sec ion 2.3, whe e he di e en ia ion be ween he wo massi e da a acquisi ion echniques pe o med is es ablished. The adop ion o hese TLS iG and S M iG echnologies con ibu es o he au oma ion o p ocesses de eloped in Sec ion 3. Fu he mo e, he objec i e is o inc ease he quali y o he poin cloud o maximize p ecision and minimize he in- luence o ope a o s. The compa ison be ween he TLS iG and S M iG echnologies se es o a oid unce ain y in he ob ained da a se . On he o he hand, BIM in ol es managing and gene a ing physical ep esen- a ions o ope a ional elemen s o a building [29], so i is con enien o ex ac he mo phological cha ac e is ics –such as shapes and spa ial dimensions- o b ing hem o BIM and inco po a e seman ic labels –iden i ica ion o componen s- ha will allow he classi ica ion o he elemen s. This p ocess is ca ied ou in Sec ion 3.1 h ough he ICP al- go i hm using CloudCompa e. Also, he ac i e in e connec ion be ween ope a o s ha has been de eloped in sec ion 3.2 as TeamWo k de el- opmen . The model in his phase is ini ial, bu he cha ac e is ics a e in place o s a modelling. P e iously, an iden i ica ion o he cha ac e - isa ion o he p o iles ha make up he model was made. Achie ing he bes p o ile i model is one o he inno a i e me hodologies o his esea ch de eloped in Sec ion 3.3. This p ocedu e in ol es ex ac ing he main cha ac e is ics o he modelling o pieces ha mos ly make up he wo k o a , he e o e, he challenge is double in he sense o moni o ing a p ocedu e ha op imises he geome ic esul o a co nice o objec in i s con inuous o m. On he o he hand, i pe o ms a simpli ica ion o he geome y o imp o e he esou ces o he model. The ollowing Sec ion 3.4 deals wi h he challenging p ocess o modelling he a wo ks and ha ing hem expo ed in a mesh o BIM. These a e no me e game isualiza ions, bu a he elemen s ha allow da a en y in o he BIM so wa e. Making a mesh op imal in he BIM en i onmen is one o he challenges cu en ly aced by he scien i ic communi y. Sec ion 4 de elops one o he mos ou s anding in en i e p ocedu es o his a icle, which is he en i y in o ma ion ma ix. This is a p oposal o an unde lying model ha , h ough he classi ica ion o a chi ec u al s uc u es, allows any iden i ica ion in an a chi ec u al amewo k. Nex , in sec ion 5, he HBIM p ojec o an al a piece wo k ha in eg a es wo ks o a made o wood, pain ing and sculp u e, by he likes o Juan Ma ínez Mon a˜ n´ es, is comple ely modeled wi h he aim o ein o cing new iden i ies, eco ds and new spaces, de elopmen in esea ch. All hese s eps a e e lec ed in he wo k low in Fig. 1. F om he BIM expe ope a o s le el, i is abou he implemen a ion o he model in he expe imen al de elopmen o he wo k. (See Table 1.) 2. Wo k me hodology The s udy ollows a mul i-phased amewo k explained in Sec ion 2.2 o assess he ba ie s o implemen a ion in Scan- o-BIM p ocesses. The p ocess, which anges om poin cloud cap u e o pa ame ic modelling in BIM, seeks o ensu e me ic accu acy and in e ope abili y, while e alua ing he e ec i eness o each echnique in ep esen ing o ganic and geome ic elemen s. Compa ing poin clouds (TLS s. S M) using algo i hms such as ICP in CloudCompa e e eals hei complemen a y ad an ages, laying he g oundwo k o u u e applica ions in cul u al he i age. 2.1. Case s udy. The al a piece by Ma ínez Mon a˜ n´ es Juan Ma ínez Mon a˜ n´ es was one o he g ea image make s o sculp u al a in he Spanish golden age [30] and a pe sonal iend o he Fig. 1. Wo k low. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 3 schola and pain e F ancisco Pacheco [31]. He began in he G anada wo kshop o he mas e Pablo de Rojas as an app en ice in he a is ic nucleus o his ci y. In 1588, a he age o wen y, he a elled o Se ille, al hough no ea ly sculp u e by he sculp o is known [32]. His s udies we e o med by means o eng a ings o he mos amous a is ic wo ks o he I alian Cinquecen is as, which o e ed so much in luence o he Spanish Manne is s. He managed o es ablish he sculp u al no ms o wes e n Andalusia du ing he en i e Ba oque pe iod. I is documen ed ha he design o he Al a piece o San Juan Bau is a was he wo k o Juan Ma ínez Mon a˜ n´ es. The image y, elie s, and ca e by he same au ho and F ancisco de Villegas. The gilding o he al a piece and he polych omy we e in cha ge o Juan de Uceda Cas o e de and he pic o ial epe oi e by he same au ho . Hi ed on 29 Janua y 29, 1610, i was comple ed in 1622 [33]. Rega ding he iconog aphic p og amme, he s uc u e o he al a piece is con igu ed in i e le els om he basemen o he uppe pa o he a ic. The pilla s uc u es a ached o he main plane a e de eloped h ough Do ic o de columns wi h lu ed sha s. The pic o ial epe oi e is made by means o hi een pain ings on ables and nine elie s wi h di e en deg ees o sculp u al dep h ha ep esen he li e o Sain John he Bap is 2 a). The dimensions o he al a piece can be conside ed as a no mal-sized al a piece o 4.80 by 8.79 m ep esen ed in Fig. 2 b). 3. Ma e ials and me hods Any implemen a ion in BIM equi es a wo k phase o in eg a e he sys ema ic p ocess ha anges om scanning o he c ea ion o he pa ame ic digi al 3D model. Once he en i e 3D model has been buil wi h i s geome ic p ope ies, we p oceed o inse he seman ic s uc- u e in each o he elemen s, hus inc easing he in e ope abili y o he model wi h hei espec i e seman ic uni s. Al hough much o he wo k done in BIM is di ec ed a he i age, i s objec i es a e based on he con ibu ion o knowledge and he i age managemen [34]. Resea che s in his a ea o knowledge y o implemen p ocesses o make digi al pla o ms p o i able in he applicabili y o a chi ec u al and a chaeo- logical he i age. Fo his eason, in eg a ed su ey me hodologies play an impo an ole in he digi isa ion o complex objec s such as he analysed, in his case, an al a piece a is ic wo k [35]. Hyb id da a acquisi ion wi h he combina ion o TLS and S M, whe e each o he echnologies p o ides a ibu es wi h complemen a y p ope ies o he poin cloud, makes he p ocess hyb id. Fo his eason, BIM ope a o s mus conside which me hodologies a e he mos op imal o ob ain a good design wi h e ec i e pe o mance in he BIM model. I is no unde s ood he s udies o BIM pla o ms, o modelling wi hou sys em implemen a ion. Each o he wo k phases equi es geome ic model p ocedu es and analy ical models ha jus i y he bes wo k op- ion. In his expe imen al design, he ollowing phases ake place: i) cap u e h ough TLS, ii) cap u e h ough pho og amme y, iii) e alua- ion o he model o es ablish me ic eliabili y objec i es, i ) semi- au oma ic segmen a ion o s uc u e he elemen s, ) classi ica ion o s uc u es and elemen s, i) meshing p ocess o he o ganic pieces, ii) ex ac ion o he p o iles om he wooden s uc u es, iii) BIM Table 1 Desc ip i e S a is ics N o al S anda de ia ion ( σ ) (m) Min. Dis ance (m) Max. Dis ance (m) A e age dis ance (m) Sum (m) Median (m) P o ile _1 54 0.01036 −0.021 0.0182 3.04E+01 0.0164 −7.5E-4 P o ile _2 37 0.01024 −0.0093 0.0294 0.00755 0.2793 0.0114 P o ile _3 50 0.01383 −0.0195 0.0228 0.00652 0.3262 0.01165 P o ile _4 58 0.00796 −0.005 0.0208 0.00562 0.3262 0.00205 P o ile _5 58 0.01452 −0.0271 0.0137 −0.00132 −0.0765 0.0033 P o ile _6 58 0.00944 −0.0154 0.0156 0.00418 0.2426 0.0076 Fig. 2. a) Image on he le , al a piece by Ma ínez Mon a˜ n´ es om he Chu ch o he Annuncia ion. b) Image on he igh , scale ep esen a ion o he al a piece in a scala image. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 4 modelling using A chiCAD so wa e o he a chi ec u al pieces, ix) inse ion o he igu es in he ame o he al a piece, and x) Inse ion o p ojec da a h ough dynamic schemes. 3.1. Cap u e o he poin -cloud eco ds Wi h he appea ance o he new Pe sonal Lase Scanning (PLS) ype geoma ic echnology equipmen , which simpli ies da a cap u e and he manageabili y o eco ds in a chi ec u al spaces, i was decided o ca y ou a i s su ey h ough BLK360 ha uses Wa e o m Digi alisa ion Technology (WFD), wi h a maximum scanning speed o 360.000 poin s/ s. I has h ee HDR digi al came as wi h colou senso and ixed ocal leng h (single image 2592 ×1944 pixels, 60◦×45◦( x hz), ull-dome scanning o 30 images and au oma ic gap ec i ica ion, 150 Mpx, 360◦×300◦), as well as an in a ed he mal came a (160 ×120 pixel single image, 71◦×56◦( x hz), 10-image ull-dome scan, 360◦×70◦), all ou included in he ki . This ins umen achie es a ange accu acy acco ding o he manu ac u e o 4 mm a 10 m, and 7 mm a 20 m [36]. The esul ob ained is a poin cloud o 2.651.440 poin s. The use o wo massi e da a acquisi ion echniques allows us o gua an ee ha he en i e su ace o he al a piece is co e ed. The e o e, ano he pa o he da a cap u e echniques based on S uc u e om Mo ion images is an algo i hm well known by he scien i ic and academic communi y [37], which allows he cons uc ion o 3D models widely used in he ield o mo ion s uc u e a chaeology and pa imonial a chi ec u e [38]. The pho og amme y wo k low mus manage a da a plan based on mea- su emen con ol poin s so ha hey a e inco po a ed in o Me ashape’s Agis o so wa e [39] and, a i ing a he in e media e p ocess o pos - p ocessing o he images, include he measu emen s ha scale he inal model. Con ol poin s a e widely used o o mal a chi ec u al con ol, in which an analy ical model can be made a e geome ic analysis. Dos San os e al. [40] e ealed he complexi y o he dimensional con ol o con ol poin s in he geo e e encing o a eco d wi h a e es ial lase scanne , h ough a scena io o in e io and ex e io spaces. In his complexi y [41] ca ied ou a s udy ha examined he geo e e encing and geome ic quali y o a eco d in S M h ough mul iple combina ions o G ound Con ol Poin s (GCP). The au ho s´conclusions es ablish he p opo ionali y o he con ol poin s in a uni o mly dis ibu ed dis i- bu ion. Fo his case, 15 con ol poin s we e used using a ge s and na u al con ol poin s, pe ec ly iden i ied and dis ibu ed in wo e - ical planes, one dis ibu ion on he wall o which he al a piece is a ached and ano he e ical plane ha cons i u es he s uc u e o he al a piece i sel . F om he pho og amme ic p ocess, a dense cloud o poin s was ob ained in Fig. 3, eaching 1.052.000 egis e ed su ace poin s. Con ol poin s we e aken by he LEICA Flexline TS02 o al s a- ion, wi h a p ecision o 2 mm [42]. A comple e desc ip ion o he pho og amme y p ocessing me hodology used is ound in p e ious wo k [43,44] and well de ined in he wo k low [45]. The o ien a ion o he base s a ion was ixed by means o he local XYZ coo dina es es ablished a a single poin o he p ojec which we e aken as 100, 100, and 10 m. Pho og amme y eco ding is pe o med using a NIKON D80 digi al e lex came a, wi h a 12 MP senso , wi h he ollowing size: 23.6–15.6 mm, Nikon DX AF-S NIKKOR 18 o135 mm /3.5– lens. 5.6 GE and a ipod. Focal leng h was 18 mm, op ical image s abilize , and exposu e ( ixed) 1/400 s 3.5. The CCD senso size was 23.6 mm ×15.8 mm, sp ead o e 3872 ×2592 pixels o maximum esolu ion in NEF RAW o ma . The ISO alue was se o 200. Once he image package was ob ained, i was p ocessed using Da k able so wa e [46], imp o ing he pa ame e s. This so wa e has he ad an age o being open-sou ce, allowing o imp o ed pho o de elopmen . Cu en ly, a la ge numbe o scien i ic s udies o S M a e ocused on de e mining he dis ibu ion o GCP and he numbe in ela ion o he quali y o he su ace. Bu o p o ide a oadmap o u u e esea ch on he quali y o geome y cap u e and ans o ma ion in he BIM en i- onmen , i is necessa y o compa e he wo se s o poin s TLS iG and S M iG egis e ed in he cul u al asse . Th ough Cloud Compa e’s au oma ic alignmen o he wo poin clouds and hei analysis using he ICP al- go i hm, we can de e mine he co e age pa ame e s on he su ace (CP). These co e age pa ame e s will be analysed om he applica ion o he Cloud Compa e ICP algo i hm acco ding o Fig. 4. Once he de ia ion esul s ha e been de e mined, i can be concluded ha he S M iG da a se is sui able o model pa s wi h simple geome ies, while he TLS iG da a se is mo e app op ia e o op imize he analysis o he p o iles. 4. O ganiza ion o he s uc u e o he BIM me hodology The BIM me hodology applied o he Ma ínez Mon a˜ n´ es al a piece in eg a es geospa ial echnologies o gene a e hyb id poin clouds, op imized using algo i hms such as ICP. The p ocess includes semi- au oma ic segmen a ion in CloudCompa e, pa ame ic modelling in A chiCAD wi h p og essi e LOD/LOK le els, and an inno a i e BFMP echnique o econs uc his o ical p o iles wi h millime e p ecision. Addi ionally, his me hodology phase e alua es Mesh- o-BIM me hods (Poisson, Meshlab) o in eg a e ex u ed o ganic elemen s, o e coming in e ope abili y limi a ions. Collabo a i e geo e e encing using BIM- Cloud and 3DReshape geome ic analysis ensu e ideli y o he o iginal. This app oach sys ema izes he documen a ion o complex he i age, combining digi al echnologies wi h his o ical and a is ic igo o conse a ion and s udy. 4.1. Fi ing o he poin cloud in he BIM pla o m To unde ake a BIM p ojec o his calib e and apply a me hodology, a se ies o impo an s eps mus be pe o med in an HBIM p ojec . Fi s , a wo king g oup mus be es ablished among p ojec ope a o s h ough a collabo a i e p ojec such as Teamwo k. The chu ch’s global poin cloud (TSi) is expo ed o geo- e e ence he con ex whe e he al a piece is Fig. 3. De ail o he dense cloud o poin s om he pho og amme y o he Al a piece by Ma ínez Mon a˜ n´ es. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 5 loca ed. Second, he modules o walls, pilla s, and a ches o he en i- onmen a e s uc u ed o subsequen ly inse he pho og amme y poin cloud and be geo- e e ence and loca ed in he BIM en i onmen , speci ically as a pa ial poin cloud (TSe). The essen ial pa in he s uc u e o he BIM eamwo k p ojec is he co ec geoposi ioning o he building plo , p o ided by he elec onic o ice o he Cadas e [47], en e ed in o an A chiCAD wo kshee and inse ed in o a geo- e e encing sys em. The s uc u e mus be adequa ely econside ed h ough wo k le els, which o he case s udy a e es ablished coinciding wi h he co nice le els. I eally is a p ocess o e hinking be o e s a ing he modelling o he building’s s uc u al sys ems bo h in i s ho izon al plane (x,y) and in i s e ical plane (x,z). The layou o he le els o he elemen is adjus ed o he le els o he chu ch model, aking in o accoun he le el o he g ound loo on which said u ni u e si s. The nex s ep is o o ganise he al a piece acco ding o he segmen a ion o he main and seconda y s uc u al uni s. In his sense, i is done wi h he help o se- man ic segmen a ion h ough he CloudCompa e so wa e. The classi- ica ion is done h ough he scala ield [48] aking di e en planes in which he su ace o he pic o ial pain ings can se e as impo an e e ence elemen s (see p e ious Fig. 2 b). Once segmen a ion by le el sec o s is achie ed, ela i e da a a e ob ained, helping o assemble he s uc u e. Subsequen ly, modelling begins wi h an LOD-100 o hose basic elemen s, p og essi ely inc easing he le els o de elopmen un il eaching he a isanal-le el wo k in BIM. Simila ly, he equi ed Le el o In o ma ion (LoK) is add essed, i s h ough non-g aphic cha ac e is- ics, which a e la e included, un il he knowledge LOK 400 is eached, co e ing he classi ica ion o damage, conse a ion, and p e en ion. 4.2. Teamwo k de elopmen We know om p e ious wo k [27] ha some pla o ms allow o he ansmission o coo dina ed in o ma ion be ween ope a o s in he same p ojec . These ac i i ies a e de eloped using he p e iously men ioned TeamWo k concep in A chiCAD so wa e [49]. The ac i e in e con- nec ion o TeamWo k begins by egis e ing he ope a o eam in BIM- Cloud, which will la e ha e access o all in o ma ion h ough a Vi ual P i a e Ne wo k (VPN). Ac ually, TeamWo k is a sys em o he ex- change o in o ma ion and in e ope abili y o he BIM pla o m ha was c ea ed by G aphiso in 1997. The c ea ion o an HBIM p ojec speci ically o e able s uc u es has a esea ch and knowledge p o- cedu e on how o app oach he wo k. Once he poin cloud is impo ed in o he HBIM p ojec , i is o ga- nized by le els o de elop he modelling. I is c ucial o ob ain a global TLS ix poin cloud o es ablish he con ex and en i onmen o he con- s uc ion on which he al a piece will be ins alled Fig. 5. Howe e , i is p e e able o inse i in geoposi ioned a he p ojec ’s o igin, segmen ed app op ia ely o acili a e ope abili y in he managemen o a la ge amoun o da a ( he global poin cloud o he in e io has eached 4.7 GB, 1.940.20 million poin s). (See Fig. 6.) The wo king me hod appllies o any o he ma e ial asse o a monumen al o a is ic na u e, which is why a gene ic me hodology o a p ecise wo k low is being de eloped. The impo o he TLS ix causes a slowdown o he sys em. The poin cloud wi h a esolu ion o 0.02 m esul s in a ile size o 2 GBy es o ope a ional pu poses. Fo his, he e is he possibili y o decima ing he poin cloud, his means dec easing he densi y o poin s in space in a o ally homogeneous way. We know ha he equipmen ’s cap u e can each he acquisi ion o mo e han one million poin s pe second acco ding o he speci ica ions o he manu- ac u e s o scanne p oduc s (TLS). To educe he p ocessing load o he so wa e, some au ho s [50] p opose o decima e he poin cloud, which can be done h ough he scanne ’s own p ocessing so wa e, such as Cyclone, Me ashape in he case o pho og amme y, p ocessing so wa e o poin clouds such as CloudCompa e and complemen a y so wa e linked o BIM pla o ms, in he case o Re i and Recap. Mos me hods decima e he poin cloud o speed up he p ocess o so wa e in building eplica applicabili y in BIM. Bu decima ing he poin cloud means losing con igu a ion p ope ies and quali y in e ms o i s shape and a ibu es, so he ope a o mus assess he limi s o his p ocessing. O he ields o de elopmen a e he alida ion o he decima ion o he se o poin s wi h op imal alues, and p o iding ep esen a i e images o he Mesh- o-BIM p ocess [48]. Following he wo k on le els o he HBIM p ojec , he al a piece s uc u es ha e he peculia i y o being engaged in a e ical plane, whe e heigh and wid h p edomina e. As he e is no basic CAD planime y, we ha e wo ked di ec ly wi h he o hogonal plans p o ided by he poin cloud and modeled di ec ly wi h i s e e ence wi hin he BIM p ojec . Yes, in he cases o analysis whe e o hopho os a e ob ained by means o pho og amme y, i would be e y in e es ing o es ablish Fig. 4. a) Analysis o he di e ence be ween he TLS iG and he S M iG . poin cloud. Resul o applying he C2C algo i hm whe e he colou map shows he dis ance dis ibu ion, b) his og am o he analysis. His og am uni s: me es (X axis) and numbe o poin s (Y axis). J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 6 wo kshee s wi h di e en o hog amme ic p ojec ions. This way o p oceeding can de ec me ic disc epancies be ween massi e da a cap- u e sys ems. The e o e, in his wo k, he disc epancies be ween he poin cloud ob ained by he S M and he TLS in i s h ee dimensions we e also e alua ed in Fig. 4. Nex , a ne wo k sys em o axes linked o he p ojec is ob ained, and he al a piece-a chi ec u al s uc u e. Nie o e al. [27] men ioned he eno mous ad an ages o hese auxilia y sys- ems ha allow di ec linkage wi h singula poin s o he p ojec . F om his, he uni s a e buil acco ding o hei ma e ial cha ac e is ics - ype o s uc u al wood - h ough p o iles and deco a i e elemen s on he ou de eloped le els. I is necessa y o hink ha 3D econs uc ion based on s uc u e models can bene i om he g amma o o ms o iginally in oduced by S ing and Gips [51] o models o pain ings sculp u es and ha we e ans e ed o a chi ec u e and u banism. A o m g amma in p inciple de ines he geome ic- o mal language, which is a se o ini e-leng h sequences o symbols [52]. The al a pieces as a chi ec u al uni s can be di ided and ep esen ed by a se o basic geome ic o ms, hese o ms a e go e ned by Mu phy e al. [24] by eplacemen ules in which a shape can be changed o eplaced by ans o ma ions. The o iginal idea o hese au ho s is o model, h ough o m g amma , he a chi ec u al languages o classical a chi ec u e, implemen ed using he cons uc ion o pa ame ic objec s. Fig. 5. Visualisa ion o he poin cloud o he in e io o he Chu ch o he Annuncia ion. 1940.20 million poin s (Leica T uwiew). Fig. 6. Co nice con ou s p ocessed using Cloud Compa e. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 7 4.3. Geome ic cha ac e isa ion o he p o ile uni s The iden i ica ion o he geome ic ules go e ning he di e en p o iles ha cons i u e he s uc u e o an al a piece model is necessa y o in e p e he s uc u e’s inal concep . The de ini ion o he geome ic shape o an elemen wi h his o ical and a is ic in e es h ough physical and digi al models is a solid a emp o he speci ic analysis o olu- me ic, o mal, cons uc i e, and s uc u al analysis aspec s. The mo e complex he shape, he mo e c ucial i is o eliably ela e i o a co ec geome ic ma ix [53], o allow he bes in e p e a ion o he e olu ion o he cons uc ion [54] and i s adap a ion o he eal shape. Thus, one o he me hodological p ocesses desc ibed by Flo iano e al. [53] in ol es he Bes Fi Analysis (BFA whe e he p ocessing aims o iden i y he mos p obable design shape o a dome by de e mining he unde lying geo- me ic ules. When building a s uc u e composed o mul iple p o iles, i is a challenging o es ablish he geome ic cha ac e isa ion o each o he co nices o subsequen modelling. To add ess his, a wo k low was de eloped based on a new me hodology aimed a ob aining he bes i model p o iles - Bes Fi Model P o iles (BFMP). This model was de el- oped a e se e al so wa e based expe imen s h ough he compa ison and gene a ion o p o iles such as he 3DReshape so wa e [55], now know as Cyclone 3DR, h ough a modelling p ocess based on he poin cloud. The idea o using his new me hodology eme ged a e lea ning abou he po en ial o ce ain so wa e applica ions used o e alua e linea unnel ajec o ies o epo ing pu poses in ci il enginee ing. Cu en ly, he HBIM knowledge a ea ques ions wo app oaches ha can be conside ed as basic hypo heses o a gene al na u e; i) The i s is whe he we can build geome ic componen s om su eys, wi hou using he pa ame ic objec lib a y; and ii) The second is o ollow he logic o he ope a ion o scan- o-BIM [56]. Scan- o-BIM makes i possible o gene a e a 3D model om he poin cloud, o which he e a e semiau oma ic p ocedu es se ou in he con ex o a chi ec u al he i age [57]; Bu he ques ion ha a ises is whe he he semi-au oma ic p o- cedu e e lec s he ue eali y o he complex geome y o he pa imony o is i simply a simpli ica ion. To add ess his p oblem, his esea ch p oposes ha each o he p o iles ca aloged in he al a piece da abase be ca ied ou using a Bes Fi Model P o iles (BFMP) model. This p ocedu e gua an ees he eliabili y o he p oposal o he pa ame ic model. The basis o he wo k is he pe o ming o a segmen a ion o each o he co nices wi h he help o he Cloud Compa e so wa e [58]. Fo his pa o he campaign, he la ge co nice o he en abla u e o he second body is aken (6). The geome ic analysis p ocedu e begins wi h he expo o he S M iX1 poin cloud o 3DReshape , and subsequen ly an analysis a pola con ou analysis o he comple e su ace o he elemen is pe o med, o de e mine he a ia ions ha occu , and i hese al e a ions o he su - ace eco ded by he poin cloud you can de e mine an op imal esul Figu e. To cla i y he p ocess o his phase, he co nice is aken Fig. 7, he pa analysed in his case is a p o uding body, since he co nice does no ha e a s aigh di ec ix along he en i e wid h o he al a piece’s en abla u e. An analysis o each o he s aigh ac ions is ca ied ou . Once he analysis o pola con ou s has been ca ied ou , i is possible o de e mine om se e al sec ions pe pendicula o he di ec ix o he cloud o poin s o he co nice in Fig. 8 a, he model ha go e ns he geome ic ules. The S M iX1 se o poin s p o ides p ecise in o ma ion abou he geome y and also p o ides us wi h he a ia ions o he ules es ablished be ween he gene al p o ile model wi h and o he igu es ha appea along he ajec o y o he co nice and ha mus be aken in o conside a ion. F om he se o poin s de e mined in he 3DReshape so wa e, we de i e a mesh su ace ha ep esen s he model o he chosen co nice. The op imisa ion algo i hm allows one su ace o be mo ed o e ano he in o de o compa e he dis ance be ween poin s ha make up he di e en p o iles Fig. 7. In he selec ion p ocess, he ope a o selec s he blue- ones ange wi hin he pola con ou band, ep esen ing he lowes dispe sion be ween he alues. The op imized p o ile will be iden i ied wi hin his chosen band. The esul o he compa ison be ween he op imized p o ile and he eal p o ile ex ac ed om he poin cloud indica es ha he di e ences can ange be ween 7 and 9 mm (g een colou ange), hus leading o he c ea ion o he bes i p o ile model. Taking in o accoun he USIBD [59] guide ange he esul would be a ound LOA 40–50. Th ough he 3D de ia ion colou map in Fig. 7, i is possible o isualize he ou come o he geome ic Bes Fi Model P o ile (Figu e b). The p o ile op imized h ough his p ocedu e is expo ed in ec o o ma (.dx ) o be inse ed in o he BIM model, as pa o he modelling p ocess. Conse a o s, a chi ec s, and enginee s can use he imple- men a ion o a geome ic p ocess based on geode ic da a ob ained h ough he MCDSs and e alua e, h ough an analy ical model, he non- a bi a y selec ion o a p o ile ha in o he cases could o e li le eli- abili y o a p o ile ha in o he cases could o e li le gua an ee. Once he analy ical p ocess o he geome ic BFMP Fig. 9 has been esol ed Fig. 7. Analysis o he pola con ou s o he co nice. The his og am shows he de ia ions along a mesh plane gene a ed by same so wa e. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 8 wi h he a iable su ace elemen s pe pendicula o he co nice di- ec ix, he me hod can be ex ended o ind o he p o iles ha gene a e a change in he co nice ajec o y. Fo example, Fig. 10 shows how he lines ha join i s nodes can de e mine a con inuous uled su ace and whe e he de ia ion occu s h ough he ex eme colou s o i s pa s. A uled su ace sa is ies eq. 1 ha : (u, ) φ c(u) + w(u). Fig. 8. a) Iden i ica ion o poin s ex ac ed om p o iles. b) S aigh sec ions gene a ed by e ical planes. Fig. 9. De ia ion o he op imized p o ile and p o ile h ough he poin cloud. The colou pale e illus a es he ange o de ia ions, while he b own su ace ep esen s he mesh gene a ed by Cyclone 3DR. (Fo in e p e a ion o he e e ences o colou in his igu e legend, he eade is e e ed o he web e sion o his a icle.) Fig. 10. De ia ion om he op imized p o ile and discon inuous p o ile. The colou pale e illus a es he ange o de ia ions. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 9 Wi hin he scope o he geome ic cha ac e isa ion o complex su - aces ha cons i u e he s uc u e o he al a piece, p o ile e alua ion enables e ec i e analy ical p ocedu es. Thus, in his esea ch, he e is an analysis o he p o ile called he bes - i p o ile, which is ac ually an op imized p o ile. Ce ain scien i ic s udies al eady show he impo ance o e i ying he 3D models o he p ojec s, so ha he dimensions and shape a e ixed in an exhaus i e ep esen a ion [88]. Wi h his aim, an analy ical compa ison model was de eloped o con as he bes - i p o ile wi h he o iginal mesh gene a ed om he poin cloud. The da a was ob ained om a agmen o he co nice and p ocessedusing he Cyclone 3DR so wa e (Fig. 20). Based on he di e en p o iles, measu emen s o he espec i e de- ia ions be ween he mesh and he poin cloud a e ob ained, he eby de e mining hei co esponding change indica o s. The analysis o co nice discon inui ies is conduc ed using Cyclone 3DR ool [89] o compa e he unnel geome y. Al hough his p ocedu e is de eloped o he analysis o de ia ion in closed geome ies o ci il enginee ing, h ough he s udy i has been possible o ob ain a se o esul s o he Fig. 19. Edi ing scheme o he HBIM p ojec . De ini ion o he “Damage Analysis” o he pain ed objec . Fig. 20. Rep esen a ion o he mesh di e ence be ween he bes - i model (blue colou ) and he mesh gene a ed om he se o co nice poin s (b own colou ), analysis in Cyclone 3DR. (Fo in e p e a ion o he e e ences o colou in his igu e legend, he eade is e e ed o he web e sion o his a icle.) J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 16 de ia ion be ween BFMP and each o he p o iles gene a ed by he so wa e. The p ocedu e begins by selec ing a e e ence p o ile, om which a c oss-sec ion is c ea ed, ollowed by he gene a ion o successi e sec- ions along he neu al axial axis ha uns he ull leng h o he co nice. The so wa e i sel de elops a g aph o he gene a ion o he di e en p o iles as shown in Fig. 21. In he scien i ic li e a u e and as a as we ha e been able o in es iga e, only Koehi e al. [90] wo k on unnel analysis, bu in a e y succinc way wi hou eaching he de ia ion analysis o each one o he p o iles and Gikas [91] o compa e he p e- cision be ween he TLS and a o al s a ion (ST) o , las ly, e y ecen ly, Xiang [92] who de elops a compa ison diag am model. In any case, i is he i s documen on he analysis o p o iles in wo ks o a , applying a poin -based change es ima ion me hod. This s udy p ocedu e leads us o de e mine a se ies o geome ic cha ac e isa ion o discon inui ies o complex shapes in a chi ec u e such as he analysis o an al a piece, which al hough i does no ha e he na u e o he impo ance o he unce ain y ha is gene a ed in ci il wo ks, i is impo an o igo ously es ablish he p ecise geome y o an a is ic wo k. The wo k low o he connec ion be ween he di e en so wa e and he applicabili y o he BIM so wa e is shown in Fig. 22. (See Fig. 23.) Once he ou pu da a se is ob ained, an analysis is ca ied ou on each o he six p o iles gene a ed in o de o e alua e he discon inui ies p esen in he cap u e p ocess be ween he op imized p o ile and and he emaining c oss-sec iona he p o iles o he co nice. A o al o 58 mea- su emen s gene a ed by Cyclone 3DR so wa e ha e been de eloped. The limi s o he spacing o poin s ob ained and ha de ine each one o he sec ions o he p o ile can ake posi i e alues i hey a e abo e he op imal cu e o nega i e below he cu e; he e o e, he uppe g aph o Fig. 13 i includes alues abo e 0.00 and below i . In he case o P o ile 2, he numbe o poin s gene a ed has been lowe in P o iles 4, 5, and 6. This numbe o poin s (37), which ep esen s P o ile 2, ma ks a s aigh sec ion o a mesh whose leng h is sho e han o he p o iles, see Fig. 20 in blue, and he sa is ac ion o he ange o bes p o iles ob ained using BFMP o he case s udy. o he al a piece is de e mined in he box-and- whiske plo . In he lowe pa o he g aph, he de ia ion alues in each o he p o iles a e ep esen ed by means o box diag ams, wi h p o iles 4 and 6 being he bes i s and hose ha ep esen ewe de ia ions eaching s anda d de ia ion alues o 0.00796 and 0.00944 m. In he able 1 ou side g aph he minimum, maximum, and median alues o he esul s ob ained can be de e mined. I should be no ed ha he simple absolu e de ia ion (Dx) is in he alue o 0.0125 m, acco ding o eq. 4. The dispe sion is ep esen ed in he g aph by means o he simple absolu e de ia ion be ween he mesh gene a ed om he pho og am- me y poin cloud and he mesh gene a ed om he op imal p o ile. The me ic a ia ions ep esen ed in Figu e include he o al wid h o he analysed co nice. The a e age a ia ion was analysed along he a e ac , as Moyano e al. [93]. The a e age alue yielded e o s (Δ Z ), and he simple absolu e de ia ion (Dx) was calcula ed as pe Eq. 4. Dx=∑ N i=1 |xi −x| N(4) whe e (Dx) is he simple absolu e de ia ion, N is he sample size, x accoun s o he obse ed alues and x is he a e age alue o he sample (in me e s). On he o he hand, he con igu a ion o an a chi ec u al wall s uc- u e, which is s uc u ed in e y cha ac e is ic pa s and elemen s such as columns, sha s, capi als, lin els, pedimen s, and co nices, is add essed unde an HBIM amewo k o pa ame ic elemen s. The e o e, he cons uc ion o hese s uc u es is easily accep able. On his conside a ion, a s udy amewo k is add essed whe e he p ocess o he cloud o poin s o he BIM model, would go h ough a s udy o con e he di e en 3D sculp u es ha make up he al a piece o mesh. Howe e , in eg a ing hese de ailed h ee-dimensional models in o BIM en i onmen s necessi a es he use o in e media e so wa e pla - o ms, as s anda d BIM ools o en lack he capaci y o na i ely handle complex ex u ed meshes. The e o e, se e al da a p ocessing wo k lows mus be ca ied ou ac oss di e en so wa e en i onmen s o ensu e ha he inal BIM model e ains op imized ex u e quali y, achie ing a balance be ween p ocessing e iciency and isual ideli y. Mo eo e , he esul ing mesh models mus be agile and ully ope a ional wi hin he chosen BIM sys em o suppo u he applica ions such as documen a- ion, conse a ion, o isualisa ion. In his ega d, Rhinoce os so wa e se es as he p ima y pla o m o p ocessing and managing models ha include pic o ial o a is ic ex u es, ensu ing a eliable ounda ion o subsequen in eg a ion in o he BIM wo k low. O he conside a ions o be aken in o accoun a e hose ela ed o he seman ic eco d o he elemen s ca aloged in he HBIM al a piece p oj- ec . In his ega d, he app op ia e use o en i ies, as indica ed in he Fig. 21. C ea e sec ions along he axis, using Cyclone 3DR so wa e. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 17 PlanBim guide [94], ou lines wel e key poin s o he deli e y o a BIM model. These wel e c i e ia o he classi ica ion sys em a e an essen ial pa o he egula ions, whe e he code plays a i al ole in he iden i- ica ion o objec s. The En i y In o ma ion Ma ix (EIM), designed o add ess he chal- lenge o an o de ly and well-s uc u ed classi ica ion, is c ucial be o e s a ing he building in o ma ion modelling, an o iginal con ibu ion in he ield o al a piece s udies. The s uc u e is o med om he segmen a ion o he s uc u al uni s ha make up an al a piece o a chi ec u al açade The way o p oceed in BIM o expo he model, in Excel o ma , mus be main ained om he beginning h ough diag ams on he same BIM pla o m. A he same ime, he laye ed model can be p ese ed o use ia wo kshee s wi hin he BIM so wa e i sel . The e- o e, all his in o ma ion mus be pa o he HBIM p ojec . This ep e- sen s he ini ial s ep owa ds he implemen a ion o he model in he he i age sciences sec o , in ol ing he o ganiza ion o geome ic Fig. 22. Wo k low ha explains he p ocess om he segmen a ion o he co nice wi h he iden i ica ion o a s a is ical s ep ha shows he geome y o he seg- men a ion o he co nice, hen choosing he bes p o ile adjus men model o achie e he op imal geome y o expo i o he BIM en i onmen . Fig. 23. G aph o he de ia ions o he six p o iles analysed and absolu e de ia ion. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 18 elemen s p io o pa ame ic modelling, whe e he ele an IFC s an- da ds a e in eg a ed in o he inal p ocess. A e e iewing ecen wo k and analysing he con ibu ion p e- sen ed, he main limi a ion we encoun e ed is he au oma ion o com- plex elemen s in BIM. One o he majo challenges in his wo k is ans e ing igu es and a e ac s wi h ex u es in o hese new pla o ms. This is based on he ac ha , while quali a i e in e p e a ion o a scene comes na u ally o humans, compu e s s ill ace ce ain limi a ions, despi e signi ican ad ances in compu e enginee ing. These limi a ions a e gene ally ela ed o so wa e [95]. Ano he impo an issue o esol e is he abili y o BIM pla o ms o wo k di ec ly wi h poin clouds in a simul aneous manne . Cu en ly, some companies, such as Solu ions GmbH, ha e de eloped a poin cloud manage o A chiCAD and o he pla o ms. This allows iles o be impo ed wi hou going h ough he . e57 o ma , and om a wide a ie y o bo h s uc u ed and uns uc u ed iles. 7. Conclusions The ac ions in ol ed in he 3D digi isa ion o Cul u al He i age can be unde s ood as a p ocess o con e sion and ans o ma ion h ough au oma ion, pa icula ly when applying analy ical me hodologies o da a acquisi ion eco ds. The modelling p ocesses equi e wo k phases ha in eg a e sys ema ic p ocesses ha comp ise he di e en s ages, om analogue measu emen s o measu emen s based on senso s and lase emissions and modelling o his o ical in o ma ion. Technological de ices, as well as audio isual con en om use s wi h en i ies o h ee-dimensional objec en i ies, ha e pu he indus y on a de elopmen plane. The Indus ial Re olu ion 4.0 which highligh s he le el o ope a ional echnology wi h he le el o in o ma ion echnology is changing he way o unde s anding he indus y and cons uc ion sec o . The e o e, in his app op ia e di ec ion owa ds new models o digi al ans o ma ion. An o iginal wo k ha is based on an inno a i e s uc u e he analysis o he s udy o s uc u es, o mo able and immo able p ope y. Di e en analysis me hodologies a e p oposed h ough e e se enginee ing ha allows he econs uc ion o a model o cons uc ion model in a complex and di icul o in e p e ield such as Cul u al A is ic He i age. F om pho og amme y, an expe imen al p ocess was de eloped, ocusing on he geome ic analysis o he p o iles ha compose he s uc u e o an al a piece. The use o speci ic algo i hms applied and based on a new me hodology o achie e he Bes Fi Model P o iles (BFMP) model was explo ed, eaching he poin o es ablishing models close o measu emen s o uni s o millime e s. P o ile measu emen s can be used o in e shape knowledge and es ima e he mos e icien and accu a e sec ion om his p oximi y analysis o u he cons uc ion. The uppe co nice was used as a es bench, op imizing he model om he gene a ion o di e en successi e p o iles. Al hough o u u e wo k, es benches will be adop ed wi h g ea e di icul y in he shapes and complexi y o he cu a u es, in o de o obse e he beha iou s h ough o he pa ame e s. The quali y o he pho og amme y egis a ion model was compa ed wi h he esul an ex ac ed om he e es ial lase scanne , which has made i possible o de e mine he es ima ed p ecision gua an ee o he his o ical building in o ma ion model. The o ganiza ion o he da a in a BIM p ojec s uc u e equi es an e icien in e ope abili y alid o all he collabo a o s in ol ed. This link be ween ope a o s can be de el- oped h ough an A chiCAD Teamwo k p ojec en i onmen , whe e da a is sha ed, e eshed, and app o ed, based on he BIMcloud amewo k. A obus pla o m o mul idisciplina y collabo a ion in design and da a ansmission be ween a chi ec s, enginee s, and es o e s. The la es inno a ions ocus on secu i y and immedia e da a synch onisa ion, wi h an in e connec ion ia Vi ual P i a e Ne wo k (VPN). The base o a selec ion o ound objec s such as he sculp u e in he cen e o he al a piece, o i s inse ion in he BIM pla o m, in- co po a es one o he mos di icul asks gi en he wo k low ha i en ails be ween di e en so wa e. Fo his wo k, se e al su eys we e ca ied ou on he basis o p ocessing om he cloud o poin s o he al a piece in which Jesus is bap ised by Sain John. Cu en ly, inse ing a ex u ed mesh in o BIM pla o ms is mo e complica ed han building he s uc u e i sel , since he mesh mus con ain he UV mapping image assigned o he digi ised 3D model. In he u u e, i will be possible o s udy new ways and wo k lows ha simpli y he mesh using ‘Guadmesh in Rhino” and expo his objec o A chiCAD image models. The choice o he case s udy jus i ied he knowledge o he p oblem o a eal a e- ac , segmen ed om he global poin cloud o complemen he al a - piece s uc u e. One o he main scien i ic con ibu ions o his wo k has been he c ea ion o a classi ica ion s uc u e acco ding o he BIM classi ica ion sys em. When models a e es ablished ha imp o e in e ope abili y in his wo k, he En i y In o ma ion Ma ix (EIM) is c ea ed, which is an in o ma ion exchange and s uc u e classi ica ion scheme. This p ocess ollows an analy ic ma ix model in which each s uc u e can inco po- a e iden i iable ID codes s uc u ed in o classes, subclasses, and ele- men s. Each and e e y one o he s udies o acades, analysis o buildings, po als, cou ya ds con aining a chi ec u al s uc u es in he con ex o 3D scanning and his o ical in o ma ion models o he building should in ou opinion con ain he En i y In o ma ion Ma ix. This new model c ea ed on he basis o e lexions on a chi ec u al s uc u es is he key o knowledge in he iden i ica ion o elemen s in a la e s age o he de elopmen and cons uc ion o he model. A en ion o da a quali y, seman ic classi ica ion, and in e disciplina y collabo a ion is c ucial o ensu e ha models se e no only as accu a e ep esen a ions bu also as e ec i e ools o he conse a ion and managemen o cul u al he i age. In he u u e, hese implemen a ion models should be explo ed o po en ial applica ions in o he conse a ion domains, including di- agnos ics, ma e ial s udies, and deg ada ion assessmen s, among o he s. The ocus he e is on he use o His o ic Building In o ma ion Modelling (HBIM) in he conse a ion o wo ks o a . I is well es ablished ha he HBIM me hodology is e ec i e no only o ca aloguing bu also o he eco e y and planning o conse a ion and es o a ion p ojec s o a chi ec u al asse s, while also es ablishing links be ween he app oach and he me hodologies employed. Howe e , due o he complexi y o he s udy, he e is a u u e in en ion o apply he scalabili y o hese me hods o o he ypes o mo able cul u al he i age o mo e complex a chi ec- u al objec s. CRediT au ho ship con ibu ion s a emen Juan Moyano: W i ing – e iew & edi ing, W i ing – o iginal d a , Valida ion, Supe ision, So wa e, Resou ces, Me hodology, In es iga- ion, Funding acquisi ion, Fo mal analysis, Da a cu a ion, Concep uali- za ion. E a Ma ínez: Valida ion, So wa e. Juan E. Nie o-Juli´ an: Visualiza ion, Supe ision, So wa e, Fo mal analysis. Ma ía Fe n´ an- dez-Alconchel: Supe ision, P ojec adminis a ion, Funding acquisi ion. Decla a ion o compe ing in e es The au ho s decla e ha hey ha e no known compe ing inancial in e es s o pe sonal ela ionships ha could ha e appea ed o in luence he wo k epo ed in his pape . Acknowledgmen s This esea ch was unded by he Uni e si y o Se ille h ough he VII Own Resea ch and T ans e Plan (VII PPIT-US). The au ho s hank he Adminis a ion o he Uni e sidad de Se illa o p o iding access o he building. Thanks o he Adminis a ion o he SGI Fo o eca-Labo a o io de A e o he Uni e si y o Se ille. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 19 Da a a ailabili y No da a was used o he esea ch desc ibed in he a icle. Re e ences [1] M. Vecco, A de ini ion o cul u al he i age: om he angible o he in angible, J. Cul . He i . 11 (2010) 321–324, h ps://doi.o g/10.1016/j.culhe .2010.01.006. [2] S. Cu si, D. Simeone, I.A. Toldo, Seman ic web app oach o buil he i age ep esen a ion, in: In e na ional Con e ence on Compu e -Aided A chi ec u al Design Fu u es 527, Sp inge -Ve lag, Be lin Heidelbe g: Be lin, Heidelbe g, 2015, pp. 383–401. [3] Zayed Ta ek, Al-Sakka Abobak , BagchiAshu osh a sus ainabili y based amewo k o e alua ing he he i age buildings, In . J. Ene gy Op im. Eng. 9 (2020) 49–73, h ps://doi.o g/10.4018/IJEOE.2020040105. [4] A. Osello, G. Lucibello, F. Mo gagni, HBIM and i ual ools: a new chance o p ese e a chi ec u al he i age, Build 8 (2018) 12, h ps://doi.o g/10.3390/ BUILDINGS8010012. [5] A. Mo ales, Pa imonio his ´ o ico a is ico conse aci´ on de bienes cul u ales, 1996. [6] Digi alEu ope Digi al building ans o ma ions o Eu ope’s g een eno a ions: Sus ainable li ing and wo king, A ailable online, h ps://www.digi aleu ope.o g / esou ces/digi al-building- ans o ma ions- o -eu opes-g een- eno a ions-sus ain able-li ing-and-wo king/, 2025. [7] C. Boje, A. Gue ie o, S. Kubicki, Y. Rezgui, Towa ds a seman ic cons uc ion digi al win: di ec ions o u u e esea ch, Au om. Cons . 114 (2020) 103179, h ps://doi.o g/10.1016/J.AUTCON.2020.103179. [8] D. Ha mann, H. an de Auwe ae , Digi al Twins, in: SEMA SIMAI ol. 5, Sp inge Se ies; Sp inge Science and Business Media Deu schland GmbH, 2020, pp. 3–17. [9] N. Gim´ enez, J. F ancisco, La conse aci´ on del Pa imonio A qui ec ´ onico. Deba es he edados del siglo XX, in: Nogue a Gim´ enez, Juan F . La Conse . del Pa im. A qui . Deba es he edados del siglo XX. En A s longa Cuad. a e, 2002, No. 11 107–123, 2002. [10] G. Ca o i, I. Ma ínez-Espejo Za agoza, A. Piemon e, Range and image based modelling: a way o escoed aul ex u ing op imiza ion, ISPRS - In . a ch. Pho og amm. Remo e Sens. Spa . In o m. Sci. XL-5/W4 (2015) 285–290, h ps:// doi.o g/10.5194/ISPRSARCHIVES-XL-5-W4-285-2015. [11] UNESCO Concep o de Pa imonio Digi al, A ailable online, h ps://en.unesco. o g/ hemes/in o ma ion-p ese a ion/digi al-he i age/concep -digi al-he i age, 2025. accessed on Jan 21, 2022. [12] D. Sand on, A. Tallon, No e Dame Ca hed al, No e Dame Ca hed . (2020), h ps://doi.o g/10.1515/9780271087726/HTML. [13] M. Bassie , S. Vincke, R. de He nandez, M. Ve gauwen, An o e iew o inno a i e he i age deli e ables based on emo e sensing echniques, Remo e Sens. 10 (2018) 1607, h ps://doi.o g/10.3390/RS10101607. [14] O. Can os Ma ínez, J.M. Lodei o P´ e ez, F.J. Laguna Rod íguez, La o og ame ía como apoyo g ´ a ico en la es au aci´ on de e ablos escul ´ o icos en made a polic omada, Pa im. Cul . Espa˜ na (2009) 237–251. ISSN 1889–3104, No. 1, 2009, p´ ags. 237–251. [15] M. D´ a ila, Res i uci´ on o og am´ e ica de e ablos. Na es la e ales de la Iglesia de San Jacin o, Ca acas, Bluche Des. P oc. (2014) 158–161, h ps://doi.o g/ 10.5151/DESPRO-SIGRADI2014-0028. [16] K. Hanke, M. Mose , R. Rampold, K. Hanke, M. Mose , R. Rampold, His o ic pho os and TLS da a usion o he 3D econs uc ion o a monas e y al a ensemble, ISPA XL5 (2015) 201–206, h ps://doi.o g/10.5194/ISPRSARCHIVES-XL-5-W7-201- 2015. [17] R. A giolas, A. Cazzani, E. Reccia, V. Bagnolo, F om lida da a owa ds HBIM o s uc u al e alua ion, In . A ch. Pho og amm. Remo e Sens. Spa . In . Sci. - ISPRS A ch. 42 (2021) 125–132, h ps://doi.o g/10.5194/ISPRS-ARCHIVES-XLII-2-W15- 125-2019. [18] E. Abba e, S. In e nizzi, A. Span` o, HBIM pa ame ic modelling om clouds o pe o m s uc u al analyses based on ini e elemen s: a case s udy on a pa abolic conc e e aul , Appl. Geoma . (2020) 1–18, h ps://doi.o g/10.1007/S12518-020- 00341-4/FIGURES/17. [19] G. Rocha, L. Ma eus, J. Fe n´ andez, V. Fe ei a, A scan- o-BIM me hodology applied o he i age buildings, He i 3 (2020) 47–67, h ps://doi.o g/10.3390/ HERITAGE3010004. [20] M. Bassie , G. Hadjideme iou, M. Ve gauwen, Implemen a ion o scan- o-BIM and FEM o he documen a ion and analysis o he i age imbe oo s uc u es, Digi . He i . P og. Cul . He i . Doc. P ese . P o . 1 (2016) 79–90, h ps://doi.o g/ 10.1007/978-3-319-48496-9. [21] F. Bosch´ e, M. Ahmed, Y. Tu kan, C.T. Haas, R. Haas, The alue o in eg a ing scan- o-BIM and scan- s-BIM echniques o cons uc ion moni o ing using lase scanning and BIM: he case o cylind ical MEP componen s, Au om. Cons . 49 (2015) 201–213, h ps://doi.o g/10.1016/j.au con.2014.05.014. [22] N. Hidaka, T. Michikawa, A. Mo amedi, N. Yabuki, T. Fukuda, Polygoniza ion o poin clouds o epe i i e componen s in ci il in as uc u e based on geome ic simila i ies, Au om. Cons . 86 (2018) 99–117, h ps://doi.o g/10.1016/J. AUTCON.2017.10.014. [23] M. And iasyan, J. Moyano, J.E. Nie o-Juli´ an, D. An ´ on, F om poin cloud da a o building in o ma ion modelling: an au oma ic pa ame ic wo k low o he i age, Remo e Sens. 12 (2020) 1094, h ps://doi.o g/10.3390/RS12071094. [24] M. Mu phy, E. McGo e n, S. Pa ia, His o ic building in o ma ion modelling - adding in elligence o lase and image based su eys o Eu opean classical a chi ec u e, ISPRS J. Pho og amm. Remo e Sens. 76 (2013) 89–102, h ps://doi. o g/10.1016/j.isp sjp s.2012.11.006. [25] D. O eni, R. B umana, A. Geo gopoulos, B. Cuca, HBIM lib a y objec s o conse a ion and managemen o buil he i age, In . J. He i . Digi . E a 3 (2014) 321–334, h ps://doi.o g/10.1260/2047-4970.3.2.321. [26] J. Ga cía-Le´ on, P. S´ anchez-Allegue, C. Pe˜ na-Velasco, L. Cip iani, F. Fan ini, In e ac i e dissemina ion o he 3D model o a ba oque al a piece: a pipeline om digi al su ey o game engines, SCIRES-IT - Sci. Res. In . Technol. 8 (2019) 59–76, h ps://doi.o g/10.2423/I22394303V8N2P59. [27] J.E. Nie o-Juli´ an, L. La a, J. Moyano, Implemen a ion o a TeamWo k-HBIM o he managemen and sus ainabili y o a chi ec u al he i age, Sus ainabili y 13 (2021) 2161, h ps://doi.o g/10.3390/su13042161. [28] C. Bone Blanco, El e ablo ba oco, escenog a ía e imagen, in: P oceedings o he El Monas e io del Esco ial y la pin u a (Ac as del Simposium); Se illa, ed. F.J.C. y F. de, Ed.; San Lo enzo de El Esco ial: Real Colegio M a C is ina, 2001, pp. 623–642. [29] G. Bo uso, W. Huang, G. Balle o, W. Kainz, N. Ab eu, A. Pin o, A. Ma os, M. Pi es, P ocedu al poin cloud modelling in scan- o-BIM and scan- s-BIM applica ions: a e iew, ISPRS In . J. Geo-In o ma ion 12 (2023) 260, h ps://doi.o g/10.3390/ IJGI12070260. [30] J. La i a Díaz, Con e encia sob e el e ablo de San Juan el Bau is a de la iglesia con en ual de Nues a Se˜ no a del Soco o, in: Bole ín Bellas A es, ISSN 0210–6531, No. 4, 1939 (Ejempla Dedic. a Homen. a Ma ínez Mon a˜ n´ es (1568–1649)), 1939, pp. 139–150. [31] L.M. La a, Juan Ma ínez Mon a˜ n´ es, au o de la aza del p imi i o e ablo de F ancisco de Rioja en el con en o de Las Te esas de Se illa, Lab. ARTE 21 (2008) 395–409, h ps://doi.o g/10.12795/LA.2008.I21.21. [32] He n´ andez Díaz, J. Es udio iconog ´ a ico y ´ ecnico de la imagine ía mon a˜ nesina. Bole ín Bellas A es, ISSN 0210–6531, No. 4, 1939 (Ejempla Dedic. a Homen. a Ma ínez Mon a˜ n´ es (1568–1649)), p´ ags. 54–104 1939. [33] I.A. de Cul u a, de P oyec o de conse aci´ on “ e ablo de San Juan Bau is a” (1610–1620-1622); Se illa, 2020. [34] S. Be acchi, G. Be acchi, L. Cip iani, Chiu o labo a o y: in eg a ion o wo k lows om digi al su ey o op imised 3D u ban models o in e ac i e explo a ion, Appl. Geoma . (2021) 1–20, h ps://doi.o g/10.1007/S12518-020-00352-1/FIGURES/ 13. [35] E.L.A. Bo dini, Le obbiane al San ua io della Ve na : spe imen azioni di ilie o digi ale e modellazione 3D =The obbiane a he Sanc ua y o La Ve na : digi al su ey and 3D modeling expe iences. Le obbiane al S . della Ve na Spe . di ilie o Digi . e Model. 3D = obbiane Sanc ua y La Ve na Digi . Su . 3D Model. Exp, 2019, pp. 761–768, h ps://doi.o g/10.36165/1184. [36] J. Moyano, ´ A. Jus o-Es eba anz, J.E. Nie o-Juli´ an, A.O. Ba e a, M. Fe n´ andez- Alconchel, E alua ion o eco ds using e es ial lase scanne in a chi ec u al he i age o in o ma ion modeling in HBIM cons uc ion: he case s udy o he La Anunciaci´ on chu ch (Se ille), J. Build. Eng. 62 (2022) 105190, h ps://doi.o g/ 10.1016/J.JOBE.2022.105190. [37] H. Pa k, D. Lee, Compa ison be ween poin cloud and mesh models using images om an unmanned ae ial ehicle, Measu emen 138 (2019) 461–466, h ps://doi. o g/10.1016/J.MEASUREMENT.2019.02.023. [38] M. Bo e o, L.R. S o h, A p oposal o he s anda dized epo ing o e o and Pa ada a ega ding s uc u e om mo ion (S M) 3D models used in eco ding and consolida ing a chaeological a chi ec u e, Ad . A chaeol. P ac . 8 (2020) 376–388, h ps://doi.o g/10.1017/AAP.2020.11. [39] Agiso Pho oScan so wa e, Agiso Me ashape, A ailable online: h ps://www. agiso .com/. accessed on Jan 30, 2020. [40] D.R. dos San os, A.P. Dal Poz, K. Khoshelham, Indi ec Geo e e encing o e es ial lase scanning da a using con ol lines, Pho og amm. Rec. 28 (2013) 276–292, h ps://doi.o g/10.1111/pho .12027. [41] E. Sanz-Ablanedo, J.H. Chandle , J.R. Rod íguez-P´ e ez, C. O d´ o˜ nez, Accu acy o Unmanned Ae ial Vehicle (UAV) and S M pho og amme y su ey as a unc ion o he numbe and loca ion o g ound con ol poin s used, Remo e Sens. 10 (2018) 1606, h ps://doi.o g/10.3390/RS10101606. [42] Geosys ems Leica Geosys ems, Leica FlexLine TS02/TS06/TS09 use manual, A ailable online: h ps://leica-geosys ems.com/, 2008. accessed on Ma 16, 2020. [43] J. Moyano, J.E. Nie o-Juli´ an, D. An ´ on, E. Cab e a, D. Bien enido-Hue as, N. S´ anchez, Sui abili y s udy o s uc u e- om-mo ion o he digi isa ion o a chi ec u al (he i age) spaces o apply di e gen pho og aph collec ion, Symme y (Basel). 12 (2020) 1981, h ps://doi.o g/10.3390/sym12121981. [44] J. Moyano, M. Fe n´ andez-Alconchel, J.E. Nie o-Juli´ an, M.J. Ca e e o-Ayuso, Me hodologies o de e mine geome ical simila i y pa e ns as expe imen al models o shapes in a chi ec u al he i age, Symme y 14 (2022) 1893, h ps://doi. o g/10.3390/SYM14091893. [45] M. Jaud, S. Passo , P. Allemand, N. Le Dan ec, P. G andjean, C. Delacou , Sugges ions o limi geome ic dis o ions in he econs uc ion o linea coas al land o ms by S M pho og amme y wi h Pho oScan® and MicMac® o UAV su eys wi h es ic ed GCPs pa e n, D ones 3 (2018) 2, h ps://doi.o g/10.3390/ d ones3010002. [46] P. Da id, H. Da k able, A ailable online: h ps://www.da k able.o g/, 2025. accessed on Jan 30, 2020. [47] Minis e io de Hacienda y Funci´ on Pública Sede Elec ´ onica del Ca as o - Inicio, A ailable online, h ps://www.sedeca as o.gob.es/, 2025. accessed on Jan 2, 2024. [48] J. Moyano, J. Le´ on, J.E. Nie o-Juli´ an, S. B uno, Seman ic in e p e a ion o a chi ec u al and a chaeological geome ies: poin cloud segmen a ion o HBIM pa ame e isa ion, Au om. Cons . 130 (2021) 103856, h ps://doi.o g/10.1016/J. AUTCON.2021.103856. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 20 [49] G a iso A chiCAD, A ailable online, h ps://www.g aphiso .com/a chicad/, 2019. accessed on Aug 6, 2019. [50] L. Sanhudo, N.M.M. Ramos, J.P. Ma ins, R.M.S.F. Almeida, E. Ba ei a, M. L. Sim˜ oes, V. Ca doso, A amewo k o in-si u geome ic da a acquisi ion using lase scanning o BIM modelling, J. Build. Eng. 28 (2020) 101073, h ps://doi. o g/10.1016/J.JOBE.2019.101073. [51] G. S iny, J. Gips, Shape g amma s and he gene a i e speci ica ion o pain ing and sculp u e, in: P oceedings o he In o ma ion P ocessing 71, 1972. [52] S. Becke , Gene a ion and applica ion o ules o quali y dependen açade econs uc ion, ISPRS J. Pho og amm. Remo e Sens. 64 (2009) 640–653, h ps:// doi.o g/10.1016/J.ISPRSJPRS.2009.06.002. [53] L. Flo iano, M. Liuzzo, G. Ma gani, Geome ic cha ac e iza ion o la e-ba oque domes in Sicily, Nexus Ne wo k Jou nal 24 (2022) 423–443, h ps://doi.o g/ 10.1007/S00004-022-00594-Z/FIGURES/13. [54] R. Spallone, M. Vi ali, Complex aul ed sys ems: geome y and a chi ec u e om design o cons uc ion, Nexus Ne wo k Jou nal 22 (2020) 799–809, h ps://doi. o g/10.1007/S00004-020-00537-6/METRICS. [55] Hexagon, Leica Geosys ems 3DReshape Poin Cloud P ocessing So wa e, A ailable online, h ps://leica-geosys ems.com/es-es/p oduc s/lase -scanne s/so wa e/3d eshape . accessed on Ma 27, 2023. [56] M. Capone, E. Lanza a, Scan- o-BIM s 3D ideal model HBIM: pa ame ic ools o s udy domes geome y, ISPRS Ann. Pho og amm. Remo e Sens. Spa . In o m. Sci. 42 (2019) 219–226. [57] J. Moyano, J.E. Nie o-Juli´ an, L.M. Lenin, S. B uno, Ope abili y o poin cloud da a in an a chi ec u al he i age in o ma ion model, In . J. A chi . He i . (2021) 1–20, h ps://doi.o g/10.1080/15583058.2021.1900951. [58] D. Gi a deau-Mon au , Cloud- o-Mesh Dis ance, A ailable online, h p://www.clo udcompa e.o g/doc/wiki/index.php? i le=Cloud- o-Mesh_Dis ance. [59] U.S. Ins i u e o BUILDING Documen a ion USIBD Le el o Accu acy (LOA) Speci ica ion Guide Documen C120 TM [Guide] Ve sion 2.0–2016 Guide o USIBD Documen C220 TM : Le el o Accu acy (LOA) Speci ica ion o Building Documen a ion, A ailable online: h ps://cdn.ymaws.com/www.nysapls.o g/ eso u ce/ esmg /2019_con e ence/handou s/hale-g_bim_loa_guide_c120_ 2.pd , 2025. [60] L. Michel, X. B une aud, M. Mukh a , B. Coigna d, Digi al sculp u es ebuil o compu a ion, in: P oc. Digi . 2013 - Fed. 19 h In ’l VSMM, 10 h Eu og aphics GCH, 2nd UNESCO Mem. Wo ld Con . Plus Spec. Sess. omCAA, A queol. 2.0 al 2, 2013, p. 453, h ps://doi.o g/10.1109/DIGITALHERITAGE.2013.6744808. [61] J. Hayes, S. Fai, S. K e z, C. Ouime , P. Whi e, Digi ally-assis ed s one ca ing o a elie sculp u e o he pa liamen buildings Na ional His o ic Si e o Canada, ISPAn II5 (2015) 97–103, h ps://doi.o g/10.5194/ISPRSANNALS-II-5-W3-97- 2015. [62] J. Moyano, E. Cab e a-Re uel a, J.E. Nie o-Juli´ an, M. Fe n´ andez-Alconchel, P. Fe n´ andez-Valde ama, E alua ion o geome ic da a egis a ion o small objec s om non-in asi e echniques: applicabili y o he HBIM ield, Senso s 23 (2023) 1730, h ps://doi.o g/10.3390/S23031730. [63] G. Keenaghan, E. Meegan, S. Scandu a, A. Co ns, A. Chenaux, A. Sanse e ino, B. Messina, M. Limongiello, C.G. Guida, An HBIM me hodology o he accu a e and geo e e enced econs uc ion o u ban con ex s su eyed by UAV: The case o he cas le o Cha les V, Remo e Sens. 14 (2022) 3688, h ps://doi.o g/10.3390/ RS14153688. [64] X. Yang, M. Koehl, P. G ussenmeye , Mesh- o-bim: om segmen ed mesh elemen s o bim model wi h limi ed pa ame e s, In . A ch. Pho og amm. Remo e Sens. Spa . In . Sci. - ISPRS A ch. 42 (2018) 1213–1218, h ps://doi.o g/10.5194/isp s- a chi es-XLII-2-1213-2018. [65] M. In ignano, S.A. Bianca do, C. O e o, N. Viscione, R. Ve opalumbo, F. Russo, G. Ausiello, G. Dell’acqua, A scan- o-BIM me hodology applied o s one pa emen s in a chaeological si es, He i 4 (2021) 3032–3049, h ps://doi.o g/10.3390/ HERITAGE4040169. [66] R. Mache e, A.P. Falc˜ ao, A.B. Gonçal es, M. Godinho, R. Ben o, De elopmen o a Manueline s yle objec lib a y o he i age BIM, In . J. A chi . He i . (2020), h ps://doi.o g/10.1080/15583058.2020.1740825. [67] Robe McNeel & Associa es G asshoppe G asshoppe , A ailable online, h p s://www.g asshoppe 3d.com/, 2025. accessed on Ma 4, 2020. [68] V. C oce, G. Ca o i, A. Piemon e, L. De Luca, P. V´ e on, H-BIM and a i icial in elligence: classi ica ion o a chi ec u al he i age o semi-au oma ic scan- o-BIM econs uc ion, Senso s 23 (2023) 2497, h ps://doi.o g/10.3390/S23052497. [69] G. Colia, S uc u al Heal h Moni o ing (SHM), He i age building in o ma ion modelling (HBIM) and emo e sensing o exis ing b idge, 2021. [70] K. Themis ocleous, A. Agapiou, D. Hadjimi sis, K. Themis ocleous, A. Agapiou, D. Hadjimi sis, 3D documen a ion and BIM modeling o cul u al he i age s uc u es using UAVs: he case o he Foinika ia chu ch, ISPA 62W2 (2016) 45–49, h ps:// doi.o g/10.5194/ISPRS-ARCHIVES-XLII-2-W2-45-2016. [71] M. Kazhdan, M. Boli ho, H. Hoppe, Poisson su ace econs uc ion, in: P oceedings o he Eu og aphics Symposium on Geome y P ocessing, 2006, pp. 1–10. [72] M. G´ omez Mo a, R. Rod íguez Rod íguez, Modelado idimensional de obje os he e og´ eneos a pa i de im´ agenes m´ edicas: He amien as y algo i mos, in: FABBECOR.ONG (Ed.), P oceedings o he Cong eso In e nacional M´ exico- Colombia CICOM 2018 MEMORIAS Oc ub e 11, 2018, pp. 67–72 (ISSN: 2462- 9588). [73] Cignoni, P.; Callie i, M.; Co sini, M.; Dellepiane, M.; Gano elli, F.; Ranzuglia, G. MeshLab: an open-sou ce mesh p ocessing ool. In P oceedings o he In Eu og aphics I alian Chap e Con e ence; Sca ano, V., De Chia a, R., E a, U., Eds.; The Eu og aphics Associa ion: Sale no, I aly, 2008. ch ome-ex ension:// e aidnbmnnnibpcajpcglcle indmkaj/h ps://diglib.eg.o g/se e /api/co e/ bi s eams/eb20 1e6-5138-42b -8b32- 4326a619969/con en . [74] J. Mo el, A. Bac, C. V´ ega, Su ace econs uc ion o incomple e da ase s: a no el Poisson su ace app oach based on CSRBF, Compu . G aph. 74 (2018) 44–55, h ps://doi.o g/10.1016/J.CAG.2018.05.004. [75] Belnde Benchma k So wa e Blende , A ailable online, h ps://www.blende .o g/ download/, 2025. accessed on Ap 5, 2023. [76] D. Di Dona o, R. Mo gan i, A. Tosone, M. Abi a, P ocedu al modelling o Hbim o I alian ailways I on b idges, ISPA 46W1 (2022) 207–214, h ps://doi.o g/ 10.5194/ISPRS-ARCHIVES-XLVI-2-W1-2022-207-2022. [77] E.S. Malin e ni, F. Ma iano, F. Di S e ano, L. Pe e a, F. Ono i, Modelling in hbim o documen ma e ials decay by a hema ic mapping o manage he cul u al he i age: he case o “chiesa della pie ` a” in e mo. In p oceedings o he ISPRS annals o he pho og amme y, Remo e Sensing and Spa ial In o ma ion Sciences; Cope nicus GmbH 42 (2019) 777–784, h ps://doi.o g/10.5194/isp s-a chi es- XLII-2-W11-777-2019. [78] BuildingSMART Spain Guía de Sis emas de Clasi icaci´ on cuando se u iliza BIM, A ailable online: h ps://www.buildingsma .es/ ecu sos/clasi icaci´ on-en-los-mo delos, 2025. [79] J. Moyano, E. Ca e˜ no, J.E. Nie o-Juli´ an, I. Gil-A iz´ on, S. B uno, Sys ema ic app oach o gene a e his o ical building in o ma ion modelling (HBIM) in a chi ec u al es o a ion p ojec , Au om. Cons . 143 (2022) 104551, h ps://doi. o g/10.1016/J.AUTCON.2022.104551. [80] EspacioBIM GuBIMClass, ¿qu´ e es GuBIMClass? | Espacio BIM, A ailable online, h ps://www.espaciobim.com/gubimclass. accessed on Ap 8, 2021. [81] O.C. Sys em, OmniClass® - Cons uc ion Speci ica ions Ins i u e, A ailable online: h ps://www.csi esou ces.o g/s anda ds/omniclass. accessed on Ap 8, 2021. [82] J. Moyano, A. Musicco, J.E. Nie o-Juli´ an, J.P. Domínguez-Mo ales, Geome ic cha ac e iza ion and segmen a ion o his o ic buildings using classi ica ion algo i hms and con olu ional ne wo ks in HBIM, Au om. Cons . 167 (2024) 105728, h ps://doi.o g/10.1016/J.AUTCON.2024.105728. [83] G. Samma ano, M. P e i ali, F. Ban i, Pa ame ic gene a ion in Hbim wo k lows o slam-based da a: discussing expec a ions on sui abili y and accu acy, in: P oceedings o he P oceedings o he join in e na ional e en 9 h ARQUEOL´ OGICA 2.0 & 3 d GEORES, 2021, pp. 374–388, h ps://doi.o g/ 10.4995/a queologica9.2021.12155. [84] S. Rusinkiewicz, M. Le oy, E icien a ian s o he ICP algo i hm, in: P oc. In . Con . 3-D Digi . Imaging Model. 3DIM, 2001, pp. 145–152, h ps://doi.o g/ 10.1109/IM.2001.924423. [85] U. S illa, Y. Xu, Change de ec ion o u ban objec s using 3D poin clouds: a e iew, ISPRS J. Pho og amm. Remo e Sens. 197 (2023) 228–255, h ps://doi.o g/ 10.1016/J.ISPRSJPRS.2023.01.010. [86] T. Cze niawski, J.W. Ma, Fe nanda Lei e au oma ed building change de ec ion wi h amodal comple ion o poin clouds, Au om. Cons . 124 (2021) 103568, h ps:// doi.o g/10.1016/J.AUTCON.2021.103568. [87] M. Heida i Moza a , M. Va shosaz, Op imal placemen o a e es ial lase scanne wi h an emphasis on educing occlusions, Pho og amm. Rec. 31 (2016) 374–393, h ps://doi.o g/10.1111/PHOR.12162. [88] H. So ia, E. Anas, O. Faiz, Mobile mapping, machine lea ning and digi al win o oad in as uc u e moni o ing and main enance: Case s udy o mohammed VI b idge in Mo occo, in: P oc. - 2020 IEEE In . Con . Mo occan Geoma ics, MORGEO 2020, 2020, h ps://doi.o g/10.1109/MORGEO49228.2020.9121882. [89] Geosys ems, L, Leica Cyclone REGISTER 360-3D Lase Scanning Poin Cloud Regis a ion So wa e, A ailable online, h ps://leica-geosys ems.com/p oduc s/la se -scanne s/so wa e/leica-cyclone/leica-cyclone- egis e -360. accessed on Jan 24, 2021. [90] M. Koehl, D. Schuelle , O. Ba o , S. Guillemin, M. Koehl, D. Schuelle , O. Ba o , S. Guillemin, D modelling o am unnel om Tls poin clouds o echnical documen a ion and ex ac ion o cha ac e is ic lines, ISPA 43B2 (2022) 1047–1054, h ps://doi.o g/10.5194/ISPRS-ARCHIVES-XLIII-B2-2022-1047-2022. [91] V. Gikas, Th ee-dimensional lase scanning o geome y documen a ion and cons uc ion managemen o highway unnels du ing exca a ion, Senso s 12 (2012) 11249–11270, h ps://doi.o g/10.3390/S120811249. [92] J. Xiang, Resea ch on de o ma ion moni o ing o unnel enginee ing based on 3D lase scanning, Appl. Ma h. Nonlinea Sci. (2022), h ps://doi.o g/10.2478/ AMNS.2021.2.00204. [93] J. Moyano, C.P. Od iozola, J.E. Nie o-Juli´ an, J.M. Va gas, J.A. Ba e a, J. Le´ on, B inging BIM o a chaeological he i age: in e disciplina y me hod/s a egy and accu acy applied o a megali hic monumen o he coppe age, J. Cul . He i . (2020), h ps://doi.o g/10.1016/j.culhe .2020.03.010. [94] PlanBim de CORFO Es ´ anda BIM pa a P oyec os Públicos, In e cambio de in o maci´ on en e solici an e y p o eedo es, A ailable online: h ps://planbim. cl/download/es anda -bim-pa a-p oyec os-publicos/. accessed on Ap 14, 2023. [95] U. Hi schbe g, A. S eilein, CAAD mee s digi al pho og amme y: modelling “weak o ms” o compu e measu emen , Au om. Cons . 5 (1996) 171–183, h ps://doi. o g/10.1016/0926-5805(96)00144-6. J. Moyano e al. Au oma ion in Cons uc ion 175 (2025) 106213 21